SUM-76-5.53 Matchmaker ODOT District 4 Headquarters 2088 South Arlington Road Akron, OH 44306 January 31, 2019 Project Overview This project has 3 parts. Part 1 consists of the widening of I-76 between Central Avenue and the Kenmore Leg,


slide-1
SLIDE 1

SUM-76-5.53

Matchmaker

ODOT District 4 Headquarters 2088 South Arlington Road Akron, OH 44306 January 31, 2019

slide-2
SLIDE 2

Project Overview

This project has 3 parts. Part 1 consists of the widening of I-76 between Central Avenue and the Kenmore Leg, as well as the reconstruction and reconfiguration of the East Ave./Wooster Rd./State

  • St. interchange. This part also includes the removal
  • f the bridge over Central Ave. and the replacement
  • f the I-76 bridge over Wooster Rd.

Part 1 Estimated Cost $22.6M

slide-3
SLIDE 3

Project Site Plan – Part 1

slide-4
SLIDE 4

Project Overview

Part 2 consists of the resurfacing 1.79 miles of S.R. 619 in the City of Barberton from Elmwood St. to Hiram St. and from Harding Ave. to Lake Ave. This will also include some minor bridge work on 2 bridges along I-76, 1 bridge on I-277 and 3 bridges on S.R. 619.

Part 2 Estimated Cost $1.2M

slide-5
SLIDE 5

Title

Subtitle Date

Title

Subtitle Date

Project Site Plan - Part 2 (Resurfacing)

slide-6
SLIDE 6

Title

Subtitle Date

Title

Subtitle Date

Project Site Plan – Part 2 (Bridge Work)

slide-7
SLIDE 7

Project Overview

Part 3 consists of the removal and replacement of the existing backwalls and approach slabs on a bridge along I-76 just north of the Kenmore Leg.

Part 3 Estimated Cost $1.5M

slide-8
SLIDE 8

Title

Subtitle Date

Title

Subtitle Date

Project Site Plan – Part 3

slide-9
SLIDE 9

Title

Subtitle Date

Title

Subtitle Date

SUM-76-5.53 (PID 96670)

  • Sale Date: 05/02/19
  • Award Date: 05/13/19

Anticipated Project Schedule

NOTE: This project has experienced delay in Federal Authorization

slide-10
SLIDE 10

CODE DESCRIPTION 1 Clearing & Grubbing 2 Building Removal 4 Roadway Excavation & Embankment 7 Soil Stabilization 8

  • Temp. soil erosion and sediment control

9 Aggregate Bases 10 Flexible Paving 12 Rigid Paving 13 Pavement Planning, Milling, Scarification 19 Structure Removal 21 Level 2 Bridge 22 Level 3 Bridge 23 Reinforcing Steel 24 Structural Steel Erection 25 Stud Welding 26 Structural Steel Painting 27 Expansion & Contraction Joints, Joint Sealers, Bearing Devices CODE DESCRIPTION 34 Earth Retaining Structures 35 Drainage (culverts, misc.) 36 Guardrail/Attenuators 37 Fence 39 Maintenance of Traffic 40 waterproofing 41 raised pavement markers 42 Signing 43 Highway Lighting 44 Traffic Signals-Standard 45 Pavement Markings 53 Piling 57 Sealing of Concrete Surfaces with Epoxy or non-epoxy Sealers

Anticipated Project Work Types

slide-11
SLIDE 11

Title

Subtitle Date

Title

Subtitle Date

1 – Clearing and Grubbing 4 – Roadway Excavation and Embankment Construction 7 – Soil Stabilization 9 – Aggregate Bases 10 – Flexible Paving 12 – Rigid Paving 13 – Pavement Planning, Milling, Scarification 36 – Guardrail/Attenuators 37 - Fence

Roadway & Pavement Work Types

Roadway & Pavement work

Estimated Cost $6.4 M

slide-12
SLIDE 12

Title

Subtitle Date

Title

Subtitle Date 19 – Structure Removal 21 – Level 2 Bridge 22 – Level 3 Bridge 23 – Reinforcing Steel 24 – Structural Steel Erection 25 – Stud Welding 26 – Structural Steel Painting 27 – Expansion & Contraction Joints, Joint Sealers, Bearing Devices 34 – Earth Retaining Structures 40 – Waterproofing 53 – Piling 57 – Sealing of Concrete Surfaces with Epoxy

  • r Non-Epoxy Sealers

Structure and Retaining Wall Work Types

Structure work

Estimated Cost $11.5 M

slide-13
SLIDE 13

Title

Subtitle Date

Title

Subtitle Date

8 – Temp. Soil Erosion and Sediment Control 35 – Drainage (Culverts, misc.)

Drainage and Erosion Control Work Types

Drainage and Erosion Control Work

Estimated Cost $1.2 M

slide-14
SLIDE 14

Title

Subtitle Date

Title

Subtitle Date

41 – Raised Pavement Markers 42 – Signing 43 – Highway Lighting 44 – Traffic Signals, Standard 45 – Pavement Markings

Traffic Control, Signals, Lighting Work Types

Traffic Control, Signals, Lighting Work

Estimated Cost $1.2 M

slide-15
SLIDE 15

Title

Subtitle Date

Title

Subtitle Date

39 – Maintenance of Traffic Phases and Detours EMS Coordination

Maintenance of Traffic Work Types

Maintenance of Traffic Work

Estimated Cost $2.6 M

slide-16
SLIDE 16

Title

Subtitle Date

Title

Subtitle Date

Estimated Project Cost (Parts 1, 2 & 3)

Total Estimated Project Cost Cost $25.3 M

slide-17
SLIDE 17

Disadvantage Business Enterprise (DBE)

  • Contains the Proposal Note 013 - Disadvantaged

Business Enterprise (DBE) Utilization Plan And Good Faith Efforts, updated 04/20/2018

  • All Bidders shall submit a DBE Utilization Plan at the

time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal.

  • DBE Certification Directory
  • http://www.dot.state.oh.us/Divisions/ODI/SDBE/Pa

ges/DBE-Directory.aspx

slide-18
SLIDE 18

Thank You for Attending