SUM-8-7.81 MATCHMAKER AKRON, MAY 14, 2018 PROJECT DESCRIPTION o Total pavement replacement from Graham Road (SLM 7.60) to just North of SR-303 (SLM 13.30), in the cities of Stow and Hudson, Summit County, Ohio. Also includes miscellaneous


slide-1
SLIDE 1

SUM-8-7.81 MATCHMAKER• AKRON, MAY 14, 2018

slide-2
SLIDE 2

2 |

PROJECT DESCRIPTION

  • Total pavement replacement from Graham

Road (SLM 7.60) to just North of SR-303 (SLM 13.30), in the cities of Stow and Hudson, Summit County, Ohio. Also includes miscellaneous bridge work, and slide repair.

SUM-8-7.81 Matchmaker

slide-3
SLIDE 3

3 |

PROJECT DESCRIPTION

  • Project consists of…
  • complete pavement replacement for over 6 miles of

SR 8

  • Subgrade stabilization
  • 2 bridge deck replacements
  • Drainage and signing replacement
  • Noise wall construction

SUM-8-7.81 Matchmaker

slide-4
SLIDE 4

4 |

PROJECT AREIAL VIEW

  • Project limits are on

State Route 8 from Graham Road to State Route 303

SUM-8-7.81 Matchmaker

slide-5
SLIDE 5

5 |

PROJECT SCHEDULE

  • Sale Date: 7/12/2018
  • Anticipated Award Date: 7/23/2018
  • Anticipated Project Completion:

7/31/2022 Estimated Cost: $49 Million

SUM-8-7.81 Matchmaker

slide-6
SLIDE 6

6 |

DISADVANTAGED BUSINESS ENTERPRISE (DBE)

  • Contained in the Proposal is Note 013 -

Disadvantaged Business Enterprise (DBE) Utilization Plan And Good Faith Efforts, updated 05/29/2015

  • All Bidders shall submit a DBE Utilization Plan at the

time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal.

  • 11% DBE Goal

SUM-8-7.81 Matchmaker

slide-7
SLIDE 7

7 |

DISADVANTAGED BUSINESS ENTERPRISE (DBE)

  • Clearing & Grubbing
  • Incidental Grading
  • Soil Stabilization
  • Temp. Soil Erosion and

Sediment Control

  • Aggregate Bases
  • Apply Bituminous

Treatments

  • Concrete Texturing
  • Sawing
  • Flexible Replacement
  • Rigid Pavement

Replacement

  • Structure Removal
  • Reinforcing Steel
  • Structural Steel Erection
  • Stud Welding
  • Expansion & Contraction

Joints, Joint Sealer, Bearing Devices

  • Drainage (culverts, misc.)
  • Guardrail/Attenuators
  • Fence
  • Misc. Concrete
  • Maintenance of Traffic
  • Waterproofing
  • Raised Pavement Markers
  • Signing
  • Highway Lighting
  • Traffic Signals-Standard
  • Pavement Markings
  • Mowing
  • Trucking
  • Piling

SUM-8-7.81 Matchmaker

Anticipated Construction Opportunities:

slide-8
SLIDE 8

8 |

DISADVANTAGED BUSINESS ENTERPRISE (DBE)

  • DBE certified firms:
  • http://www.dot.state.oh.us/Divisions/ODI/SDBE/Pages/D

BE-Directory.aspx

SUM-8-7.81 Matchmaker

slide-9
SLIDE 9

9 |

Thank you for Attending

CONCLUSION

Last updated 5/14/2018

SUM-8-7.81 Matchmaker