PID 93594 LUC-75-1.10 MATCHMAKER EVENT ODOT PROJECT 180277 Doug - - PowerPoint PPT Presentation

pid 93594 luc 75 1 10
SMART_READER_LITE
LIVE PREVIEW

PID 93594 LUC-75-1.10 MATCHMAKER EVENT ODOT PROJECT 180277 Doug - - PowerPoint PPT Presentation

PID 93594 LUC-75-1.10 MATCHMAKER EVENT ODOT PROJECT 180277 Doug Rogers, P.E., Project Manager Mark Mondora, P.E., Area Engineer Lisa Washington, Northwest Regional Outreach Manager Mike Gramza, P.E., Capital Programs Administrator 1 | PID


slide-1
SLIDE 1

1 |

PID 93594 LUC-75-1.10

MATCHMAKER EVENT ODOT PROJECT 180277

Doug Rogers, P.E., Project Manager Mark Mondora, P.E., Area Engineer Lisa Washington, Northwest Regional Outreach Manager Mike Gramza, P.E., Capital Programs Administrator

PID 93594 LUC-75-1.10 - ODOT District Two

slide-2
SLIDE 2

2 |

PID 93594 LUC-75-1.10 PROJECT 180277

KEY DATES

  • Project Sale May 17, 2018
  • Project Award May 28, 2018
  • Estimated Completion Date June 30, 2022

PID 93594 LUC-75-1.10 Modification 4 Resolution - ODOT District Two

slide-3
SLIDE 3

3 |

PROJECT OVERVIEW

PID 93594 LUC-75-1.10 - ODOT District Two

slide-4
SLIDE 4

4 |

MAJOR WORK ON PROJECT

  • Widen IR 75 to 3 lanes in both directions – South Avenue to north of

Dorr Street.

  • Replacement of pavement on the Anthony Wayne trail from City

Park to the new downtown gateway

  • Change Anthony Wayne Trail Interchange on-ramps to left

entrances.

  • Reconstruction of 9 ramps
  • Construction of 10 bridge (3 overhead bridges)

PID 93594 LUC-75-1.10 - ODOT District Two

slide-5
SLIDE 5

5 |

SUMMARY OF PROJECT MATERIALS

PID 93594 LUC-75-1.10 - ODOT District Two

Roadway

  • 38,800 CY of Asphalt Base, 7,153 CY of Asphalt

Concrete Surface, 7,241 CY of Asphalt Concrete Intermediate.

  • 17,243 SY of 13.5” Non-reinforced Concrete

pavement, Class QC1.

  • 124,075 SY of Cement Stabilization.
  • 7564 FT of Curb
  • 7511 FT of Single-Slope Concrete Barrier
slide-6
SLIDE 6

6 |

SUMMARY OF PROJECT MATERIALS

PID 93594 LUC-75-1.10 - ODOT District Two

Structures

  • 6,475,269 LB Reinforcing Steel
  • 71,408 FT 12” Cast-in-Place Reinforced

Concrete Piles

  • 28,290 CY of Class QC1 and QC2 Concrete

for Bridges

  • 18,756 FT Drilled Shafts
slide-7
SLIDE 7

7 |

SUMMARY OF PROJECT MATERIALS

PID 93594 LUC-75-1.10 - ODOT District Two

Structures

  • 3999 SY of Reinforced Concrete Approach

Slabs

  • 2982 SF of MSE Walls
  • 34,053 SY of Epoxy-Urethane Sealer
  • 2173 SY of Non-Epoxy Sealer
slide-8
SLIDE 8

8 |

SUMMARY OF PROJECT MATERIALS

PID 93594 LUC-75-1.10 Modification 4 Resolution - ODOT District Two

  • Misc. Work
  • 2982 SF of MSE Walls
  • 33,665 FT Conduit
  • Vandal Fence
  • Sidewalk/bike paths
  • Highway lighting
  • Sewer work
  • Traffic Signal
slide-9
SLIDE 9

9 |

DISADVANTAGED BUSINESS ENTERPRISE (DBE)

PID 93594 LUC-75-1.10 - ODOT District Two

DBE Goal – 12%

  • Contains the Proposal Note 013-Disadvantaged

Business Enterprise (DBE) Utilization Plan and Good Faith Efforts updated 07/21/2017

  • All bidders shall submit a DBE Utilization Plan at

the time of bid

slide-10
SLIDE 10

10 |

DISADVANTAGED BUSINESS ENTERPRISE (DBE)

PID 93594 LUC-75-1.10 - ODOT District Two

  • The plan should set forth specific information

demonstrating how bidder will achieve DBE Goal

  • Identify DBE Certified firms:

http://www.dot.state.oh.us/Divisions/ODI/SDBE/ Pages/DBE-Directory.aspx