pid 93594 luc 75 1 10
play

PID 93594 LUC-75-1.10 MATCHMAKER EVENT ODOT PROJECT 180277 Doug - PowerPoint PPT Presentation

PID 93594 LUC-75-1.10 MATCHMAKER EVENT ODOT PROJECT 180277 Doug Rogers, P.E., Project Manager Mark Mondora, P.E., Area Engineer Lisa Washington, Northwest Regional Outreach Manager Mike Gramza, P.E., Capital Programs Administrator 1 | PID


  1. PID 93594 LUC-75-1.10 MATCHMAKER EVENT ODOT PROJECT 180277 Doug Rogers, P.E., Project Manager Mark Mondora, P.E., Area Engineer Lisa Washington, Northwest Regional Outreach Manager Mike Gramza, P.E., Capital Programs Administrator 1 | PID 93594 LUC-75-1.10 - ODOT District Two

  2. PID 93594 LUC-75-1.10 PROJECT 180277 KEY DATES • Project Sale May 17, 2018 • Project Award May 28, 2018 • Estimated Completion Date June 30, 2022 2 | PID 93594 LUC-75-1.10 Modification 4 Resolution - ODOT District Two

  3. PROJECT OVERVIEW 3 | PID 93594 LUC-75-1.10 - ODOT District Two

  4. MAJOR WORK ON PROJECT o Widen IR 75 to 3 lanes in both directions – South Avenue to north of Dorr Street. o Replacement of pavement on the Anthony Wayne trail from City Park to the new downtown gateway o Change Anthony Wayne Trail Interchange on-ramps to left entrances. o Reconstruction of 9 ramps o Construction of 10 bridge (3 overhead bridges) 4 | PID 93594 LUC-75-1.10 - ODOT District Two

  5. SUMMARY OF PROJECT MATERIALS Roadway o 38,800 CY of Asphalt Base, 7,153 CY of Asphalt Concrete Surface, 7,241 CY of Asphalt Concrete Intermediate. o 17,243 SY of 13.5” Non-reinforced Concrete pavement, Class QC1. o 124,075 SY of Cement Stabilization. o 7564 FT of Curb o 7511 FT of Single-Slope Concrete Barrier 5 | PID 93594 LUC-75-1.10 - ODOT District Two

  6. SUMMARY OF PROJECT MATERIALS Structures o 6,475,269 LB Reinforcing Steel o 71,408 FT 12” Cast-in-Place Reinforced Concrete Piles o 28,290 CY of Class QC1 and QC2 Concrete for Bridges o 18,756 FT Drilled Shafts 6 | PID 93594 LUC-75-1.10 - ODOT District Two

  7. SUMMARY OF PROJECT MATERIALS Structures o 3999 SY of Reinforced Concrete Approach Slabs o 2982 SF of MSE Walls o 34,053 SY of Epoxy-Urethane Sealer o 2173 SY of Non-Epoxy Sealer 7 | PID 93594 LUC-75-1.10 - ODOT District Two

  8. SUMMARY OF PROJECT MATERIALS Misc. Work o 2982 SF of MSE Walls o 33,665 FT Conduit o Vandal Fence o Sidewalk/bike paths o Highway lighting o Sewer work o Traffic Signal 8 | PID 93594 LUC-75-1.10 Modification 4 Resolution - ODOT District Two

  9. DISADVANTAGED BUSINESS ENTERPRISE (DBE) DBE Goal – 12% o Contains the Proposal Note 013-Disadvantaged Business Enterprise (DBE) Utilization Plan and Good Faith Efforts updated 07/21/2017 o All bidders shall submit a DBE Utilization Plan at the time of bid 9 | PID 93594 LUC-75-1.10 - ODOT District Two

  10. DISADVANTAGED BUSINESS ENTERPRISE (DBE) o The plan should set forth specific information demonstrating how bidder will achieve DBE Goal o Identify DBE Certified firms: http://www.dot.state.oh.us/Divisions/ODI/SDBE/ Pages/DBE-Directory.aspx 10 | PID 93594 LUC-75-1.10 - ODOT District Two

  11. QUESTIONS ? Last updated 4/19/2018 11 | PID 93594 LUC-75-1.10 - ODOT District Two

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.