CUY UY-480 480-Valle alley y Vi View w Br Bridge dge Matchmaker April 20, 2017 Bureau of Workers Compensation 4800 E. 131 st Street Garfield Hts, 44125 Agenda Welcome Project Overview Prequalification & Work types


slide-1
SLIDE 1

CUY UY-480 480-Valle alley y Vi View w Br Bridge dge

Matchmaker

April 20, 2017 Bureau of Workers’ Compensation 4800 E. 131st Street Garfield Hts, 44125

slide-2
SLIDE 2

Agenda

2

Welcome Project Overview Prequalification & Work types Procurement Overview Matchmaker

slide-3
SLIDE 3

3

Proj

  • ject

ect Ov Over ervie iew

slide-4
SLIDE 4

4

Project

  • ject Location

cation

slide-5
SLIDE 5

Average Daily Traffic = 146,000 8% Trucks

  • Avg. Weekday = 163,000

Peak Average Daily Traffic = 180,000+

Distribution: East Bound/West Bound

AM Peak = 51/49 PM Peak = 48/52

5

Pr Project ject Location cation

slide-6
SLIDE 6
  • 4,155 ft long
  • 15 spans
  • 300 ft span lengths
  • 200 ft high
  • Steel Girders, Floor Beams

& Intermediate Stringers

  • Built in 1975
  • Carries 8 lanes

6

Ex Existin sting g Br Bridg idges es

slide-7
SLIDE 7

7

New w Str tructure ucture in Med edian an Re Re-Deck eck Ex Existing ting Str truc ucture tures

slide-8
SLIDE 8

8

Pr Prequa ualif lifications cations & An Anticipa ticipated ed Work k ty types pes

slide-9
SLIDE 9

Preq equalif ualifications ications (De Design sign)

9 CATE TEGO GORY Road adway: Complex Roadway Design Non-Complex Roadway Design Bicycle Facilities and Enhancement Design Bridge idge Desi sign: Level 2 Bridge Design Soils/ ils/Ge Geotec technica ical l Services ices: Geotechnical Engineering Services Geotechnical Testing Laboratory Geotechnical Field Exploration Services Geotechnical Drilling Inspection Services SUBSU

SURF RFACE CE UTILIT ITY ENGINEER NEERIN ING:

Highwa hway Lightin ting Desig ign: Complex Lighting Design ***All All preq equali lifie ied d engine ngineer ering ing consu nsultan ltants must t be prequalified in ODOT’s COST ACCOUNTING SYSTEM.

The Design ign Build ld Team am must ust list st rele levant ant prequalif alific icatio ation n categories egories for Consultant nsultant and Sub ub-Consu Consultants ltants to show that at the prequalif ualificati ication

  • n

requiremen uirements ts list sted ed are sati tisf sfie ied. d.

slide-10
SLIDE 10

Anticipated Work Types (Construction)

10 Code de Descr scrip iption tion 1 Clearing & Grubbing 4 Roadway Excavation and Embankment Construction 6 Incidental Grading 8 Temporary Soil Erosion & Sediment Control 9 Aggregate Bases 10 Flexible Paving 11 Apply Bituminous Treatments 13 Pavement Planing, Milling, Scarification 14 Concrete Texturing 15 Sawing 16 Flexible Replacement 22 Level 3 Bridge 23 Reinforcing Steel 24 Structural Steel Erection 25 Stud Welding 26 Structural Steel Painting 27 Expansion & Contraction Joints, Joint Sealers, Bearing Devices

slide-11
SLIDE 11

Anticipat ticipated ed Work rk Type pes s (Construction) struction)

11 Code de Descr scrip iption tion 28 Caissons/ Drilled Shafts 29 Structure Repairs 31 Structural Steel Repairs 35 Drainage ( culverts, misc.) 36 Guardrail / Attenuators 38

  • Misc. Concrete

40 Waterproofing 41 Raised Pavement Markers 42 Signing 43 Highway Lighting 45 Pavement Markings 46 Landscaping 47 Mowing 48 Trucking 53 Piling 57 Sealing of Concrete Surfaces with Epoxy or Non- epoxy Sealers

slide-12
SLIDE 12

12

Procurem

  • curemen

ent t Ov Over ervie iew

slide-13
SLIDE 13

De Design ign Build ld Low-Bid id Proje ject ct

  • Estimated Construction Cost - $300 Million
  • Two Step – Lowest Price & Technically Acceptable

Two Step

  • Short-list to 3 design build teams

RFP Process

  • Short-listed teams scheduled to have 3 one-on-one

meetings with ODOT to discuss project

  • Alternative Technical Concepts (ATCs) anticipated to be

accepted for review and approval by ODOT

Project

  • ject Procurement
  • curement

13

slide-14
SLIDE 14

Traylor Bros., Inc & Brayman Construction, Joint Venture Designer: COWI Design Independent Quality Firm: TRC Engineers Trumbull-Great Lakes-Ruhlin Joint Venture Designer: HDR Design Independent Quality Firm: TranSystems Walsh Construction Company II, LLC Designer: CH2M Hill Design Independent Quality Firm: Burgess & Niple, Inc.

Short-List Listed ed De Desi sign gn Bu Build ld Tea eams ms

14

slide-15
SLIDE 15

Technically Acceptable

  • Technical Proposals will be reviewed as “pass/fail”
  • Only Technical Proposals that are responsive will have

price proposal opened

Low Bid

  • Lowest responsive and responsible bidder will be

deemed the apparent low bidder

Project

  • ject Procurement
  • curement

15

slide-16
SLIDE 16

Pr Proc

  • cure

uremen ment t - Sch ched edule ule

16

Milest ston

  • ne

Date Request for Qualifications Released 01/27/2017 Statements of Qualifications Submitted 02/24/2017 DBE Subcontractor Informational 03/03/2017 Notification of Short-listing 04/04/2017 Project ct Matchmak chmaker er 04/20/20 /2017 Release Request for Proposals 05/04/2017 Technical and Price Proposals due 08/17/2017 Bids Opened 08/31/2017 Anticipated Award 09/11/2017 Estimated Construction Beginning 01/02/2018 Estimated Construction Completion 09/01/2023

slide-17
SLIDE 17

Begin to Advertise/Request for Proposals (RFP): Link to Construction Contracts web page: www.transportation.ohio.gov/contracts Click on Construction Contracts Click on Bidding Documents Listing on right side of page Project # 173002

How w to Fi Find nd Scope pe

17

slide-18
SLIDE 18
  • Project Goal – 12% DBE Goal
  • DBE Subcontractors/consultants/suppliers
  • http://www.dot.state.oh.us/Divisions/ODI/SDBE/Page

s/DBE-Directory.aspx

Disadvantaged Business Enterprise