1900 CRYSTAL DRIVE SPRC Meeting #3 DECEMBER 19, 2019 SPRC #2 - - PowerPoint PPT Presentation

1900 crystal drive
SMART_READER_LITE
LIVE PREVIEW

1900 CRYSTAL DRIVE SPRC Meeting #3 DECEMBER 19, 2019 SPRC #2 - - PowerPoint PPT Presentation

1900 CRYSTAL DRIVE SPRC Meeting #3 DECEMBER 19, 2019 SPRC #2 Follow-up SPRC #2 Follow-up: Alley Renderings Alley Renderings 4 Alley Renderings 5 SPRC #2 Follow-up: Bike Facilities Visitor Bike & Scooter Parking 7 SPRC #2 Follow-up:


slide-1
SLIDE 1

1900 CRYSTAL DRIVE

SPRC Meeting #3

DECEMBER 19, 2019

slide-2
SLIDE 2

SPRC #2 Follow-up

slide-3
SLIDE 3

SPRC #2 Follow-up: Alley Renderings

slide-4
SLIDE 4

Alley Renderings

4

slide-5
SLIDE 5

Alley Renderings

5

slide-6
SLIDE 6

SPRC #2 Follow-up: Bike Facilities

slide-7
SLIDE 7

Visitor Bike & Scooter Parking

7

slide-8
SLIDE 8

SPRC #2 Follow-up: Architecture & Massing

slide-9
SLIDE 9

Architectural Feature

9

Previous Current

slide-10
SLIDE 10

Open Space & Landscaping: Connection to Future Center Park

slide-11
SLIDE 11

Stair Option A: Hanging Gardens

11

slide-12
SLIDE 12

Stair Option A: Hanging Gardens

12

slide-13
SLIDE 13

Stair Option B: Lombard Street

13

slide-14
SLIDE 14

Stair Option B: Lombard Street

14

slide-15
SLIDE 15

Stair Option C: Urban Ascent

15

slide-16
SLIDE 16

Stair Option C: Urban Ascent

16

slide-17
SLIDE 17

Stair Options

17

slide-18
SLIDE 18

Stair Options

18

slide-19
SLIDE 19

Typical Soil Section

19

slide-20
SLIDE 20

Stair Options

20

slide-21
SLIDE 21

Stair Options

21

slide-22
SLIDE 22

Open Space & Landscaping: Ground Floor Trees & Landscaping

slide-23
SLIDE 23

Ground Floor

23

slide-24
SLIDE 24

Street Trees

24

Typical Tree Planting Detail (Crystal Dr/18th/20th)

slide-25
SLIDE 25

Open Space & Landscaping: Private Open Space

slide-26
SLIDE 26

South Tower

26

UPDATING GRAPHICS

slide-27
SLIDE 27

South Tower

27

slide-28
SLIDE 28

South Tower

28

slide-29
SLIDE 29

South Tower

29

slide-30
SLIDE 30

South Tower

30

slide-31
SLIDE 31

South Tower

31

slide-32
SLIDE 32

North Tower

32

slide-33
SLIDE 33

North Tower

33

slide-34
SLIDE 34

North Tower

34

slide-35
SLIDE 35

North Tower

35

slide-36
SLIDE 36

Planted Loggias

36

slide-37
SLIDE 37

Community Benefits & Site Improvements

slide-38
SLIDE 38

Site Improvements

  • New sidewalk, curb, and gutter
  • New street trees and landscaping
  • Site furniture and visitor bike racks
  • New streetlights
  • Connection from Crystal Drive to Center Park
  • Monumental Stair
  • Retail alley

38

slide-39
SLIDE 39

Community Benefits

  • Public easement over Center Park Phase I (~45,000 sf) and design of park in post-approval process
  • Design and construction of Center Park monumental stair
  • Ordinance standard affordable housing contribution
  • LEED Silver with Two Arlington Priority Credits

– 9% Energy Reduction – Building Envelope Commissioning

  • 1:1 bike parking for residential units
  • Covered public bike and scooter parking

39

slide-40
SLIDE 40

Phasing & Construction

slide-41
SLIDE 41

Construction Timeline

41

Excavation Start May 2020 Excavation Complete / Structure Start October 2020 Below Grade Structure Complete Q3 2021 Above Grade Structure Topping Out Q2 2022 Substantial Completion Q4 2023

slide-42
SLIDE 42

Site Logistics

42

slide-43
SLIDE 43

1900 CRYSTAL DRIVE

LRPC Follow Up

DECEMBER 19, 2019

slide-44
SLIDE 44

Green Tail

slide-45
SLIDE 45

Proposed Block Plan

Sector Plan

45

Figure 3.2.2, pg. 33 CCSP

Proposed Block Plan

Site Build-to Lines

slide-46
SLIDE 46

Final Condition

Sector Plan

46

Figure 3.2.2, pg. 33 CCSP

Proposed Final Condition

Site Build-to Lines