1900 CRYSTAL DRIVE
SPRC Meeting #3
DECEMBER 19, 2019
1900 CRYSTAL DRIVE SPRC Meeting #3 DECEMBER 19, 2019 SPRC #2 - - PowerPoint PPT Presentation
1900 CRYSTAL DRIVE SPRC Meeting #3 DECEMBER 19, 2019 SPRC #2 Follow-up SPRC #2 Follow-up: Alley Renderings Alley Renderings 4 Alley Renderings 5 SPRC #2 Follow-up: Bike Facilities Visitor Bike & Scooter Parking 7 SPRC #2 Follow-up:
DECEMBER 19, 2019
4
5
7
9
Previous Current
11
12
13
14
15
16
17
18
19
20
21
23
24
Typical Tree Planting Detail (Crystal Dr/18th/20th)
26
UPDATING GRAPHICS
27
28
29
30
31
32
33
34
35
36
38
– 9% Energy Reduction – Building Envelope Commissioning
39
41
Excavation Start May 2020 Excavation Complete / Structure Start October 2020 Below Grade Structure Complete Q3 2021 Above Grade Structure Topping Out Q2 2022 Substantial Completion Q4 2023
42
DECEMBER 19, 2019
Sector Plan
45
Figure 3.2.2, pg. 33 CCSP
Proposed Block Plan
Site Build-to Lines
Sector Plan
46
Figure 3.2.2, pg. 33 CCSP
Proposed Final Condition
Site Build-to Lines