CRYSTAL CITY CIVIC ASSOCIATION | FEB. 27, 2019
JBG SMITH OVERVIEW AND LISTENING SESSION CRYSTAL CITY CIVIC - - PowerPoint PPT Presentation
JBG SMITH OVERVIEW AND LISTENING SESSION CRYSTAL CITY CIVIC - - PowerPoint PPT Presentation
JBG SMITH OVERVIEW AND LISTENING SESSION CRYSTAL CITY CIVIC ASSOCIATION | FEB. 27, 2019 2121 CRYSTAL DRIVE 2121 CRYSTAL DRIVE O U R V I S I O N | S I T E P L A N Central District Retail 1770 Crystal Drive 18th Street Park 1770 CRYSTAL
2121 CRYSTAL DRIVE
2121 CRYSTAL DRIVE
O U R V I S I O N | S I T E P L A N
CENTRAL DISTRICT RETAIL 1770 CRYSTAL DRIVE 18TH STREET PARK
Central District Retail 1770 Crystal Drive 18th Street Park
S I T E P L A N | P L A Z A- P RO P O S E D
12
PHASE II 4.1 SUBMISSION
16
N AT I O N A L L A N D I N G | C RY STA L D R I V E
22
N AT I O N A L L A N D I N G | C RY STA L D R I V E
N AT I O N A L L A N D I N G | 1 7 70 C RY STA L D R I V E
1900 CRYSTAL DRIVE
1900 CRYSTAL DRIVE
N AT I O N A L L A N D I N G | 1 9 0 0 C RY STA L D R I V E
N O RT H E A ST V I E W
N AT I O N A L L A N D I N G | 1 9 0 0 C RY STA L D R I V E
S O U T H E A ST V I E W
KEY TRANSPORTATION PROJECTS
LONG BRIDGE NEW VRE STATION ROUTE 1 BLVD POTOMAC YARD METRO PEDESTRIAN BRIDGE TO DCA 2ND METRO ENTRANCE K E Y T R A N S P O RTAT I O N P R O J EC T S
P E D E ST R I A N B R I D G E TO D C A
Project Summary Lead Agency Status E C Pedestrian Bridge to DCA Proposed pedestrian bridge
- ver the CSX tracks and GW
Parkway directly linking National Landing with DCA Arlington County DES Included in HQ2-committed
- projects. Arlington
beginning planning and
- design. Approvals still
needed. $36,
itted age.
C RYSTA L C I T Y E A ST M E T R O E N T R A N C E
Project Summary Lead Agency Status E C Crystal City Metro East Entrance A new entrance to the existing Crystal City metro station serving Crystal Drive Arlington County DES Included in HQ2-committed
- projects. Preliminary
design nearly complete. $90,
R O U T E 1 B O U L E VA R D
Project Summary Lead Agency Status E Route 1 Boulevard Reconstruct Route 1 through National Landing as an at-grade boulevard in order to better connect East and West sides
- f CC
VDOT Included in HQ2-committed
- projects. VDOT to lead
design and construction. $250,
V R E STAT I O N
Project Summary Lead Agency Status E C VRE Station Replace the existing Crystal City VRE station with a larger, bi-directional station further south, connecting with proposed metro entrance and DCA ped bridge VRE Not included in HQ-2
- package. Conceptual
design complete. VRE preparing to issue RFP for 100% design in Q1 2019 $41,
P OTO M A C YA R D M E T R O STAT I O N
Project Summary Lead Agency Status E C Potomac Yard Metro Station New, infill Metro rail station along the blue/yellow lines in the Potomac Yard section of Alexandria Alexandria Original design complete, redesign to reincorporate 2nd entrance underway. $370,
L O N G B R I D G E
Project Summary Lead Agency Status E Long Bridge Construction of a new, two-track rail bridge over the Potomac River to supplement capacity of existing Long Bridge DDOT Preferred Alternative released by project team November 2018 includes separate bike/ped bridge as required mitigation to NPS $1,
L O N G B R I D G E
A M A ZO N H E A D Q UA RT E R S | S O U T H L A K E U N I O N , S E AT T L E
- “A N E I G H B O R H O O D, N OT A C A M P U S ”
- P L A C E M A K I N G
- R E TA I L A N D ST R E E T S C A P E
- PA R K S A N D O P E N S PA C E
A M A ZO N H E A D Q UA RT E R S | S O U T H L A K E U N I O N , S E AT T L E