OPEN SPACE FRAMEWORK PLAN PLAN OVERVIEW JBG Smith Of Place Hoerr - - PowerPoint PPT Presentation

open space framework plan
SMART_READER_LITE
LIVE PREVIEW

OPEN SPACE FRAMEWORK PLAN PLAN OVERVIEW JBG Smith Of Place Hoerr - - PowerPoint PPT Presentation

CRYSTAL CITY ARLINGTON, VIRGINIA JANUARY 14, 2020 OPEN SPACE FRAMEWORK PLAN PLAN OVERVIEW JBG Smith Of Place Hoerr Schaudt Landscape Architects AGENDA VISION + GOALS PROGRAMMING METHODOLOGY OPEN SPACE FRAMEWORK PLAN


slide-1
SLIDE 1

OPEN SPACE FRAMEWORK PLAN

CRYSTAL CITY PLAN OVERVIEW

ARLINGTON, VIRGINIA JANUARY 14, 2020

JBG Smith Of Place Hoerr Schaudt Landscape Architects

slide-2
SLIDE 2
  • VISION + GOALS
  • PROGRAMMING METHODOLOGY
  • OPEN SPACE FRAMEWORK PLAN
  • EXAMPLE ANALYSIS FOR PARK SPACES
  • COMMUNITY ENGAGEMENT PROCESS

AGENDA

slide-3
SLIDE 3

OPEN SPACE FRAMEWORK PLAN OVERVIEW January 14, 2020 3

VISION + GOALS

slide-4
SLIDE 4

OPEN SPACE FRAMEWORK PLAN OVERVIEW January 14, 2020 4

PROGRAMMING METHODOLOGY

TYPOLOGY PROGRAM ELEMENTS ACTIVATE

1 2 3 4

POCKET NATURE GATEWAY CIVIC

slide-5
SLIDE 5

1 14

12TH STREET NOT TO SCALE

2 3 R D S T R E E T CRYSTAL DRIVE EADS STREET

ELM STREET FERN STREET R I C H M O N D H I G H W A Y

2 T H STREET 1 8 T H S T R E E T 15TH STREET

7 2 8 12 13 3 9 4 10 6 5 11 JBG Smith Profgered Parks

Crystal Park Center Park 23rd Street Plaza

6 7 8 JBG Smith Parks

Water Park Friends Plaza The Common

1 2 3 4 5

Metro Market Square Gateway Park

Aspiratjonal Parks / By Others

Pocket Park #8 Garden Park North Gateway Park

11 12 13 9 10

Mets Park Pen Place Greenway Park

14

NOT TO SCALE

OPEN SPACE FRAMEWORK PLAN OVERVIEW January 14, 2020 5

OPEN SPACE FRAMEWORK PLAN

slide-6
SLIDE 6

OPEN SPACE FRAMEWORK PLAN OVERVIEW January 14, 2020 10

23RD STREET PLAZA

Plan Diagram Characteristics

A A

A

B

B

C

C

D

D Tree Bosques Dining Areas Flexible Seating Game Space Event Space Active Recreation Zone Passive Recreation

Frame Central Lawn

Tree Allees Garden Spaces Flexible Seating

D Pedestrian Street C B

Art/Sculpture Flexible Plaza Seating Water Feature

A Entry Plaza Small Gathering Space Tree Bosques Shade Pergolas

NEIGHBORHOOD ORIENTED MULTI-PURPOSE LAWN VISUALLY POROUS PORCH FRAME FOCAL ELEMENT VERDANT SLOPE AMENITY SPACE GATEWAY FLEXIBLE

slide-7
SLIDE 7

OPEN SPACE FRAMEWORK PLAN OVERVIEW January 14, 2020 11

CRYSTAL CITY PARK SECTOR PLAN PARK

23RD STREET PLAZA SECTOR PLAN PROGRAM COMPARISON

KEY

Key Plan

BENCHES/SEAT WALLS OUTDOOR DINING AREA WATER FEATURE ART/SCULPTURE ELEMENT GAME SPACE FLEXIBLE LAWN SMALL GATHERING SPACE CONTAINER GARDEN COVERED TRELLIS PEDESTRIAN PROMENADE GARDEN SPACE EVENT SPACE BENCHES CAFÉ SEATING CENTRAL FOUNTAIN/ SCULPTURE

23RD ST PLAZA 0.7 Acres Potential Program: 23RD ST PLAZA 0.3 Acres Potential Program:

HIGHLIGHTED: PROGRAM RECOMMENDED IN SECTOR PLAN

slide-8
SLIDE 8

Community Meetings Web Portal Direct Mail Save The Date Community Feedback Survey

OPEN SPACE FRAMEWORK PLAN OVERVIEW January 14, 2020 18

COMMUNITY ENGAGEMENT

slide-9
SLIDE 9

CONCLUSIONS: 1 MONTH CONSENSUS BUILDING: 2 MONTHS

COMMUNITY MEETING 1: COMMUNITY MEETING 2: COMMUNITY MEETING #3:

MOBILIZATION: 1 MONTH

PUBLIC RELATIONS CAMPAIGN TO INFORM COMMUNITY OF FORTHCOMING PROCESS: REVIEW SCOPE OF PARKS PROPOSED TO BE PLANNED AND RELATIONSHIP TO APPROVED 4.1 SUBMITTALS PRESENT COMPREHENSIVE ASSESSMENT OF OPEN SPACE IN SECTOR PLAN AND EXPANDED CRYSTAL CITY AREA REVIEW PRIORITIES IN SECTOR PLAN COMPARE QUALITY AND QUANTITY OF DETAILS OF SECTOR PLAN AND PROPOSED OPEN SPACE FRAMEWORK PLAN HIGH LEVEL SUMMARY OF EACH PROFFERED PARK EXPLANATION OF PROCESS EXPLANATION OF PROCESS REVIEW REVISED OPEN SPACE FRAMEWORK PLAN SUMMARIZE CHANGES MADE IN RESPONSE TO COMMUNITY FEEDBACK REVIEW REVISED INDIVIDUAL PARKS IN MORE DETAIL PRESENT SYNTHESIZED FEEDBACK FROM SURVEYS REVIEW PROCESS/ TIMING FOR REDESIGN OF OPEN SPACE FRAMEWORK PLAN AND INDIVIDUAL PARKS OPPORTUNITY FOR INTERACTIVE POLLING ACTIVITIES AND MAPPING EXERCISES OPPORTUNITY FOR INTERACTIVE ACTIVITIES SUMMARY OF PROGRAM FOR EACH PROFFERED PARK PRESENT PLANS FOR FOLLOW UP SURVEY WEB PORTAL LAUNCH WITH INFORMATION DIRECT MAIL SAVE THE DATE NOTIFICATION LIST SERVE NOTIFICATIONS

PUBLIC SIGNAGE THROUGHOUT AREA

OPEN SPACE FRAMEWORK PLAN OVERVIEW January 14, 2020 19

slide-10
SLIDE 10

1 14

12TH STREET NOT TO SCALE

2 3 R D S T R E E T CRYSTAL DRIVE EADS STREET

ELM STREET FERN STREET R I C H M O N D H I G H W A Y

2 T H STREET 1 8 T H S T R E E T 15TH STREET

7 2 8 12 13 3 9 4 10 6 5 11 JBG Smith Profgered Parks

Crystal Park Center Park 23rd Street Plaza

6 7 8 JBG Smith Parks

Water Park Friends Plaza The Common

1 2 3 4 5

Metro Market Square Gateway Park

Aspiratjonal Parks / By Others

Pocket Park #8 Garden Park North Gateway Park

11 12 13 9 10

Mets Park Pen Place Greenway Park

14

OPEN SPACE FRAMEWORK PLAN OVERVIEW January 14, 2020 20

OPEN SPACE FRAMEWORK PLAN