1900 CRYSTAL DRIVE LRPC Preparation Meeting SEPTEMBER 19, 2019 - - PowerPoint PPT Presentation

1900 crystal drive
SMART_READER_LITE
LIVE PREVIEW

1900 CRYSTAL DRIVE LRPC Preparation Meeting SEPTEMBER 19, 2019 - - PowerPoint PPT Presentation

1900 CRYSTAL DRIVE LRPC Preparation Meeting SEPTEMBER 19, 2019 Existing Conditions I-395 18 th St National Airport Washington DC 1801 South 1800 South Bell St. Bell St. 1900 Crystal Dr. Crystal City Marriott 1901 South Bell St. 4


slide-1
SLIDE 1

1900 CRYSTAL DRIVE

LRPC Preparation Meeting

SEPTEMBER 19, 2019

slide-2
SLIDE 2

Existing Conditions

slide-3
SLIDE 3

National Airport I-395 18th St

slide-4
SLIDE 4

4

Washington DC

1800 South Bell St. 1901 South Bell St. 1900 Crystal Dr. Crystal City Marriott 1801 South Bell St.

slide-5
SLIDE 5

5

Washington DC

1800 South Bell St. 1901 South Bell St. 1900 Crystal Dr. Crystal City Marriott 1801 South Bell St.

5

slide-6
SLIDE 6

6

Washington DC

1800 South Bell St. 1901 South Bell St. 1900 Crystal Dr. Crystal City Marriott 1801 South Bell St.

6

slide-7
SLIDE 7

Existing Site Topography

7

slide-8
SLIDE 8

Existing Site Topography

8

18TH Street Section – Existing (Looking South)

1801 S Bell (Bloomberg BNA)

G1 Parking G2 Parking

1851 S Bell (Demolished)

G3 Parking “Plaza Level” Elev: 53’ “Crystal Drive Level” Elev: 37’ “Plaza Level” Elev: 53’ Parking Entry Elev: 37’

slide-9
SLIDE 9

Existing Site Topography

9

20TH Street Section – Existing (Looking North)

1901 S Bell

G1 Parking G2 Parking

1851 S Bell (Demolished)

G3 Parking “Plaza Level” Elev: 53’ “Plaza Level” Elev: 53’ “Crystal Drive Level” Elev: 37’ Parking Entry Elev: 37’

slide-10
SLIDE 10

Proposed Block Plan

slide-11
SLIDE 11

Proposed Block Plan

Sector Plan

11

Figure 3.2.2, pg. 33 CCSP

Proposed Block Plan

Site Build-to Lines

slide-12
SLIDE 12

Final Condition

Sector Plan

12

Figure 3.2.2, pg. 33 CCSP

Proposed Final Condition

Site Build-to Lines

slide-13
SLIDE 13

Proposed Retail & Midblock Connection

View from 20th Street – Existing (Looking North)

13

View from 20th Street – Proposed (Looking North)

Park Midblock Connection Retail

Site Build-to Line

Garage Entry Beyond

slide-14
SLIDE 14

Center Park

slide-15
SLIDE 15

Center Park

Current Public Open Space 0 SF

slide-16
SLIDE 16

Center Park

Center Park Phase I

Pedestrian Priority Zone

Sector Plan Target 74,200 SF Center Park Phase I 46,000 SF

slide-17
SLIDE 17

Center Park

Center Park Phase I Center Park Phase II

Sector Plan Target 74,200 SF Center Park Phase I 46,000 SF Center Park Phase II 28,200 SF Subtotal Center Park 74,200 SF

slide-18
SLIDE 18

Center Park

Sector Plan Target 74,200 SF Center Park Phase I 46,000 SF Center Park Phase II 28,200 SF Subtotal Center Park 74,200 SF Pedestrian Priority Zone 15,000 SF TOTAL PUBLIC SPACE 89,200 SF

Center Park Phase I

Pedestrian Priority Zone

Center Park Phase II

slide-19
SLIDE 19

Proposed Sector Plan Deviation: Block Circulation

slide-20
SLIDE 20

Proposed Circulation

Curbless Midblock Connection Curbless Woonerf

Site Build-to Lines

Pedestrian Tabletop

slide-21
SLIDE 21

Proposed Circulation

Site Build-to Lines

slide-22
SLIDE 22

Proposed Circulation

Site Build-to Lines

Special Event Street Closure Zone

slide-23
SLIDE 23

Proposed Sector Plan Deviation: Use Mix

slide-24
SLIDE 24

Block Use Mix

24

JK-1 JK-1 JK-2 JK-3 JK-4 JK-5

Sector Plan Target: 70% Office

slide-25
SLIDE 25

Use Mix

25

Metropolitan Park

  • 1,400 residential units

+ 2M sf office Block J/K + 790 residential units

  • 750k sf office