CUY-IR480-1842, VALLEY VIEW BRIDGE
S EPTEMBER 25, 2018
CUY-IR480-1842, VALLEY VIEW BRIDGE S EPTEMBER 25, 2018 - - PowerPoint PPT Presentation
CUY-IR480-1842, VALLEY VIEW BRIDGE S EPTEMBER 25, 2018 CUY-IR480-1842 MEASUREMENT AND USE OF SET-UP IN PILE DESIGN Christopher Merklin, P.E. Administrator Ohio DOT Office of Geotechnical Engineering *Thank-you to Alex Dettoff - ODOT and
CUY-IR480-1842, VALLEY VIEW BRIDGE
S EPTEMBER 25, 2018
2 |
Christopher Merklin, P.E. Administrator Ohio DOT Office of Geotechnical Engineering *Thank-you to Alex Dettoff - ODOT and Chuck Winters – Jacobs, for many of the slides
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
3 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
4 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
5 |
four lane structures
in the median.
structures
connect to new bridge
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
6 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
7 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
8 |
tep-Tapered Piles
pread Footings on rock
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
9 |
118 piles per each pier, each about 92 feet long.
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
10 |
et-up and Modificat ion
et-up and Modificat ion
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
11 |
make use of pile setup in design
feet long on average.
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
12 |
testing (PDA with signal matching) on first 2 production piles at EOID
testing
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
13 |
end at 11/ 14 Piers
restrikes
piles
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
14 |
day+ restrike
dynamically test 1 production pile
restrike, larger hammer beyond that
tatic load tests with internal strain gages
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
15 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
16 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
17 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
18 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
130 150 165 175 175 180 165
19 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
120 120 125 125 110
20 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
21 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
22 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
23 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
24 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
3200 feet
5 piles, static load test 5 piles, static load test 5 piles, static load test
25 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
26 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
27 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
28 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
974 kips 423 kips
29 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
30 |
Unit Pier Pile no. Inst allat ion S hort t erm rest rikes (kips) S t at ic load t est APPLE Dat e Dept h (ft ) Init ial capacit y (kips) 1-day rest rike 2-day rest rike 3/ 4-day rest rike 5-day rest rike 6/ 7-day rest rike Capacit y (kips) Dat e Age (days) Capacit y (kips) Dat e Age (days) 1 RA RA-TP 25-May 160 290
18-Jul 54 1 P1-A 30-Mar 140 250
18-May 49 P1-B 30-Mar 140 280
28-Mar 175 285
17-May 50 P1-D 26-Mar 140 304
590
2-Apr 175 279
15-May 43 1495 17-May 45 2 P2-1 9-Apr 159 309
18-May 39 3 P3-1 12-Apr 173 325
21-May 39 2 4 P4-A 13-Feb 179 293
5-Apr 51 P4-B 9-Feb 225 401
5-Apr 55 P4-C 12-Feb 179 312
5-Apr 52 P4-D 7-Feb 190 234 350
824
5-Apr 57 P4-1 16-Feb 180 365
30-Mar 42 945 5-Apr 48 5 P5-1 13-Feb 140 502 778
4-Apr 50 6 P6-1 14-Feb 150 381
4-Apr 49 7 P7-1 15-Feb 124 830 1051
13-Mar 26 3 8 P8-1 6-Feb 122 570 811
14-Mar 36 9 P9-A 23-Jan 120 722 940
24-Jan 117 520 847
9-Mar 44 P9-C 25-Jan 112 460
9-Mar 43 P9-D 24-Jan 116 420 840
9-Mar 44 P9-1 25-Jan 120 710
5-Mar 39 2081 9-Mar 43 10 P10-1 26-Jan 110 610
7-Mar 40 11 P11-1 29-Jan 90 657 725 744 745
7-Mar 37
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
31 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
32 |
would be compared to family of curves
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
33 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
34 |
Pick the lowest
35 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
36 |
ettled on 0.6
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
37 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
38 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
39 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
40 |
properties
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
41 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
42 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018
43 |
Mi dw est Geot echni cal Conf er ence • Sept ember 25-27, 2018