FREMONT UNIFIED S C H O O L D I S T R I C T THORNTON MIDDLE SCHOOL CONVERSION SCHEMATIC DESIGN 1 SITE PLAN 2 ENTRY BUILDING 3 ENTRY BUILDING FIRST FLOOR SECOND FLOOR LIBRARY ADMINISTRATION STUDENT SUPPORT SERVICES


slide-1
SLIDE 1

1

FREMONT UNIFIED

S C H O O L D I S T R I C T

THORNTON MIDDLE SCHOOL CONVERSION – SCHEMATIC DESIGN

slide-2
SLIDE 2

2

SITE PLAN

slide-3
SLIDE 3

3

ENTRY BUILDING

slide-4
SLIDE 4

4

ENTRY BUILDING

FIRST FLOOR SECOND FLOOR

ADMINISTRATION

  • WAITING RM, RECEPTION, ATTENDANCE

CLERK, SECRETARIES, NURSE

  • PRINCIPAL, 3 ASST. PRINCIPALS
  • SMALL CONFERENCE RM/STAFF BREAK

RM, TEACHER MAIL RM/STORAGE, REST RM, CUSTODIAL, FIRE RISER STUDENT SUPPORT SERVICES

  • 4 COUNSELING, 1 EACH PSYCHOLOGIST,

SPECIAL ED, SPEECH THERAPY, FLEX

  • LARGE CONFERENCE RM/STAFF BREAK

RM

  • REST RM, ELECTRICAL/IDF, STORAGE

LIBRARY

  • RECEPTION/CHECK-OUT, BACKPACK STORAGE
  • MAIN READING RM, FLEX RM
  • LIBRARIAN WORK RM, REST RM
slide-5
SLIDE 5

5

CLASSROOM BUILDINGS

slide-6
SLIDE 6

6

CLASSROOM BUILDINGS

  • (10) 7TH & 8TH GRADE

SCIENCE LABS

  • (2) FLEX TECH LABS
  • (11) CLASSROOMS
  • (1) SPECIAL ED

CLASSROOM

  • RESTROOMS
  • SUPPORT SPACES
slide-7
SLIDE 7

7

LANDSCAPE SITE PLAN

slide-8
SLIDE 8

8

OPTION #1 (Recommended)

OPTION 1 PROGRAM

  • 1. Field Area:
  • a. 333 m Running Track

1

  • b. Baseball Field

1

  • c. Soccer Field

1

  • 2. Hardcourt:
  • a. Full Basketball Court

11

  • b. Volleyball Court

6

  • c. Handball Court

3

  • d. Ball Wall

3

  • e. Tetherball

8

  • f. Fitness Station

1

  • 3. Parking:
  • a. Staff Parking Spaces

79

PAVING MATERIALS

Skinned Infill Fines Mix Cinder Fines Planting Area 3” Mulch Area A.C. Paving Concrete Paving Sod

slide-9
SLIDE 9

9

OPTION #2

OPTION 2 PROGRAM

  • 1. Field Area:
  • a. ¼ mile Running Track

1

  • b. Baseball Field
  • c. Soccer Field

1

  • 2. Hardcourt:
  • a. Full Basketball Court

10

  • b. Volleyball Court

6

  • c. Handball Court

3

  • d. Ball Wall

3

  • e. Tetherball

8

  • f. Fitness Station

1

  • 3. Parking:
  • a. Staff Parking Spaces

79 SOD CINDER FINES PLANTING AREA 3” MULCH AREA A.C. PAVING

PAVING MATERIALS

slide-10
SLIDE 10

10

OPTION #3

OPTION 3 PROGRAM

  • 1. Field Area:
  • a. ¼ mile Running Track

1

  • b. Baseball Field

1

  • c. Soccer Field

1

  • 2. Hardcourt:
  • a. Full Basketball Court

5

  • b. Volleyball Court

6

  • c. Handball Court

3

  • d. Ball Wall

3

  • e. Tetherball

8

  • f. Fitness Station

1

  • 3. Parking:
  • a. Staff Parking Spaces

90

PAVING MATERIALS

Skinned Infill Fines Mix Cinder Fines Planting Area 3” Mulch Area A.C. Paving Concrete Paving Sod

slide-11
SLIDE 11

11

SUMMARY OF PLAYFIELD OPTIONS

OPTION #2

  • ¼ MILE TRACK
  • NO BASEBALL / LITTLE LEAGUE FIELD
  • 31 HARDCOURTS

OPTION #1 (RECOMMENDED)

  • 333 METER TRACK
  • BASEBALL / LITTLE LEAGUE FIELD
  • 32 HARDCOURTS

OPTION #3

  • OBLONG ¼ MILE TRACK
  • BASEBALL / LITTLE LEAGUE FIELD
  • 26 HARDCOURTS

*EXISTING TRACK IS APPROXIMATELY 333 METERS

slide-12
SLIDE 12

12

REFERENCE SLIDES

slide-13
SLIDE 13

13

ENTRY BUILDING

slide-14
SLIDE 14

14

CLASSROOM BUILDINGS

slide-15
SLIDE 15

15

FENCING & GATES

Building Edge

slide-16
SLIDE 16

16

Architectural

  • Repair roofing, gutters, caps
  • Recoat roof
  • Patch & paint ceilings, walls
  • Replace 25% flooring & base
  • Accessibility compliance –

bathrooms, door hardware, thresholds, casework

  • Everything in +
  • Cap and seal damaged exterior

beams

  • Replace broken windows and

damaged louvers

  • Replace 100% flooring and base
  • Everything in +
  • Replace all classroom ceilings,

windows & louvers system, wall finishes, flooring

  • Upgrade locker rooms
  • New non-bearing walls, interior

finishes, & casework at reconfigured area

Structural

None None, unless necessary to support new HVAC units Seismic upgrade: locker rooms

Mechanical

None Replace outdated HVAC units in kind Replace outdated HVAC w/new efficient units

Electrical

Replace/repair non-functioning and non-compliant fixtures, switches, receptacles, etc.

  • Everything in +
  • Replace fixtures in poor

condition

  • Everything in +
  • New wiring, lighting, controls, life

safety at reconfigured areas

Plumbing

None Replace & relocate fixtures where necessary Replace & relocate fixtures where necessary Very Minor

Minor Modernization Moderate Modernization

Modernization Scope

slide-17
SLIDE 17

17

PHASING

slide-18
SLIDE 18

18

SCHEDULE

slide-19
SLIDE 19

19

LANDSCAPE COURTYARD PLAN

slide-20
SLIDE 20

20

CLASSROOM BUILDING

slide-21
SLIDE 21

21

LIBRARY