FREMONT UNIFIED S C H O O L D I S T R I C T THORNTON MIDDLE SCHOOL - - PowerPoint PPT Presentation
FREMONT UNIFIED S C H O O L D I S T R I C T THORNTON MIDDLE SCHOOL - - PowerPoint PPT Presentation
FREMONT UNIFIED S C H O O L D I S T R I C T THORNTON MIDDLE SCHOOL CONVERSION SCHEMATIC DESIGN 1 SITE PLAN 2 ENTRY BUILDING 3 ENTRY BUILDING FIRST FLOOR SECOND FLOOR LIBRARY ADMINISTRATION STUDENT SUPPORT SERVICES
2
SITE PLAN
3
ENTRY BUILDING
4
ENTRY BUILDING
FIRST FLOOR SECOND FLOOR
ADMINISTRATION
- WAITING RM, RECEPTION, ATTENDANCE
CLERK, SECRETARIES, NURSE
- PRINCIPAL, 3 ASST. PRINCIPALS
- SMALL CONFERENCE RM/STAFF BREAK
RM, TEACHER MAIL RM/STORAGE, REST RM, CUSTODIAL, FIRE RISER STUDENT SUPPORT SERVICES
- 4 COUNSELING, 1 EACH PSYCHOLOGIST,
SPECIAL ED, SPEECH THERAPY, FLEX
- LARGE CONFERENCE RM/STAFF BREAK
RM
- REST RM, ELECTRICAL/IDF, STORAGE
LIBRARY
- RECEPTION/CHECK-OUT, BACKPACK STORAGE
- MAIN READING RM, FLEX RM
- LIBRARIAN WORK RM, REST RM
5
CLASSROOM BUILDINGS
6
CLASSROOM BUILDINGS
- (10) 7TH & 8TH GRADE
SCIENCE LABS
- (2) FLEX TECH LABS
- (11) CLASSROOMS
- (1) SPECIAL ED
CLASSROOM
- RESTROOMS
- SUPPORT SPACES
7
LANDSCAPE SITE PLAN
8
OPTION #1 (Recommended)
OPTION 1 PROGRAM
- 1. Field Area:
- a. 333 m Running Track
1
- b. Baseball Field
1
- c. Soccer Field
1
- 2. Hardcourt:
- a. Full Basketball Court
11
- b. Volleyball Court
6
- c. Handball Court
3
- d. Ball Wall
3
- e. Tetherball
8
- f. Fitness Station
1
- 3. Parking:
- a. Staff Parking Spaces
79
PAVING MATERIALS
Skinned Infill Fines Mix Cinder Fines Planting Area 3” Mulch Area A.C. Paving Concrete Paving Sod
9
OPTION #2
OPTION 2 PROGRAM
- 1. Field Area:
- a. ¼ mile Running Track
1
- b. Baseball Field
- c. Soccer Field
1
- 2. Hardcourt:
- a. Full Basketball Court
10
- b. Volleyball Court
6
- c. Handball Court
3
- d. Ball Wall
3
- e. Tetherball
8
- f. Fitness Station
1
- 3. Parking:
- a. Staff Parking Spaces
79 SOD CINDER FINES PLANTING AREA 3” MULCH AREA A.C. PAVING
PAVING MATERIALS
10
OPTION #3
OPTION 3 PROGRAM
- 1. Field Area:
- a. ¼ mile Running Track
1
- b. Baseball Field
1
- c. Soccer Field
1
- 2. Hardcourt:
- a. Full Basketball Court
5
- b. Volleyball Court
6
- c. Handball Court
3
- d. Ball Wall
3
- e. Tetherball
8
- f. Fitness Station
1
- 3. Parking:
- a. Staff Parking Spaces
90
PAVING MATERIALS
Skinned Infill Fines Mix Cinder Fines Planting Area 3” Mulch Area A.C. Paving Concrete Paving Sod
11
SUMMARY OF PLAYFIELD OPTIONS
OPTION #2
- ¼ MILE TRACK
- NO BASEBALL / LITTLE LEAGUE FIELD
- 31 HARDCOURTS
OPTION #1 (RECOMMENDED)
- 333 METER TRACK
- BASEBALL / LITTLE LEAGUE FIELD
- 32 HARDCOURTS
OPTION #3
- OBLONG ¼ MILE TRACK
- BASEBALL / LITTLE LEAGUE FIELD
- 26 HARDCOURTS
*EXISTING TRACK IS APPROXIMATELY 333 METERS
12
REFERENCE SLIDES
13
ENTRY BUILDING
14
CLASSROOM BUILDINGS
15
FENCING & GATES
Building Edge
16
Architectural
- Repair roofing, gutters, caps
- Recoat roof
- Patch & paint ceilings, walls
- Replace 25% flooring & base
- Accessibility compliance –
bathrooms, door hardware, thresholds, casework
- Everything in +
- Cap and seal damaged exterior
beams
- Replace broken windows and
damaged louvers
- Replace 100% flooring and base
- Everything in +
- Replace all classroom ceilings,
windows & louvers system, wall finishes, flooring
- Upgrade locker rooms
- New non-bearing walls, interior
finishes, & casework at reconfigured area
Structural
None None, unless necessary to support new HVAC units Seismic upgrade: locker rooms
Mechanical
None Replace outdated HVAC units in kind Replace outdated HVAC w/new efficient units
Electrical
Replace/repair non-functioning and non-compliant fixtures, switches, receptacles, etc.
- Everything in +
- Replace fixtures in poor
condition
- Everything in +
- New wiring, lighting, controls, life
safety at reconfigured areas
Plumbing
None Replace & relocate fixtures where necessary Replace & relocate fixtures where necessary Very Minor
Minor Modernization Moderate Modernization
Modernization Scope
17
PHASING
18
SCHEDULE
19
LANDSCAPE COURTYARD PLAN
20
CLASSROOM BUILDING
21