Mobility Advisory Committe e Me e ting De c e mb e r 19, 2017 Re - - PowerPoint PPT Presentation

mobility advisory committe e me e ting
SMART_READER_LITE
LIVE PREVIEW

Mobility Advisory Committe e Me e ting De c e mb e r 19, 2017 Re - - PowerPoint PPT Presentation

Mobility Advisory Committe e Me e ting De c e mb e r 19, 2017 Re g io n 1, F la nde rs Bldg 123 NW F la nde rs Stre e t Po rtla nd. OR 97209 oje c ts Pr I- 84: L indsay Cr e e k Star vation Cr e e k T CP update for 2018


slide-1
SLIDE 1

Mobility Advisory Committe e Me e ting

De c e mb e r 19, 2017 Re g io n 1, F la nde rs Bldg 123 NW F la nde rs Stre e t Po rtla nd. OR 97209

slide-2
SLIDE 2

Pr

  • je c ts

2

I- 84: L indsay Cr e e k – Star vation Cr e e k – T CP update for 2018 K19531 I- 5/ I- 84: Banfie ld Inte r c hange – De sign pr

  • posal,

Ramp Closur e s, De tour s, VC’s K18769 OR99E : Roc kfall Mitigation – De sign pr

  • posal, staging

K19533 I- 405: F r e mont Br idge Modular Joint Re plac e me nt – VC pote ntial r e duc tions K#18841 OR217: OR10 to OR99W SB Aux L ane – VC’s

slide-3
SLIDE 3

Ag e nda − Pro je c t

Ove rvie ws

− ORS 366.215

disc ussio ns fo r VC’ s

3

slide-4
SLIDE 4

4

K#19531 I- 5/ I- 84: Ba nfie ld Inte rc ha ng e

Dra ft T MP a nd De c isio n T re e o n file 4/ 3/ 2017 Curre nt Pha se : F ina l Pla ns PS&E Due : 2/ 12/ 2018 Bid Da te 4/ 12/ 2018 T ype : Bridg e , MP 302.00

slide-5
SLIDE 5
slide-6
SLIDE 6

Sc ope

Pro po se d Wo rk

6

slide-7
SLIDE 7

Mo b ility I mpa c ts

  • Ra mp Clo sure s
  • L

a ne Clo sure s

  • De la y
  • Co ng e stio n o ve r 50+ a ntic ipa te d nig hts
slide-8
SLIDE 8

Ra mp De finitions

8

slide-9
SLIDE 9

L a ne Closur e Re str ic tions (Ra mp C)

9

slide-10
SLIDE 10

L a ne Closur e Re str ic tions (Ra mp C)

10

slide-11
SLIDE 11

L a ne Closur e Re str ic tions (Ra mp A)

11

slide-12
SLIDE 12

L a ne Closur e Re str ic tions (Ra mp A)

12

slide-13
SLIDE 13

L a ne Closur e Re str ic tions (Ra mp A)

13

slide-14
SLIDE 14

L a ne Closur e Re str ic tions (Ra mp B)

14

slide-15
SLIDE 15

L a ne Closur e Re str ic tions (Ra mp B)

15

slide-16
SLIDE 16

L a ne Closur e Re str ic tions (Ra mp B)

16

  • I-84 westbound ramp to I-5 southbound (Ramp B, right lane only)

for bridge deck structural overlay between bent 17 and 24 Bridge No. 08588A and right side bridge rail, Bridge No. 08588B for 5 days total duration beginning Friday July 27, 2018 10:00pm ending Thursday August 2, 2018 5:00am.

  • I-84 westbound ramp to I-5 southbound (Ramp B both lanes) for

bridge deck structural overlay, Bridge No. 08588B for 9 days total duration beginning Friday August 17, 2018 10:00pm ending Monday August 27, 2018 5:00am.

slide-17
SLIDE 17

L a ne Closur e Re str ic tions (Ra mp D)

17

  • I-5 northbound ramp to I-84 eastbound (Ramp D) for bridge deck

seal, Bridge No. 08588D nighttime closure only beginning Tuesday August 28, 2018 ending Friday September 14, 2018, as follows Nightly, Sunday night through Friday morning between 10:00 p.m. and 5:00 a.m. Friday night through Saturday morning between 10:00 p.m. and 8:00 a.m. Saturday night through Sunday morning between 10:00 p.m. and 9:00 a.m

slide-18
SLIDE 18

L a ne Closur e Widths

Ra mp A Clo sure , She e t E B03, Se c tio n A-A, Sta g e I I , Pha se I a nd a ntic ipa te d dura tio n

18

slide-19
SLIDE 19

L a ne Closur e Widths

19

Ramp A Closure, Sheet EB07, Section A-A, Stage II, Phase 2 was covered, including anticipated duration

slide-20
SLIDE 20

L a ne Closur e Widths

Ra mp B Clo sure , She e t E C03, Se c tio n A-A, Sta g e I I I , a ntic ipa te d dura tio n

20

slide-21
SLIDE 21

De tour s

Se e Pla n She e ts E A01 to E D05

21

slide-22
SLIDE 22

Ve r tic a l Cle a r a nc e

Se e VC do c ume nt a nd ha ndo uts

22

slide-23
SLIDE 23

23

K#18769 OR99E : Roc kfa ll Mitig a tion

Dra ft T MP a nd De c isio n T re e o n file : 9/ 14/ 2017 Curre nt Pha se : PS&E PS&E Due : 1/ 12/ 2018 Bid Da te 3/ 15/ 2018 T ype : Ro c kfa ll Mitig a tio n, MP 12.62 – 13.36

slide-24
SLIDE 24
slide-25
SLIDE 25

Sc ope

Pro po se d Wo rk

25

Problem Description Frequent rockfalls and vehicle impacts have resulted in damage to the existing pinned and draped mesh systems along the east side of OR99E in the following sections: MP 12.62 – 12.87 and 13.15 – 13.36. Repair of the mesh is required to reduce the risk of rocks falling from the slopes and impacting the highway. Project Delivery Approach This project will be developed as a design-bid-build project and procured through Commission Services contracting. It is anticipated that all design work will be conducted by Agency staff.

slide-26
SLIDE 26

Mo b ility I mpa c ts

  • Sta g ing
slide-27
SLIDE 27

Sta g ing

Pro po se d Wo rk a t Ca ne ma h Se c tio n

27

slide-28
SLIDE 28

Sta g ing

Pro po se d Wo rk a t T unne l Se c tio n

28

slide-29
SLIDE 29

L a ne Re str ic tions

29

Antic ipa te da ytime o ve r-dime nsio na l ve hic le s b e twe e n the fo llo wing sunrise a nd sunse t pe rio ds:

Ma y: b e twe e n 5:30 a .m. a nd 9:00 p.m.

June : b e twe e n 5:00 a .m. a nd 9:30 p.m.

July: b e twe e n 5:00 a .m. a nd 9:30 p.m.

Aug ust: b e twe e n 5:30 a .m. a nd 9:00 p.m.

Se pte mb e r: b e twe e n 6:00 a .m. a nd 8:00 p.m.

slide-30
SLIDE 30

T he Pro po sa l