ame r ic an rive r basin study
play

Ame r ic an Rive r Basin Study E xe c utive Ste e r ing - PowerPoint PPT Presentation

Ame r ic an Rive r Basin Study E xe c utive Ste e r ing Committe e Me e ting # 3 Oc to b e r 24, 2017, 1-3 pm Me e ting Ag e nda 1. Intr oduc tions 2. Re c ap of to- date de ve lopme nt and the Plan of Study Study o b je c tive


  1. Ame r ic an Rive r Basin Study E xe c utive Ste e r ing Committe e Me e ting # 3 Oc to b e r 24, 2017, 1-3 pm

  2. Me e ting Ag e nda 1. Intr oduc tions 2. Re c ap of to- date de ve lopme nt and the Plan of Study – Study o b je c tive s a nd a ntic ipa te d o utc o me s – Ba sin Study Re q uire me nts – F e de ra l a nd no n-F e de ra l c o st-sha re s & Re po rting Re q uire me nts – T e a m ro le s a nd re spo nsib ilitie s – Sc he dule a nd pro duc t de pe nde nc y 3. Disc ussion – Re la tio nship with o the r pro je c ts a nd pro g ra m – sc e na rio s to b e e va lua te d in the ARBS 4. Ne ar - te r m Ac tivitie s (3- 6 month) 5. Ne xt- Ste ps/ Ac tion Ite ms

  3. Re c a p c h 2016 - Re c la ma tio n re le a se d a so lic ia tio n se e king le tte rs o f Mar inte re st fo r pro spe c tive Ba sin Study c a ndida te s June 2016 - Pro po sa l fo r a n Ame ric a n Rive r Ba sin Study (ARBS) sub mitte d b y six no n-F e de ra l Pa rtne rs Pla c e r Co unty Wa te r Ag e nc y – City o f Ro se ville – City o f Sa c ra me nto – E l Do ra do Co unty Wa te r Ag e nc y – City o f F o lso m – Re g io na l Wa te r Autho rity – 2016 - Awa rd o f $650K b y Re c la ma tio n fo r the ARBS; Se pte mbe r $1.8M pro po se d b y no n-F e de ra l Pa rtne rs a s in-kind ma tc hing c o ntrib utio ns. June 28, 2017 –MOA fo r the ARBS fully sig ne d b y Re c la ma tio n a nd six no n-F e de ra l Pa rtne rs 28, 2020 – MOA e xpire s De c e mbe r

  4. Wa te rSMARTBa sin Studie s F oc us E va lua te the impa c ts o f c limate c hange a nd he lp • e nsure susta ina b le wa te r supplie s b y ide ntifying stra te g ie s to a ddre ss imbalanc e s in wa te r supply a nd de ma nd. Ba sins a nd sub b a sins in the 17 we ste rn sta te s. • Utility T he re sulting r e c omme ndations DO NOT • c o nstitute F e de ra l de c isio ns o r a utho riza tio n; ho we ve r, furthe r fe a sib ility studie s fo r suc h purpo se s a re po ssib le unde r the a utho rizing le g isla tio n.

  5. Re q uire d Ba sin Study E le me nts • De ve lo p pro je c tio ns o f future wa te r supply a nd de ma nd in the b a sin, inc luding a n a sse ssme nt o f risk to the wa te r supply re la ting to po te ntia l c ha ng e s in c lima te . • Ana lyze ho w e xisting wa te r a nd po we r infra struc ture a nd o pe ra tio ns will pe rfo rm in the fa c e o f c ha ng ing wa te r re a litie s (inc luding e c o syste m, re c re a tio n, a nd wa te r q ua lity). • De ve lo p a da pta tio n a nd mitig a tio n stra te g ie s spe c ific to the Ame ric a n Rive r Ba sin within the b ro a d c o nte xt o f the SSJRBS to a ddre ss ide ntifie d imb a la nc e s b e twe e n c urre nt a nd future supplie s a nd de ma nds. • Co mple te a tra de -o ff a na lysis o f the ide ntifie d o ptio ns, inc luding a n a na lysis o f a ll o ptio ns in te rms o f the ir re la tive c o st, e nviro nme nta l impa c t, risk, sta ke ho lde r re spo nse , o r o the r c o mmo n a ttrib ute s.

  6. Use a po we rful sta te me nt o r sta tistic to suppo rt yo ur pre se nta tio n.

  7. Study Ob je c tive s • F urthe r re fine the a sse ssme nt o f wa te r supplie s a nd de ma nds fo r the Ame ric a n Rive r Ba sin • Addre ss re g io na l de mand-supply imbalanc e a nd infra struc ture de fic ie nc ie s unde r the e xisting a nd futur e c limate c hange c onditions . • I mpro ve re g io na l c o lla b o ra tio n fo r susta ina b le wa te r re so urc e s ma na g e me nt. • I mpro ve c oor dination of loc al and F e de r al wate r manage me nt to impro ve re g io na l wa te r supply re lia b ility a nd de ve lo p stra te g ie s to inc re a se Re c la ma tio n’ s o pe ra tio na l fle xib ility o f F o lso m Re se rvo ir to me e t a ll purpo se s o f the CVP. • Alig n wa te r ma na g e me nt to o ls, stra te g ie s, a nd pla nning e ffo rts o f Re c la ma tio n a nd wa te r a g e nc ie s in the b a sin.

  8. Antic ipa te d Outc o me s • Unifie d mo de ling da ta , a nd a ssumptio ns fo r F e de ra l a nd Re g io na l pla nning in the Ame ric a n Rive r Ba sin (c lima te c ha ng e hydro lo g y, uppe r wa te rshe d o pe ra tio ns, a nd te mpe ra ture ). • Asse ssme nt o f imb a la nc e a t b uild-o ut unde r c lima te c ha ng e c o nditio ns • Asse ssme nt o f ho w a ra ng e o f se le c te d a da pta tio ns c a n re duc e the se imb a la nc e s

  9. F e de ra l a nd No n-F e de ra l Co st-Sha re Re c lamation $650k fo r pre pa ra tio n o f the ARBS • $60k re -pro g ra mme d fro m 2016 Re c la ma tio n Ame ric a n Rive r • T e c hnic a l Se rvic e s Wo rk to pre pa re c lima te hydro lo g y ne e de d fo r ARBS Re q ue sting a dditio na l funds fro m Re c la ma tio n’ s Ba sin Study Pro g ra m • to fund re ma ining T SC wo rk Non- F e de r al Par tne r s Costs I n-kind $1.7 millio n (inc lude s c o st-sha re pro duc ts, no n-F e de ra l Pa rtne rs • sta ff time , a nd a dditio na l dire c t e xpe nditure ) Additio na l dire c t e xpe nditure c o sts: • $30k POS (Q1 2017) (PCWA, SAC, F o lso m, Ro se ville , E DCWA) – $30k Re vise d De ma nds unde r Clima te Cha ng e (Q1 2018) (PCWA, – SAC, Ro se ville ) $200k a dditio na l a da ptio n Stra te g ie s to b e a na lyze d (e .g . Rive rARC, – Alde r Cre e k). (Q4 2018) (PCWA, SAC, F o lso m, Ro se ville , E DCWA)

  10. ARBS Co st = $2,665,000 Str a te gy: Minimum 50% non- fe de r a l c ost sha r e r e quir e d. A hig he r pe r c e ntag e indic a te s g r e a te r c ommitme nt. F e de r al, $650,000, 24% PCWA, $704,000, Add. Inve stme nt, 27% $64,000, 9% F olsom, $64,000, 2% Existing/ Planne d Effor ts, $640,000, 91% Rose ville , $64,000, 2% Sac r ame nto, Add. Inve stme nt, $64,000, 2% $64,000, 8% Existing/ Planne d Effor ts, $720,000, 92% E DCWA, $784,000, RWA, $335,000, 30% 13% Add. Inve stme nt, $36,000, 11% Existing/ Planne d Effor ts, $299,000, 89%

  11. Ma na g e me nt Struc ture

  12. T e a m Ro le s a nd Re spo nsib ilitie s • Re c la ma tio n – Mid-Pa c ific Re g io n – T SC – Co ntra c to r • No n-F e de ra l Pa rtne rs • Sta ke ho lde rs

  13. Sc he dule a nd Pro duc t De pe nde nc y

  14. Othe r Re late d Re gional E ffor ts Ame r ic an Rive r Basin Study E xe c utive Ste e r ing Committe e Me e ting Oc to b e r 24, 2017

  15. T he Sc o pe o f Wha t We Do I nte g ra te d Wa te r Ma na g e me nt with Ma ny Po ssib le Cro sslinks a nd Be ne fits F lo o d Surfa c e Wa te r Ma na g e me nt Ma na g e me nt Gro und wa te r Wa te r Re use Ma na g e me nt Sto rmwa te r Ma na g e me nt Co nse rva tio n

  16. Outc ome - ba se d Re g iona l Approa c h Pro vide s va lue s in o rc he stra ting distrib ute d b ut inte g ra te d e ffo rts to a ddre ss diffe re nt stra te g ic inte nts a nd a ntic ipa te d o utc o me s witho ut o ve rly b urde ning o r e nc ro a c hing a uto no my o f individua l e ntitie s

  17. Outc o me s a nd F o c us Str a te g y Aspira tion a nd Colle c tive Ne g otia tion •Re g io na l Visio ns/ Sc e na rio s •Re g io na l Ma ste r/ T a c tic a l Pla ns Ac tions Subre g iona l a nd Proje c t Imple me nta tion •Pla nning / F e a sib ility/ Appro va l •Busine ss Ca se / Go ve rna nc e Pla tfor m Common Ba sic s •Da ta / T o o ls •Rule s/ Pro c e dure s Age nc ie s prima ry F OCUS se c o nda ry

  18. E xa mple K e y Ac tivitie s 2016 2017 2018 2019 2020 2021 Re gional Dr ought Continge nc y Plan (RDCP) 2016 2017 2018 2019 2020 2021 Re gional Wate r Re liability Plan (RWRP) 2016 2017 2018 2019 2020 2021 Ame r ic an Rive r Basin Study (ARBS) Wate r Mar ke ting Str ate gy Pr oje c t (WMSP) 2016 2017 2018 2019 2020 2021 PCWA’s Rive r Ar c 2016 2017 2018 2019 2020 2021 Stor mwate r Re sour c e Plans (SWRP) 2016 2017 2018 2019 2020 2021 ARB IRWMP Update 2016 2017 2018 2019 2020 2021 E DCWA’s Supple me ntal Wate r Right Pr oje c t 2016 2017 2018 2019 2020 2021 Gr oundwate r Sustainability Plans (GSP) 2016 2017 2018 2019 2020 2021

  19. Ne a r-te rm Ho w the y F it Sho rt-te rm a nd Built-o ut Ne a r a nd L o ng -te rm F uture Clima te Cha ng e Str a te g y Aspira tion a nd Colle c tive Ne g otia tion •Re g io na l Visio ns/ Sc e na rio s (e .g ., RDCP, RWRP, ARBS) •Re g io na l Ma ste r/ T a c tic a l Pla ns (e .g ., SWRP, I RWMP) Ac tions Subre g iona l a nd Proje c t Imple me nta tion •Pla nning / F e a sib ility/ Appro va l •Busine ss Ca se / Go ve rna nc e Pla tfor m Common Basic s •Da ta / T o o ls (e .g ., ARBS) •Rule s/ Pro c e dure s

  20. Ho w the y F it Re c la ma tio n e ng a g e me nt Str a te g y Aspira tion a nd Colle c tive Ne g otia tion •Re g io na l Visio ns/ Sc e na rio s (e .g ., RDCP, RWRP, ARBS) •Re g io na l Ma ste r/ T a c tic a l Pla ns (e .g ., SWRP, I RWMP) Ac tions Subre g iona l a nd Proje c t Imple me nta tion •Pla nning / F e a sib ility/ Appro va l •Busine ss Ca se / Go ve rna nc e Pla tfor m Common Basic s •Da ta / T o o ls (e .g ., ARBS) •Rule s/ Pro c e dure s Syste m o pe ra tio n mo de ls (SW with GW; upstre a m a nd CVP/ SWP syste m) CC da ta a nd upstre a m o pe ra tio ns F o lso m L a ke a nd L o we r Ame ric a n Rive r T e mpe ra ture Mo de ls

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend