Santiago Solar: Case Study of a Metropolitan Solar Plant Columbia University, September 2019 Confidential 2 Introducing AME AME is an infrastructure developer with a strong track record. Focus on Gas and LNG infrastructure, combined cycle


slide-1
SLIDE 1

Santiago Solar: Case Study of a Metropolitan Solar Plant Columbia University, September 2019

slide-2
SLIDE 2

2 Confidential

Introducing AME

Solar PV Wind Gas and LNG e-nnovation

AME is an infrastructure developer with a strong track record. Focus on Gas and LNG infrastructure, combined cycle power plants, solar PV and CSP and wind generation technologies, and other innovative technologies in the energy infrastructure space including public transport mobility and energy services Co-owner with EDF of the 5th largest generator in

  • Chile. 1,200 MW in CCGTS and solar PV currently
  • perating in Chile and Peru, together with a

significant development pipeline

  • f

projects including CCGT and renewable technologies AME plans to balance its portfolio with 600 MW

  • f additional renewable capacity by 2023
slide-3
SLIDE 3

AME

Santiago Solar: Case Study of a Metropolitan Solar Plant

slide-4
SLIDE 4

4 Confidential AME

Santiago de Chile Population 6 million Energy consumption 20,000 GWh/y

slide-5
SLIDE 5

5 Confidential AME

Trade off – radiation vs transmission cost / risk

Santiago has extremely high radiation by world standards, even if it is 20% lower than northern Chile

slide-6
SLIDE 6

6 Confidential

20 40 60 80 100 120 1,00 2,00 3,00 4,00 5,00 6,00 7,00 8,00 9,00 10,00 11,00 12,00 1,00 2,00 3,00 4,00 5,00 6,00 7,00 8,00 9,00 10,00 11,00 12,00 1,00 2,00 3,00 4,00 5,00 6,00 7,00 8,00 2.017 2.018 2.019

CMg [USD/MWh] AÑO - MES

CMG por Bloque (Solo Solar)

Crucero - Solar Diego de Almagro - Solar Quillota - Solar

Trade off – radiation vs transmission cost / risk

Day time prices by injection node

slide-7
SLIDE 7

7 Confidential

Santiago Solar: A metropolitan solar project

45 km (27 miles) north of Santiago

slide-8
SLIDE 8

8 Confidential AME

Timeline

slide-9
SLIDE 9

9 Confidential AME

Santiago Solar site (pre-build)

slide-10
SLIDE 10

10 Confidential AME

Timeline

slide-11
SLIDE 11

11 Confidential AME

Til- til is an area of Santiago which has experienced significant levels of conflict between citizens and businesses in recent years

slide-12
SLIDE 12

12 Confidential

Meaningful and genuine dialogue with the community

  • Respectful and genuine

consultation

  • Real changes made to

project design to adjust to community concerns

  • Contributions designed

to be relevant to the project and address real needs

slide-13
SLIDE 13

13 Confidential AME

Timeline

slide-14
SLIDE 14

14 Confidential AME

In the 2014 tender process, Santiago Solar presented the lowest adjudicated offer, winning with a price of US$79.88/ MWh.

slide-15
SLIDE 15

15 Confidential AME

Timeline

slide-16
SLIDE 16

16 Confidential AME

Santiago Solar site (pre-build)

slide-17
SLIDE 17

17 Confidential AME

Santiago Solar site (pre-build)

slide-18
SLIDE 18

18 Confidential AME

Santiago Solar site (pre-build)

slide-19
SLIDE 19

19 Confidential AME

125 ha

agricultural land improved

145 ha

reforested with native species

(360 acres) (310 acres)

slide-20
SLIDE 20

20 Confidential AME

Timeline

slide-21
SLIDE 21

21 Confidential AME 0,0% 20,0% 40,0% 60,0% 80,0% 100,0% 120,0% 140,0% 160,0% 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 WITHDRAWAL % Real/Projected Withdrawal Objective Withdrawal Rate

Regulated client withdrawals real / projected 2010 - 2025

slide-22
SLIDE 22

22 Confidential AME

  • 50,0

100,0 150,0 200,0 250,0 300,0 ene-10 abr-10 jul-10

  • ct-10

ene-11 abr-11 jul-11

  • ct-11

ene-12 abr-12 jul-12

  • ct-12

ene-13 abr-13 jul-13

  • ct-13

ene-14 abr-14 jul-14

  • ct-14

ene-15 abr-15 jul-15

  • ct-15

ene-16 abr-16 jul-16

  • ct-16

ene-17 abr-17 jul-17

  • ct-17

ene-18 abr-18 jul-18

  • ct-18

ene-19 abr-19 jul-19 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 CMg Quillota 220 CMg Crucero CMg Diego de Almagro

Marginal Prices in the SIC / SEN 2010 – 2019

slide-23
SLIDE 23

23 Confidential AME

  • 50,0

100,0 150,0 200,0 250,0 300,0 ene-10 abr-10 jul-10

  • ct-10

ene-11 abr-11 jul-11

  • ct-11

ene-12 abr-12 jul-12

  • ct-12

ene-13 abr-13 jul-13

  • ct-13

ene-14 abr-14 jul-14

  • ct-14

ene-15 abr-15 jul-15

  • ct-15

ene-16 abr-16 jul-16

  • ct-16

ene-17 abr-17 jul-17

  • ct-17

ene-18 abr-18 jul-18

  • ct-18

ene-19 abr-19 jul-19 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 CMg Quillota 220 CMg Crucero CMg Diego de Almagro

Marginal Prices in the SIC / SEN 2010 – 2019

slide-24
SLIDE 24

24 Confidential AME

Timeline

slide-25
SLIDE 25

25 Confidential AME

Timeline

slide-26
SLIDE 26

26 Confidential AME

Timeline

slide-27
SLIDE 27

27 Confidential AME

slide-28
SLIDE 28

28 Confidential AME

*

100

* Based on average home consumption

  • f 1.785 kWh /y

(Obrecht, 2016)

FACTS & FIGURES

slide-29
SLIDE 29

29 Confidential

Award winning approach

Winner of the Association of Generators’ “Good Practices Contest for a more Sustainable Electric Future, 2018 Women of theYear Award, 2017, Ministry of Energy Outstanding results in the Project Acceptance Index for large scale renewable energy projects, Ministry of Energy and Gernman GIZ Winner of Latin American Green Awards 2019 “Oasification; Forest Solutions for Desertification”

slide-30
SLIDE 30

30 Confidential

A few words about the greenhouse…

slide-31
SLIDE 31

31 Confidential