Joint meeting of the Joint meeting of the Public Works Committe e e (PW- Engineering & Engineering & Public Works Committe (PW-3-2015) 3-2015) and and Corporate & Emergenc Corporate & Emergency Services Committee y Services


  1. Joint meeting of the Joint meeting of the Public Works Committe e e (PW- Engineering & Engineering & Public Works Committe (PW-3-2015) 3-2015) and and Corporate & Emergenc Corporate & Emergency Services Committee y Services Committee (CE (CES-3-2015) -3-2015) February 18, 2015

  2. User Fees and Urban Service 1.4% Area Charges increase for 2015 $10 M Capital Budget for 2015 $137 M 10-Year Capital Forecast Contributions to Reserves in 2015 $4.8 M 10-Year Contribution to Reserves $57.6M 10-Year Infrastructure Deficit ($43.3M) 2

  3. Increase in Forecast Reserves after +$23 M 10 years External Debt Repayment in 2015 $7.8 M External Debt Reduction Forecasted -$43 M over 10 years (principal) Internal Debt Repayment in 2015 $0.5 M Internal Debt Forecasted over 10 +$28 M years (principal) 3

  4. 2015 Net Category Levy Net Levy Account Category Yr-over-Yr Increase/ Impact Change % (Decrease) Total Expenditures $249,001 1.0% 2.3% Total Revenue Sources (88,186) 0.6% (0.8%) Net Levy Impact 160,815 1.5% Assessment Growth (84,012) (0.8%) Net Levy Impact After Growth $76,803 0.7% Net Levy below guideline of 3.5% 1% levy = $105.0 k 5

  5. Monthly Impact on Typical Residential Household (20 cubic metres per month & house assessed at $200,000) Year-over-Year Water Services 2014 2015 Increase (Decrease) User Fee $ 52.89 $ 54.10 2.3% $ 1.21 Urban Service Area Charge $ 13.92 $ 14.13 1.5% $ 0.21 Total $ 66.81 $ 68.23 2.1% $ 1.42 Year-over-Year Wastewater Services 2014 2015 Increase (Decrease) User Fee $ 53.47 $ 54.04 1.1% $ 0.57 Urban Service Area Charge $ 33.70 $ 33.83 0.4% $ 0.13 Total $ 87.17 $ 87.87 0.8% $ 0.70 Year-over-Year Increase Combined Water & Wastewater Services 2014 2015 (Decrease) User Fee $ 106.36 $ 108.14 1.7% $ 1.78 Urban Service Area Charge $ 47.62 $ 47.96 0.7% $ 0.34 Total $ 153.98 $ 156.10 1.4% $ 2.12 Reference: CES-3-2015-1 - Water & Wastewater Treasurer’s Report, page 17 6

  6. Historical Review of Rates & Taxes In 2014 and proposed for 2015, the increase in monthly charges is less than the construction index which has averaged 2.1% in 2013 and 1.9% in 2014. 7

  7. 2014 2014 2013 2014 2013 Residential Water/ Est. Avg. Water/ Est. Avg. Water/ Wastewater Household Wastewater Household Wastewater as a % of Income Burden Income Costs Household Ranking Ranking 200 m3 Income Gravenhurst Low $71,130 $1,110 1.6% High Huntsville Mid $85,984 $1,110 1.3% High Bracebridge Mid $85,045 $1,110 1.3% High Average $93,038 $858 1.0% Median $86,773 $821 1.0% Minimum $55,056 $354 0.3% Maximum $174,855 $1,520 1.8% BMA Municipal Study 2014, pages 369-371 8

  8. Consumption Levels Water Billed Consumption by Year ◦ Decline in consumption levels since 4,000,000 2005. 3,500,000 ◦ Conservation efforts is one factor. 3,000,000 2,500,000 Cubic Metres ◦ Weather also has an impact. 2,000,000 1,500,000 ◦ 2015 consumption target is 2.75 1,000,000 500,000 million cubic metres (down 3.2%). 0 ◦ Consistent with 2013 levels. Year ◦ Just less than the four-year average. ◦ 84% of the combined rate increase due to consumption drop. Reference: CES-3-2015-1 - Water & Wastewater Treasurer’s Report, page 2 9

  9.  Operating expenses, net of support services, are 0.6% above 2014  Personnel increases = 1% or $49k  Purchased Services increases = 4.8% or $80k  Finance Charges/Reserves increases = 1.3% or $168k  Net Support Services decreases = 4.7% or $84k 10

  10. 11

  11. Reference: CES-3-2015-1 - Water & Wastewater Treasurer’s Report, page 10 12

  12. Budget Drivers – Water  Personnel increase = $160,011 ◦ Wage settlement = 2% ◦ Shifting labour to water services from wastewater ◦ Reclassification and new student = $16k ◦ Reallocation of Engineering administration, design and facilities services = ($44k)  Purchased Services decrease = $58,735 ◦ Subcontractor costs fluctuate year to year based on preventative maintenance scheduled Reference: CES-3-2015-1 - Water & Wastewater Treasurer’s Report, page 9 13

  13. Budget Drivers – Water  Finance Charges and Reserves increase = $74,428 ◦ Debt repayments decreasing by $77k ◦ Reserve contribution increased by $123k to offset drop in debt repayments plus construction index  Net Service Charges decrease = $24,120 ◦ Realignment of Engineering administration costs is main factor  Revenue increase = $69,477 ◦ User fees increasing $70.7k Reference: CES-3-2015-1 - Water & Wastewater Treasurer’s Report, page 9 14

  14. 15

  15. Reference: CES-3-2015-1 - Water & Wastewater Treasurer’s Report, page 15 16

  16. Budget Drivers – Wastewater  Personnel decrease = $111,306 ◦ Wage settlement = 2%; overtime increase for Port Carling WWTP ◦ Shifting labour from wastewater services to water = ($116k) ◦ Reclassification and new student = $16k ◦ Reallocation of Engineering administration, design and facilities services = ($61k)  Purchased Services increase = $138,470 ◦ Subcontractor costs fluctuate year to year based on preventative maintenance scheduled = $53k ◦ Biosolids removal costs (haulage) increasing to reflect actuals = $43k Reference: CES-3-2015-1 - Water & Wastewater Treasurer’s Report, page 14 17

  17. Budget Drivers – Wastewater  Finance Charges and Reserves increase = $93,088 ◦ Debt repayments increasing by $193k ◦ Tax write-offs increasing to reflect actuals $56k ◦ Reserve contribution decreased by $157k to offset drop in debt repayments less construction index  Net Service Charges decrease = $60,000 ◦ Recovery for supernatant treatment from Hauled Sewage ◦ Realignment of Engineering administration costs is main factor Reference: CES-3-2015-1 - Water & Wastewater Treasurer’s Report, page 14 18

  18. 19

  19. 2015 Capital Financing - Water • Total 10-year Draft Capital Budget & Forecast is projecting $31.1 million in gross expenditures (2014 - $34.6) • The largest source of funding continues to be from the internal reserve funds at $17.3 million (2014 - $23.6) • Sustainable Infrastructure at $9 million Reference: CES-3-2015-1 - Water & Wastewater • Development Charges Revenue: Treasurer’s Report, page 18 • $2.1 million in 2015 • $8.2 million in 2014 • There are no shortfalls in development charges revenue assumed in the 10- year forecast that require financing through internal debt over the next 10 years. 20

  20. Water: 2013 TCA Historical Costs Land & Site Improvements $5.9 Distribution $112.9 Treatment $63.9 Machinery & Equipment $32.2 Total Cost $214.9 21

  21. Major Water Projects 2016 – 2019 Project Program Budget Bracebridge 431020 BB James from MacDonald to Ann Replacement - Upgrade 540,000 Huntsville 432012 HV WTP Phase III Plant 3,000,000 MacTier 432015 MT WTP Modifications Plant 1,900,000 Bala 434009 BALA Repair/Paint Tower 2015 Reservoir 800,000 Port Carling 434010 PC Repair/Paint Tower Reservoir 800,000 Port Severn 432022 PS WTP Rehabilitation Plant 1,000,000 Subtotal Expenditures $8,040,000 Remaining Expenditures 6,020,000 Total Capital Project Expenditures $14,060,000 Reference: CES-3-2015-1 - Water & Wastewater Treasurer’s Report, page 20 22

  22. Major Water Projects 2020 – 2024 Project Program Budget Bracebridge 431024 BB Spencer from Andrea to Santa's Village Rd Replacement - Upgrade 600,000 432039 BB WTP Rehabilitation Plant 2,000,000 434016 BB Ecclestone Dr Reservoir & Pumping Station Reservoir 500,000 Gravenhurst Plant 432031 GH Filter Underdrains & Scour System 1,500,000 434005 GH Repair/Paint Fairview Tower Reservoir 800,000 Reservoir 434006 GH Repair/Paint Beach Road Tower 800,000 Subtotal Expenditures $6,200,000 Remaining Expenditures 8,344,000 Total Capital Project Expenditures $14,544,000 Reference: CES-3-2015-1 - Water & Wastewater Treasurer’s Report, page 21 23

  23. 2015 Capital Financing - Wastewater • Total 10-year Draft Capital Budget & Forecast is projecting $105.7 million in gross expenditures (2014 - $78.9) • The significant increase is due to the Mountview and Golden Pheasant plants in Huntsville • Infrastructure Funding Deficit is $43 million which is grant funding necessary to proceed with Huntsville project • Internal reserve funds are financing $26.3 Reference: CES-3-2015-1 - Water & Wastewater million from Wastewater capital and Treasurer’s Report, page 23 Environmental reserves • Borrowing from Debt Reduction is $19.3 million to finance Huntsville project • Sustainable infrastructure is $10.1 million • Development Charges Revenue reduced to $5.6 million ($29.8 million in 2014) 24

  24. Wastewater: 2013 TCA Historical Costs Land & Site Improvements $8.9 Collection $124.8 Treatment $81.7 Machinery & Equipment $52.5 Total Cost $267.9 25

  25. Major Wastewater Projects 2015 Project Program Budget Bracebridge 413018 BB Beaumont Dr SPS Pumping Station $1,400,000 413101 BB Dill St SPS Upgrades Pumping Station 1,200,000 411086 BB Taylor from Toronto to Front Replacements/Upgrade 500,000 412020 BB Lagoon Lane STP Headworks Plant 500,000 Subtotal Expenditures $3,600,000 Remaining Expenditures 4,015,000 Total Capital Project Expenditures $7,615,000 Reference: CES-3-2015-1 - Water & Wastewater Treasurer’s Report, page 24 26

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.