FREMONT UNIFIED January 22, 2020 S C H O O L D I S T R I C T - PowerPoint PPT Presentation

FREMONT UNIFIED January 22, 2020 S C H O O L D I S T R I C T Centerville Middle School Conversion Drama Program Performance Space Site Plan Approved by the Board on June 26, 2019 2 Drama Classroom - Existing Drama Classroom: 1580sf;


  1. FREMONT UNIFIED January 22, 2020 S C H O O L D I S T R I C T Centerville Middle School Conversion Drama Program Performance Space

  2. Site Plan Approved by the Board on June 26, 2019 2

  3. Drama Classroom - Existing Drama Classroom: • 1580sf; 450sf performance area • Storage shared with backstage area • Existing raised stage and seating configuration not in DSA approved plans • Light and sound table within seating area • Curtain separates stage and seating area 3

  4. Option 1 – Original Schematic Design Presented to the Board 11/20/19 Highlights: • Acoustic improvements to MPR for larger performances • Locker rooms expanded in Bldg G • Art room in Bldg D • Drama room moves to Bldg D 4

  5. Option 1 - Drama Classroom and Lockers Presented to the Board 11/20/19 Drama Classroom: • 1200sf; 430sf performance area; and 45-55 seat capacity • 165sf of usable storage • No backstage area • No curtain Locker Room Expansion: • (2) Locker Rooms at 1968 sf ea: • 772 Day Use Lockers ea • 255 PE Use Lockers ea • (2) Offices at 248 sf ea • (2) Storage at 255 sf ea • (2) Multi Occupant Restrooms and (2) Single Occupant/Gender Neutral Restrooms MPR: • Acoustic improvements and portable lighting for larger drama performances Design for drama meets approved Middle School Educational Specifications Scope of work is within current project budget 5

  6. Option 2 – Site Plan Highlights: • Hardcourt space extended • Square footage added to Bldg G • Drama remains in Bldg G • Locker rooms expanded in Bldg G • No improvements to MPR 6

  7. Option 2 – Building Floor Plans Drama Classroom: • 1580sf; 450 sf performance area; 50-60 seating capacity • 418 sf for backstage and storage • Curtain location in approximately same location as existing Locker Room Expansion: • (2) Locker Rooms at 1,702 sf ea: • 772 Day Use Lockers ea • 255 PE Use Lockers ea • (2) Offices at 320 sf ea • (2) Storage at 265 sf ea • (2) Multi Occupant Restrooms and (2) Single Occupant/Gender Neutral Restrooms MPR: • No improvements Hardcourts: • Expansion to account for addition to Bldg G Additional Cost: $3M Items to note: • Drama remains in current space • Smaller square footage for lockers than in SD option, no impact to locker count 7 Creates additional flex lab in Bldg D •

  8. Option 3 – Site Plan Highlights: • Locker rooms expanded in Bldg G • Drama moves to Bldg D with larger sf • Art moves from Bldg D to new modular • No improvements to MPR 8

  9. Option 3 – Building Floor Plans Drama Classroom: • In Bldg D, D2 and D3 combined to create larger space • 2,360 sf; 653 sf performance area; 85-95 seating capacity • Curtain locations to be developed • 240 sf for side stage • 318 sf for storage Locker Room Expansion: • (2) Locker Rooms at 1,964 sf ea • 772 Day Use Lockers ea • 255 PE Use Lockers ea • (2) Offices at 250 sf ea • (2) Storage at 255 sf ea • (2) Multi Occupant Restrooms and (2) Single Occupant/Gender Neutral Restrooms Art Room: • Moves to new modular • 1,440 sf MPR: • No improvements Additional Cost: $3.9M Items to note: • Drama room will have low ceiling and suboptimal sight lines 9 • Drama program does not have history in this type of space

  10. 10 Option 3 – Side View

  11. Next Steps • Complete Design Development phase • Develop phasing plan with Contractor, Construction Manager, and Site • Continue coordination of schedule, phasing, cost and constructability 11

  12. 12 Reference Slides

  13. Centerville MS Campus Original Design Direction/Goals for Conversion Project: • Student centric spaces for 6-8 • 2 story Development • Update Centerville presence in community • Minimize Portables • Safe Student Drop-off • Outdoor learning spaces Community/Board Input at 10/24/18 Meeting: • Expansion of Playfields • Space for Emergency Supplies • 2 story Development • Classrooms in New Construction • Minimize New Portables • Safe Student Drop-off Updated Input from the District since then: • Old Enrollment Projections: 1822 • Updated Enrollment Projections: 1545* *Based on Jan 2019 Report to 2024/2025 • Incorporation of Ed Specs 13

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.