STRATFORD MIDDLE SCHOOL RENOVATION AND ADDITION ARLINGTON PUBLIC SCHOOLS SCHOOL BOARD INFORMATION MEETING 17 MARCH 2016 PROCESS STAKEHOLDER COLLABORATION 22 BLPC meetings 12 PFRC meetings 5 HALRB/DRC meetings/ work sessions


  1. STRATFORD MIDDLE SCHOOL RENOVATION AND ADDITION ARLINGTON PUBLIC SCHOOLS SCHOOL BOARD INFORMATION MEETING 17 MARCH 2016

  2. PROCESS

  3. STAKEHOLDER COLLABORATION • 22 BLPC meetings • 12 PFRC meetings • 5 HALRB/DRC meetings/ work sessions • 2 Gallery Walks / Open House • Additional meetings with community leaders, Department of Parks and Recreation, VDOT, Arlington County, and School Board Members. Arlington Public Schools QUINN EVANS ARCHITECTS Stratford Middle School - 3

  4. APPROVED CONCEPT - 11/5/15 WEST ADDITION WITH DRIVEWAY CONNECTION Arlington Public Schools QUINN EVANS ARCHITECTS Stratford Middle School - 4

  5. APPROVED CONCEPT SITE PLAN - 11/5/15 N. VACATION LANE LEGEND • 35,000 sf minimum Property Line Parent Drop-off Possible Outdoor west addition LORCOM LANE Bus Drop-off Learning Amenity Phase 1 New Building Entry • Exit only driveway connection onto Old Dominion N T E E R Drive from T S D R STRATFORD / 3 2 HB WOODLAWN Vacation Lane N. VACATION LANE • Expanded surface parking ofg Vacation Lane to BALL FIELD PLAYING FIELD TENNIS COURTS D replace 50 spaces A O R Y R BASKETBALL A T lost I L C COURTS I M • 144 parking spaces O L D D O M I N I O N / 22ND STREET N R O U T E 2 9 N Arlington Public Schools QUINN EVANS ARCHITECTS Stratford Middle School - 5

  6. APPROVED ALTERNATIVE SITE PLAN - 11/5/15 N. VACATION LANE LEGEND • No driveway Property Line Parent Drop-off Possible Outdoor connection between LORCOM LANE Bus Drop-off Learning Amenity Phase 1 Vacation Lane and New Building Entry Old Dominion Drive N T E E R • Provided in the T S D R STRATFORD / 3 2 HB WOODLAWN event that VDOT N. VACATION LANE and/or Arlington County does not approve a vehicular PLAYING FIELD BALL FIELD TENNIS COURTS exit at Old D A O R Y R BASKETBALL Dominion A T I L COURTS C I M O L D D O M I N I O N / 22ND STREET N R O U T E 2 9 N Arlington Public Schools QUINN EVANS ARCHITECTS Stratford Middle School - 6

  7. APPROVED PROJECT COST AND FUNDING - 11/5/15 PROJECT COST (IN MILLIONS) SITE WORK (RECOMMENDED SITE OPTION) $ 6.38 ADDITION (35,000 GSF) $ 17.56 RENOVATION $ 6.77 APS STAFF $ 0.55 TOTAL PROJECT COST $ 31.26 PROJECT FUNDING (IN MILLIONS) APS COUNTY TOTAL BONDS $ 26.76 $ 0.00 $ 26.76 OTHER $ 0.80 $ 0.00 $ 0.80 JOINT FUND $ 1.85 $ 1.85 $ 3.70 TOTAL FUNDING $ 29.41 $ 1.85 $ 31.26 Note: Figures may not sum to totals due to rounding error. Arlington Public Schools QUINN EVANS ARCHITECTS Stratford Middle School - 7

  8. APPROVED PROJECT COST RANGE - 11/5/15 • Total funding available for the project to range from a minimum of $31.26 million to a maximum of $36.3 million. • Additional costs beyond the $31.26 million maximum must be justifj ed by the BLPC and APS stafg . • Up to $250,000 of additional funding to be made available to provide commemorative artwork/interpretation and signage regarding the historic signifj cance of the Stratford Building. Arlington Public Schools QUINN EVANS ARCHITECTS Stratford Middle School - 8

  9. SCHEMATIC DESIGN

  10. SITE AERIAL VIEW • 40,000 sf addition • Exit only driveway connection from Vacation Lane to Old Dominion Drive • Expanded surface parking ofg Vacation Lane • Renovation of existing building to accommodate new program • 144 parking spaces Arlington Public Schools QUINN EVANS ARCHITECTS Stratford Middle School - 10

  11. DESIGN PRINCIPLES • Accommodates program and provides quality learning environments • Creates opportunity for new “heart of school” • Connects to existing building circulation network • Leaves existing historic building intact while interior renovations provide a unifj ed Middle School • Preserves views of historic south facades of existing building • Maintains fm ow from classroom wing to fj eld • Improves site circulation and accessibility for vehicles, bicycles and all pedestrians • Provides a safer pedestrian experience with improvements to Vacation Lane • Minimizes impact to Stratford Park renovation plan and schedule Arlington Public Schools QUINN EVANS ARCHITECTS Stratford Middle School - 11

  12. SITE PLAN DRIVEWAY CONNECTION TO OLD DOMINION N 23RD ST OLD DOMINION DRIVE N . V A C A T I O N L A N E Arlington Public Schools QUINN EVANS ARCHITECTS Stratford Middle School - 12

  13. ALTERNATE SITE PLAN NO DRIVEWAY CONNECTION TO OLD DOMINION N 23RD ST OLD DOMINION DRIVE N . V A C A T I O N L A N E Arlington Public Schools QUINN EVANS ARCHITECTS Stratford Middle School - 13

  14. BASEMENT PLAN �� LIBRARY TEACHER & STORAGE FOOD SERVICE ADMIN PHYSICAL EDUCATION COUNSELING/CLINIC THEATER/ARTS N CORE CLASSROOMS 20’ 0’ 40’ MUSIC SPECIAL EDUCATION TECHNOLOGY ELECTIVE CLASSROOMS WORK & FAMILY STUDY CIRCULATION Arlington Public Schools BUILDING SUPPORT ENTRANCE QUINN EVANS ARCHITECTS Stratford Middle School - 14

  15. FIRST FLOOR PLAN �� �� LIBRARY TEACHER & STORAGE FOOD SERVICE ADMIN PHYSICAL EDUCATION COUNSELING/CLINIC THEATER/ARTS N CORE CLASSROOMS 20’ 0’ 40’ MUSIC SPECIAL EDUCATION TECHNOLOGY ELECTIVE CLASSROOMS WORK & FAMILY STUDY CIRCULATION Arlington Public Schools BUILDING SUPPORT ENTRANCE QUINN EVANS ARCHITECTS Stratford Middle School - 15

  16. SECOND FLOOR PLAN LIBRARY TEACHER & STORAGE FOOD SERVICE ADMIN PHYSICAL EDUCATION COUNSELING/CLINIC THEATER/ARTS N CORE CLASSROOMS 20’ 0’ 40’ MUSIC SPECIAL EDUCATION TECHNOLOGY ELECTIVE CLASSROOMS WORK & FAMILY STUDY CIRCULATION Arlington Public Schools BUILDING SUPPORT ENTRANCE QUINN EVANS ARCHITECTS Stratford Middle School - 16

  17. THIRD FLOOR PLAN �� �� �� �� �� �� �� LIBRARY TEACHER & STORAGE FOOD SERVICE ADMIN PHYSICAL EDUCATION COUNSELING/CLINIC THEATER/ARTS N CORE CLASSROOMS 20’ 0’ 40’ MUSIC SPECIAL EDUCATION TECHNOLOGY ELECTIVE CLASSROOMS WORK & FAMILY STUDY CIRCULATION Arlington Public Schools BUILDING SUPPORT ENTRANCE QUINN EVANS ARCHITECTS Stratford Middle School - 17

  18. VIEW FROM OLD DOMINION Arlington Public Schools QUINN EVANS ARCHITECTS Stratford Middle School - 18

  19. VIEW FROM EAST Arlington Public Schools QUINN EVANS ARCHITECTS Stratford Middle School - 19

  20. SOUTH FACADE Arlington Public Schools QUINN EVANS ARCHITECTS Stratford Middle School - 20

  21. HEART OF SCHOOL ENTRY Arlington Public Schools QUINN EVANS ARCHITECTS Stratford Middle School - 21

  22. HEART OF SCHOOL COMMONS Arlington Public Schools QUINN EVANS ARCHITECTS Stratford Middle School - 22

  23. HEART OF SCHOOL MEDIA CENTER Arlington Public Schools QUINN EVANS ARCHITECTS Stratford Middle School - 23

  24. PROGRAM

  25. ED SPEC - PROGRAM BLOCKS - INITIAL CONCEPT 1,000 STUDENTS: EXISTING + 45,000 SF ADDITION g s c a b y t m t c y E y e d l t e n r r a r e i i r i l g v c n a A A P E o i n r a o s i i m c m i d a i e l o i o u t p l r o l e i l t g l c o p d v C b M a a p e C r o s n e t S r i s i A f F n c s u n e L l a r i s m E e u S t h u S C e & n a c p C o h r g l e t o C k e S c C n n d r T a f e i u r e o d d e e r W t T l P o S u i u t C S B Arlington Public Schools QUINN EVANS ARCHITECTS Stratford Middle School - 25

  26. ED SPEC - PROGRAM BLOCKS - APPROVED CONCEPT 1,000 STUDENTS: EXISTING + 35,000 SF ADDITION • Reduction of 10,000 gsf / 7,000 sf of program • Renovated existing Media Center in place • Reduced Locker Rooms • Reduced PE Storage and Of ces g s c a b y t m t c y E y e d l t e n r r a r e i i r i l g v c n a A A P E o i n r a o s i i m c m i d a i e l o i o u t p l r o l e i l t g l c o p d v C b M a a p e C r o s n e t S r i s i A f F n c s u n e L l a r i s m E e u S t h u S C e & n a c p C o h r g l e t o C k e S c C n n d r T a f e i u r e o d d e e r W t T l P o S u i u t C S B Arlington Public Schools QUINN EVANS ARCHITECTS Stratford Middle School - 26

  27. ED SPEC - PROGRAM BLOCKS - SCHEMATIC DESIGN 1,000 STUDENTS: EXISTING + 40,000 SF ADDITION • Increase of 5,000 gsf / 3,000 sf of program • New Media Center and Student Commons • Added Health Classroom • Refj nement to Ed Spec • Added Special Ed Classroom g s c a b y t m t c y E y e d l t e n r r a r e i i r i l g v c n a A A P E o i n r a o s i i m c m i d a i e l o i o u t p l r o l e i l t g l c o p d v C b M a a p e C r o s n e t S r i s i A f F n c s u n e L l a r i s m E e u S t h u S C e & n a c p C o h r g l e t o C k e S c C n n d r T a f e i u r e o d d e e r W t T l P o S u i u t C S B Arlington Public Schools QUINN EVANS ARCHITECTS Stratford Middle School - 27

  28. COST ANALYSIS

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.