PROJECT SCHEDULE
BLPC (Bi-weekly)
11/9-#14 12/7-#16 12/21-#17 11/23-#15 11/12-#7 12/16-#9
PFRC (Monthly) SCHOOL BOARD DEC 2015/2016 JAN JUN JUL AUG SEP FEB MAR APR MAY NOV
11/16 Action Item 11/5 Info Item 12/3 CMaR Pre-Cons. 12/8 Historic Des.
SCHEMATIC DESIGN MEETINGS
1/4 -#18 2/1 -#20 3/7 - #22 2/22 -#21 1/20 -#19 1/20 -#10 2/17-#11 3/16-#12 3/17 SD Info Item 4/7 SD Action Item
12/15 County Board approved School Board motion on Historic District designation process 2/17 - TIA available for review April/May 2016: Submit Use Permit July/Sept 2016: County Board Hearing for Use Permit
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 4
RECENT AND UPCOMING MEETINGS
- Combined PFRC & BLPC 1/20
- Ongoing coordination with Department of Parks and Recreation
BUILDING DESIGN UPDATE | 3
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 6
DESIGN GUIDELINES
BUILDING MASSING
- Existing massing refm
ects “form follows function”
- Strong vertical and horizontal elements that respond to the topography
- “Future additions should emulate this formula so that the rationale behind the
massing of the entire building remains consistent.”
A B C
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 7
DESIGN GUIDELINES
BUILDING MATERIALS
- Precedent Materials
A D E F G B C
- Existing materials: brick, limestone panels, and ashlar stone.
- Proposed additions should be “appropriately difg
erentiated from the historic fabric.” Existing materials:
Precedent materials:
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 8
Architectural Features of the Historic School
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 9
MATERIALS PRECEDENTS
Terracotta Brick / Metal Zinc / Stone Copper Channel Glass
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 10
OPTION A
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 11
OPTION B
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 12
Fenestration Proportion Study
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 13
OPTION A
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 14
OPTION B
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 15
OPTION A
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 16
OPTION B
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 17
BASEMENT
UP0’ 20’ 40’
N
LIBRARY FOOD SERVICE PHYSICAL EDUCATION THEATER/ARTS MUSIC WORK & FAMILY STUDY BUILDING SUPPORT TEACHER & STORAGE ADMIN COUNSELING/CLINIC CORE CLASSROOMS SPECIAL EDUCATION ELECTIVE CLASSROOMS CIRCULATION ENTRANCE
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 18
- 0’
20’ 40’
N
LIBRARY FOOD SERVICE PHYSICAL EDUCATION THEATER/ARTS MUSIC WORK & FAMILY STUDY BUILDING SUPPORT TEACHER & STORAGE ADMIN COUNSELING/CLINIC CORE CLASSROOMS SPECIAL EDUCATION ELECTIVE CLASSROOMS CIRCULATION ENTRANCE
FIRST FLOOR
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 19
SECOND FLOOR
0’ 20’ 40’
N
LIBRARY FOOD SERVICE PHYSICAL EDUCATION THEATER/ARTS MUSIC WORK & FAMILY STUDY BUILDING SUPPORT TEACHER & STORAGE ADMIN COUNSELING/CLINIC CORE CLASSROOMS SPECIAL EDUCATION ELECTIVE CLASSROOMS CIRCULATION ENTRANCE
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 20
THIRD FLOOR
UP UP0’ 20’ 40’
N
LIBRARY FOOD SERVICE PHYSICAL EDUCATION THEATER/ARTS MUSIC WORK & FAMILY STUDY BUILDING SUPPORT TEACHER & STORAGE ADMIN COUNSELING/CLINIC CORE CLASSROOMS SPECIAL EDUCATION ELECTIVE CLASSROOMS CIRCULATION ENTRANCE
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 21
0’ 20’ 40’
N
FIRST FLOOR
COMMUNITY USE
Aux. Gym Auditorium
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 22
UP UP UP UP UP UP UPSECOND FLOOR
COMMUNITY USE
0’ 20’ 40’
N
Gym Cafeteria Media Center
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 23
PUBLICLY ACCESSIBLE RESTROOMS
- Can new school
restrooms be accessible to park users from building exterior?
- Restrooms for park users
both during school and after hours
- Construction in the
new addition would make easier plumbing connections PARK USE
Option 1 Option 2
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 24
ACCESSIBILITY
WEST ELEVATOR
1st Floor 2nd Floor 3rd Floor Existing
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 25
ACCESSIBILITY
WEST ELEVATOR
1st Floor 2nd Floor 3rd Floor Existing Existing: Opposite Doors
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 26
ACCESSIBILITY
WEST ELEVATOR
1st Floor 2nd Floor 3rd Floor Existing Existing: Opposite Doors In New Addition
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 27
ACCESSIBILITY
WEST ELEVATOR
1st Floor 2nd Floor 3rd Floor Existing Existing: Opposite Doors In New Addition
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 28
ACCESSIBILITY
- Existing elevator at east
end of building remains. It travels between B and 1.
- New elevator from 1 to
3 to be added adjacent to stairs at east end of existing central classroom block.
Basement 1st Floor 2nd Floor 3rd Floor
EAST ELEVATOR
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 37
- N. VACATION
OLD DOMINION / ROUTE 29 23RD STREET N
150' 150' 30' 30' 30'
DRIVEWAY OPTION
FIRE ACCESS
- Fire access to existing
building does not meet code
- Removing a major f
re access point by building on west parking lot
- Existing roof and addition
roof are 30’ above “grade plane” at nearly all locations, so ladder truck access is required.
- Ladder truck access required
at a maximum distance of 30’ from the building along
- ne side
- Still exploring ways to
comply on a challenging site
30’ perimeter offset Possible fi re lane required
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 34
EXISTING TREES TO BE IMPACTED
LANDSCAPE OPPORTUNITIES
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 36
PROPOSED TREES
LANDSCAPE OPPORTUNITIES
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 32
TREE IMPACT
- 368 trees on APS site
- 163 (approximate total)
to be removed
- 205 to remain
- Currently, no “level 1”
trees will be removed
- Required to replace
approximately 200 trees
QUINN EVANS ARCHITECTS
Arlington Public Schools Stratford Middle School - 33
TREE IMPACT
S Design D No. Date Description Rev. By App. By REVISIONS Horizontal Datu Boundary and T Vertical Datum:T
CH C GORDON R Computer File Na- ISA No
Tree Impact Assessment Preliminary
- Revised counts of trees in
each preservation priority level
- Arborist identifying
trees that require special removal
- “No Driveway” scenario
would have 20-30 fewer trees removed
LEVEL TOTAL X