STRATFORD MIDDLE SCHOOL RENOVATION AND ADDITION ARLINGTON PUBLIC SCHOOLS BLPC # 20 FEBRUARY 01, 2016 SCHEDULE AND MEETINGS | 1 PROJECT SCHEDULE SCHEMATIC DESIGN MEETINGS 2015/2016 NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP BLPC


slide-1
SLIDE 1

STRATFORD MIDDLE SCHOOL RENOVATION AND ADDITION

ARLINGTON PUBLIC SCHOOLS BLPC # 20 FEBRUARY 01, 2016

slide-2
SLIDE 2

SCHEDULE AND MEETINGS | 1

slide-3
SLIDE 3

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 3

PROJECT SCHEDULE

BLPC (Bi-weekly)

11/9-#14 12/7-#16 12/21-#17 11/23-#15 11/12-#7 12/16-#9

PFRC (Monthly) SCHOOL BOARD DEC 2015/2016 JAN JUN JUL AUG SEP FEB MAR APR MAY NOV

11/16 Action Item 11/5 Info Item 12/3 CMaR Pre-Cons. 12/8 Historic Des.

SCHEMATIC DESIGN MEETINGS

1/4 -#18 2/1 -#20 3/7 - #22 2/22 -#21 1/20 -#19 1/20 -#10 2/17-#11 3/16-#12 3/17 SD Info Item 4/7 SD Action Item

12/15 County Board approved School Board motion on Historic District designation process 2/17 - TIA available for review April/May 2016: Submit Use Permit July/Sept 2016: County Board Hearing for Use Permit

slide-4
SLIDE 4

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 4

RECENT AND UPCOMING MEETINGS

  • Combined PFRC & BLPC 1/20
  • Ongoing coordination with Department of Parks and Recreation
slide-5
SLIDE 5

BUILDING DESIGN UPDATE | 3

slide-6
SLIDE 6

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 6

DESIGN GUIDELINES

BUILDING MASSING

  • Existing massing refm

ects “form follows function”

  • Strong vertical and horizontal elements that respond to the topography
  • “Future additions should emulate this formula so that the rationale behind the

massing of the entire building remains consistent.”

A B C

slide-7
SLIDE 7

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 7

DESIGN GUIDELINES

BUILDING MATERIALS

  • Precedent Materials

A D E F G B C

  • Existing materials: brick, limestone panels, and ashlar stone.
  • Proposed additions should be “appropriately difg

erentiated from the historic fabric.” Existing materials:

Precedent materials:

slide-8
SLIDE 8

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 8

Architectural Features of the Historic School

slide-9
SLIDE 9

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 9

MATERIALS PRECEDENTS

Terracotta Brick / Metal Zinc / Stone Copper Channel Glass

slide-10
SLIDE 10

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 10

OPTION A

slide-11
SLIDE 11

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 11

OPTION B

slide-12
SLIDE 12

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 12

Fenestration Proportion Study

slide-13
SLIDE 13

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 13

OPTION A

slide-14
SLIDE 14

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 14

OPTION B

slide-15
SLIDE 15

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 15

OPTION A

slide-16
SLIDE 16

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 16

OPTION B

slide-17
SLIDE 17

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 17

BASEMENT

UP

0’ 20’ 40’

N

LIBRARY FOOD SERVICE PHYSICAL EDUCATION THEATER/ARTS MUSIC WORK & FAMILY STUDY BUILDING SUPPORT TEACHER & STORAGE ADMIN COUNSELING/CLINIC CORE CLASSROOMS SPECIAL EDUCATION ELECTIVE CLASSROOMS CIRCULATION ENTRANCE

slide-18
SLIDE 18

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 18

  • 0’

20’ 40’

N

LIBRARY FOOD SERVICE PHYSICAL EDUCATION THEATER/ARTS MUSIC WORK & FAMILY STUDY BUILDING SUPPORT TEACHER & STORAGE ADMIN COUNSELING/CLINIC CORE CLASSROOMS SPECIAL EDUCATION ELECTIVE CLASSROOMS CIRCULATION ENTRANCE

FIRST FLOOR

slide-19
SLIDE 19

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 19

SECOND FLOOR

0’ 20’ 40’

N

LIBRARY FOOD SERVICE PHYSICAL EDUCATION THEATER/ARTS MUSIC WORK & FAMILY STUDY BUILDING SUPPORT TEACHER & STORAGE ADMIN COUNSELING/CLINIC CORE CLASSROOMS SPECIAL EDUCATION ELECTIVE CLASSROOMS CIRCULATION ENTRANCE

slide-20
SLIDE 20

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 20

THIRD FLOOR

UP UP

0’ 20’ 40’

N

LIBRARY FOOD SERVICE PHYSICAL EDUCATION THEATER/ARTS MUSIC WORK & FAMILY STUDY BUILDING SUPPORT TEACHER & STORAGE ADMIN COUNSELING/CLINIC CORE CLASSROOMS SPECIAL EDUCATION ELECTIVE CLASSROOMS CIRCULATION ENTRANCE

slide-21
SLIDE 21

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 21

0’ 20’ 40’

N

FIRST FLOOR

COMMUNITY USE

Aux. Gym Auditorium

slide-22
SLIDE 22

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 22

UP UP UP UP UP UP UP

SECOND FLOOR

COMMUNITY USE

0’ 20’ 40’

N

Gym Cafeteria Media Center

slide-23
SLIDE 23

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 23

PUBLICLY ACCESSIBLE RESTROOMS

  • Can new school

restrooms be accessible to park users from building exterior?

  • Restrooms for park users

both during school and after hours

  • Construction in the

new addition would make easier plumbing connections PARK USE

Option 1 Option 2

slide-24
SLIDE 24

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 24

ACCESSIBILITY

WEST ELEVATOR

1st Floor 2nd Floor 3rd Floor Existing

slide-25
SLIDE 25

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 25

ACCESSIBILITY

WEST ELEVATOR

1st Floor 2nd Floor 3rd Floor Existing Existing: Opposite Doors

slide-26
SLIDE 26

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 26

ACCESSIBILITY

WEST ELEVATOR

1st Floor 2nd Floor 3rd Floor Existing Existing: Opposite Doors In New Addition

slide-27
SLIDE 27

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 27

ACCESSIBILITY

WEST ELEVATOR

1st Floor 2nd Floor 3rd Floor Existing Existing: Opposite Doors In New Addition

slide-28
SLIDE 28

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 28

ACCESSIBILITY

  • Existing elevator at east

end of building remains. It travels between B and 1.

  • New elevator from 1 to

3 to be added adjacent to stairs at east end of existing central classroom block.

Basement 1st Floor 2nd Floor 3rd Floor

EAST ELEVATOR

slide-29
SLIDE 29

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 37

  • N. VACATION

OLD DOMINION / ROUTE 29 23RD STREET N

150' 150' 30' 30' 30'

DRIVEWAY OPTION

FIRE ACCESS

  • Fire access to existing

building does not meet code

  • Removing a major f

re access point by building on west parking lot

  • Existing roof and addition

roof are 30’ above “grade plane” at nearly all locations, so ladder truck access is required.

  • Ladder truck access required

at a maximum distance of 30’ from the building along

  • ne side
  • Still exploring ways to

comply on a challenging site

30’ perimeter offset Possible fi re lane required

slide-30
SLIDE 30

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 34

EXISTING TREES TO BE IMPACTED

LANDSCAPE OPPORTUNITIES

slide-31
SLIDE 31

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 36

PROPOSED TREES

LANDSCAPE OPPORTUNITIES

slide-32
SLIDE 32

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 32

TREE IMPACT

  • 368 trees on APS site
  • 163 (approximate total)

to be removed

  • 205 to remain
  • Currently, no “level 1”

trees will be removed

  • Required to replace

approximately 200 trees

slide-33
SLIDE 33

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 33

TREE IMPACT

S Design D No. Date Description Rev. By App. By REVISIONS Horizontal Datu Boundary and T Vertical Datum:

T

CH C GORDON R Computer File Na
  • ISA No

Tree Impact Assessment Preliminary

  • Revised counts of trees in

each preservation priority level

  • Arborist identifying

trees that require special removal

  • “No Driveway” scenario

would have 20-30 fewer trees removed

LEVEL TOTAL X