STRATFORD MIDDLE SCHOOL RENOVATION AND ADDITION ARLINGTON PUBLIC - - PowerPoint PPT Presentation

stratford middle school renovation and addition
SMART_READER_LITE
LIVE PREVIEW

STRATFORD MIDDLE SCHOOL RENOVATION AND ADDITION ARLINGTON PUBLIC - - PowerPoint PPT Presentation

STRATFORD MIDDLE SCHOOL RENOVATION AND ADDITION ARLINGTON PUBLIC SCHOOLS SCHOOL BOARD ACTION MEETING CONCEPT DESIGN NOVEMBER 16, 20 5 PROJECT SCOPE OVERVIEW EXHIBIT A Seating capacity of 1,000 students 35,000 sf


slide-1
SLIDE 1

STRATFORD MIDDLE SCHOOL RENOVATION AND ADDITION

ARLINGTON PUBLIC SCHOOLS SCHOOLBOARDACTIONMEETING CONCEPT DESIGN NOVEMBER 16,205

slide-2
SLIDE 2

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 2

PROJECT SCOPE OVERVIEW

  • Seating capacity of 1,000 students
  • 35,000 sf minimum addition on the west side of the existing building
  • 144 parking spaces
  • Driveway connection between Vacation Lane and Old Dominion Drive
  • Traffj

c and safety improvements on Vacation Lane

  • Safe pedestrian crossing at Old Dominion
  • An alternate site layout without a driveway connection in the event that

VDOT does not approve a vehicular exit at Old Dominion Drive

EXHIBIT A

slide-3
SLIDE 3

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 3

  • 35,000 sf minimum

west addition

  • Exit only driveway

connection onto Old Dominion Drive from Vacation Lane

  • Expanded surface

parking of Vacation Lane to replace 50 spaces lost

  • 144 parking spaces

BALL FIELD TENNIS COURTS BASKETBALL COURTS STRATFORD / HB WOODLAWN

  • N. VACATION LANE

O L D D O M I N I O N / R O U T E 2 9 LORCOM LANE M I L I T A R Y R O A D

  • N. VACATION LANE

2 3 R D S T R E E T N 22ND STREET N N

PLAYING FIELD C

LEGEND Property Line Phase 1 Parent Drop-off Possible Outdoor Learning Amenity Bus Drop-off New Building Entry

PROPOSED SITE PLAN

EXHIBIT B

slide-4
SLIDE 4

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 4

  • No driveway

connection between Vacation Lane and Old Dominion Drive

  • Provided in the

event that VDOT does not approve a vehicular exit at Old Dominion

BALL FIELD TENNIS COURTS BASKETBALL COURTS STRATFORD / HB WOODLAWN

  • N. VACATION LANE

O L D D O M I N I O N / R O U T E 2 9 LORCOM LANE M I L I T A R Y R O A D

  • N. VACATION LANE

2 3 R D S T R E E T N 22ND STREET N N

PLAYING FIELD C

LEGEND Property Line Phase 1 Parent Drop-off Possible Outdoor Learning Amenity Bus Drop-off New Building Entry

ALTERNATIVE SITE PLAN

EXHIBIT C

slide-5
SLIDE 5

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 5

VACATION LANE IMPROVEMENTS

EXHIBIT D

slide-6
SLIDE 6

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 6

WEST ADDITION WITH DRIVEWAY CONNECTION

CONCEPTUAL MASSING

EXHIBIT E

slide-7
SLIDE 7

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 7

PROJECT COST AND FUNDING (MILLIONS)

PROJECT COST

SITE WORK (RECOMMENDED SITE OPTION) $ 6.38 ADDITION (35,000 GSF) $ 17.56 RENOVATION $ 6.77 APS STAFF $ 0.55 TOTAL PROJECT COST $ 31.26

PROJECT FUNDING APS COUNTY TOTAL

BONDS $ 26.76 $ 0.00 $ 26.76 OTHER $ 0.80 $ 0.00 $ 0.80 JOINT FUND $ 1.85 $ 1.85 $ 3.70 TOTAL FUNDING $ 29.41 $ 1.85 $ 31.26

Note: Figures may not sum to totals due to rounding error.

EXHIBIT F

slide-8
SLIDE 8

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 8

PROJECT COST RANGE

  • BLPC recommends $5 million additional funding to ensure

instructional, safety, historic, recreational, community and environmental needs are balanced ef ectively during the schematic design.

  • With the BLPC recommendation the estimated project cost is $36.3 M

EXHIBIT G

slide-9
SLIDE 9

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 9

PRELIMINARY MILESTONE SCHEDULE

STRATFORDMIDDLESCHOOL Start Finish Design(22months) Apr2015 Jan2017 SBApprovesCMRPreconstructionContract Nov2015 Nov2015 SBApprovesConceptDesign Nov2015 Nov2015 SBApprovesSchematicDesign Feb2016 Feb2016 UsePermitApproval Jun2016 Jun2016 SBApprovesFinalDesign Jan2017 Jan2017 GMP/Procurement(4months) Feb2017 May2017 SBApprovesCMRConstructionContract May2017 May2017 Construction(26months) Jun2017 Jul2019 Furniture/Technology Aug2019 Aug2019 SchoolOpening Sep2019 Sep2019 2015 2016 2017 2018 2019

EXHIBIT H