STRATFORD MIDDLE SCHOOL RENOVATION AND ADDITION ARLINGTON PUBLIC SCHOOLS SCHOOL BOARD ACTION MEETING 02 JUNE 2016 SITE AERIAL VIEW EXHIBIT A 40,000 sf addition Exit only driveway connection from Vacation Lane to Old Dominion Drive


slide-1
SLIDE 1

STRATFORD MIDDLE SCHOOL RENOVATION AND ADDITION

ARLINGTON PUBLIC SCHOOLS SCHOOL BOARD ACTION MEETING 02 JUNE 2016

slide-2
SLIDE 2

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 2

SITE AERIAL VIEW

  • 40,000 sf addition
  • Exit only driveway

connection from Vacation Lane to Old Dominion Drive

  • Expanded surface

parking ofg Vacation Lane

  • Renovation of

existing building to accommodate new program

  • 144 parking spaces

EXHIBIT A

slide-3
SLIDE 3

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 3

SITE PLAN

DRIVEWAY CONNECTION TO OLD DOMINION

N . V A C A T I O N L A N E N 23RD ST OLD DOMINION DRIVE

EXHIBIT B

slide-4
SLIDE 4

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 4

ADA PATH FROM OLD DOMINION

slide-5
SLIDE 5

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 5

VACATION LANE IMPROVEMENTS EXHIBIT C

slide-6
SLIDE 6

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 6

BASEMENT PLAN

  • 0’

20’ 40’

N

LIBRARY FOOD SERVICE PHYSICAL EDUCATION THEATER/ARTS MUSIC TECHNOLOGY WORK & FAMILY STUDY BUILDING SUPPORT TEACHER & STORAGE ADMIN COUNSELING/CLINIC CORE CLASSROOMS SPECIAL EDUCATION ELECTIVE CLASSROOMS CIRCULATION ENTRANCE

EXHIBIT D

slide-7
SLIDE 7

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 7

FIRST FLOOR PLAN

  • 0’

20’ 40’

N

LIBRARY FOOD SERVICE PHYSICAL EDUCATION THEATER/ARTS MUSIC TECHNOLOGY WORK & FAMILY STUDY BUILDING SUPPORT TEACHER & STORAGE ADMIN COUNSELING/CLINIC CORE CLASSROOMS SPECIAL EDUCATION ELECTIVE CLASSROOMS CIRCULATION ENTRANCE

EXHIBIT E

slide-8
SLIDE 8

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 8

SECOND FLOOR PLAN

0’ 20’ 40’

N

LIBRARY FOOD SERVICE PHYSICAL EDUCATION THEATER/ARTS MUSIC TECHNOLOGY WORK & FAMILY STUDY BUILDING SUPPORT TEACHER & STORAGE ADMIN COUNSELING/CLINIC CORE CLASSROOMS SPECIAL EDUCATION ELECTIVE CLASSROOMS CIRCULATION ENTRANCE

EXHIBIT F

slide-9
SLIDE 9

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 9

  • THIRD FLOOR PLAN

0’ 20’ 40’

N

LIBRARY FOOD SERVICE PHYSICAL EDUCATION THEATER/ARTS MUSIC TECHNOLOGY WORK & FAMILY STUDY BUILDING SUPPORT TEACHER & STORAGE ADMIN COUNSELING/CLINIC CORE CLASSROOMS SPECIAL EDUCATION ELECTIVE CLASSROOMS CIRCULATION ENTRANCE

EXHIBIT G

slide-10
SLIDE 10

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 10

COST ESTIMATE

PROJECT COST ($ MILLIONS)1

SITE WORK $ 8.15 ADDITION $ 20.14 RENOVATION $ 7.12 APS STAFF $ 0.55 EXPAND SCOPE OF LIGHTING REPLACEMENT2 $ 0.34 SUBTOTAL PROJECT COST3 $ 36.30 HISTORIC COMMEMORATION ALLOWANCE $ 0.25 TOTAL PROJECT COST $ 36.55

NOTES:

  • 1. Based on two independent professional cost estimates.
  • 2. Recommended to enhance Universal Design, improve the quality of the instructional

environment, and reduce energy.

  • 3. Matches maximum approved by the School Board at Concept Design.

EXHIBIT H

slide-11
SLIDE 11

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 11

FUNDING AVAILABLE

PROJECT FUNDING ($ MILLIONS)

MAJOR CONSTRUCTION BONDS $ 31.29 CAPITAL RESERVE1 $ 0.25 OTHER2 $ 0.80 SUBTOTAL $ 32.34 COUNTY/SCHOOL BOARD JOINT FUND APS FUNDING $ 2.11 COUNTY FUNDING $ 2.11 SUBTOTAL JOINT FUND $ 4.21 GRAND TOTAL FUNDING AVAILABLE3 $ 36.55

EXHIBIT J

NOTES:

  • 1. Funding source for historic commemoration allowance.
  • 2. Furniture and equipment that cannot be bond funded.
  • 3. Figures may not total due to rounding.
slide-12
SLIDE 12

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 12

JOINT FUND ITEMS

JOINT FUND OPTIONS ($ MILLIONS)

# DESCRIPTION ESTIMATE1 1 ROADWAY CONNECTION BETWEEN VACATION LANE AND OLD DOMINION DRIVE INCLUDING FIRE ACCESS IMPROVEMENTS $ 2.15 2 VACATION LANE IMPROVEMENTS $ 1.02 3 SIGNAL AT OLD DOMINION DRIVE $ 0.51 4 UTILITY UNDERGROUNDING $ 0.25 5 EMERGENCY RESPONDER NETWORK $ 0.25 6 PUBLICLY ACCESSIBLE RESTROOM ADJACENT TO STRATFORD PARK $ 0.03 TOTAL $ 4.21

EXHIBIT K

NOTES:

  • 1. Includes construction, soft, and contingency costs.
slide-13
SLIDE 13

QUINN EVANS ARCHITECTS

Arlington Public Schools Stratford Middle School - 13

MILESTONE DATES

  • Use Permit Submission - July 2016
  • Use Permit Approval - November 2016
  • Final Design - June 2017
  • School Opening - September 2019