Purple Line Extension
Wilshire/La Cienega and Wilshire/Rodeo Stations July 10, 2019
1
Purple Line Extension Wilshire/La Cienega and Wilshire/Rodeo - - PowerPoint PPT Presentation
Purple Line Extension Wilshire/La Cienega and Wilshire/Rodeo Stations July 10, 2019 1 Agenda Project oject Overvi rview ew Section ion 2 Pre-Con onst struction uction Upda dates tes Section ion 1 Cons nstruct
Wilshire/La Cienega and Wilshire/Rodeo Stations July 10, 2019
1
2
rview ew
ion 1 Cons nstruct uction
dates
Excavation
ion 2 Pre-Con
struction uction Upda dates tes
Instrumentation
ness Inter terru rupt ption
p Play y #Beverly verlyHill ills
Project Alignment
3
4 *Subject to change. The PLE project team is working to deliver the project consistent with Measure M
Foreca cast sted ed Sched edule ule Section ion
Section 1 Section 2 Section 3
Leng ngth th
3.92 Miles 2.59 Miles 2.56 Miles
New Stat ation ions
Wilshire/La Brea Wilshire/Fairfax Wilshire/La Cienega Wilshire/Rodeo Century City/ Constellation Westwood/UCLA Westwood/VA Hospital
Pre-Const nstruct ruction ion Activiti vities es
2014 – 2015 2016 – 2018 2018 – 2019
Const nstruct ruction ion
2015 – 2023 2018 – 2025 2019 – 2027
Opera rati tion
2023 2025 2027
Wilshire/La Cienega Station
5
6
Rendering shows length of the La Cienega underground station box on Wilshire Bl from La Cienega Bl to Tower Dr
*As of July 2019, subject to change 7
Intermittent Daily Gale Closure – North of Wilshire Bl
closed Monday to Saturday, 6am to 6pm
measure due to high volumes of ingress/egress from the property
maintained from San Vicente Bl
until 10pm
8
Gale Dr from north of Wilshire Bl
9
Removing stockpiled excavation material
Instrumentation Work & Street Maintenance
When: Ongoing ing through gh 2019 Instrume ument ntation ion work on Wilshire ire Bl and La Cienega ga Bl
Wilshire Bl, La Cienega Bl, and side streets during off-peak hours (non-rush hour) Street Maintenanc nce, e, Dewatering ing Well Maintenanc nce, e, and Utility ty Work on Wilshire e Bl
Bl and side streets during off-peak hours (non-rush hour)
10
Example of instrumentation drilling
City of Los Angeles
When: Ongoing ing through gh 2019 Construction activities on Wilshire Bl between Fairfax Av and San Vicente Bl may require traffic control in the City of Beverly Hills. Work includes, but is not limited to:
Information on this work and the required traffic control will be available via construction notices.
11
La Cienega ga Yard
lines were wrapped with sound blankets
the ventilation system with sound blankets
the ventilation system have been upgraded allowing for more sound absorption
12
Gale Yard
around the crane
to the 895 crane engine enclosure
door and engine compartment door
lower engine panels
crane counterweight
when possible
to crane motor
13
Station Names will reflect the following principles
xt: names will reflect the property’s location, relative to the entire transit system, and not duplicated elsewhere.
rty area: provide specific information about the property’s location relative to the surrounding area.
hbor
hood identity: ty: acknowledge the communities and neighborhoods serviced by the station and stops.
licity: city: names will be short, easily recognizable and fit for signage and mapping.
14
Metro staff originally developed a set of geographically-based names for the Section 1 Stations and are now seeking community input on those names. Submit your proposals at metro.net/purple
Station Box
16
Rendering shows length of the underground station box
Staging Yards
17
Where re: :
Durat ation:
Star art t Date te: Mid-July 2019 Work rk Hours: Monday – Friday, 8am – 6pm Tra raffic ffic Contro trol: l:
locations during this period
westbound Wilshire Bl, northbound N Cañon Dr, and southbound Reeves Dr from 9am – 4pm
streets as a walk way
Installation of Sound Wall
noise to adjacent properties and public ROW
art t Dat ate: e: Late June 2019
pleti etion
e: Mid-July 2019
k Hours: s: Monday – Friday, 8am – 6pm
18 *Subject to change
Sound wall progress at N Cañon Yard
19
*Subject to change
Example of sewer line replacement
below the street
relocation and storm drain lateral replacement Star art t Date te: April 8, 2019 Durat ation:
Antici cipa pate ted Complet pletion: ion: September 2019* Work rk Ho Hours: :
Traffic raffic Control trol:
20
Installation
Instruments will be installed within the station box area to monitor ground movement, settlement and
within the public right of way and within privately
Start Date: June 24, 2019 Duration:
Work Hours: rs:
Traffic c Control
for this work on Wilshire Bl, Beverly Dr, Reeves Dr, N Cañon Dr, S Cañon Dr, and the northern alleys between Beverly Dr and Crescent Dr.
Example of geotechnical instrument installation in Century City
Traffic Configuration
Sound wall with art on Cañon Dr side and public information graphics on Wilshire Bl side
shift to the north
East to West side
Pedestrian walkway
22
Pile installat ation ion include des:
traffic closures Schedul dule
start Q3 of 2019 on north side of Wilshire Bl Work Hours rs
intersection (Friday 8pm – Monday 7am), for piling and decking, collectively
Example of piling work in Century City
*Dates subject to change
23
Example of progress on Constellation Bl
North Side Piling Set-up
24
Example of construction area with piling set-up on the north side of Wilshire Bl
South Side Piling Set-up
25
Example of construction area with piling set-up on the south side of Wilshire Bl
26 *Dates subject to change
d Traff affic ic Closure ure: Friday 8pm – Monday 7am
rs: Saturday and Sunday 7am – 8pm, 8pm – 10pm non-drilling and break-down
d piling at t the follow lowin ing intersec ection tions and alleys ys: Beverly Dr, Reeves Dr, N Canon Dr (Wall Closure), S Canon Dr. PENDI NDING NG: North alleys between N Cañon Dr and Crescent Dr and between Beverly Dr and N Cañon Dr may be closed in M-F piling rather than weekends
piling operations
Anticipated weekend closures for piling intersections and alleys
N Cañon wall LEGEND Approximate Pile Line Intersection Closures
27
NORTH SIDE E PILING NG:
t Date: September 2019*
during holiday moratorium)
ures Required: ired:
*Dates subject to change
SOUTH SIDE E PILING NG:
t Date: January 2020*
ures Required: ired:
Piling will last approximately 4 months each side
Utility Work Completion (September 2019) N Cañon Dr Wall Completion (September 2019) Piling North Side (September 2019 – January 2020) Piling South Side (January 2020 – May 2020) Decking (Beginning May 2020)
Following Piling: Anticipated May 2020*
28
surface
emergency access and safety Durat ation:
Work rk Hours: : Full closures Friday, 8pm through Monday, 7am Ad Addi ditional tional activitie ivities unde der r decking cking closure ures:
improvements, dewatering system installation and geotechnical instrumentation
Asphalt removal on Wilshire Bl near Detroit St Steel beams welding prior to concrete deck panel installation
*Dates subject to change
Help lping g loca cal l bu busines esses ses as we bu build. Purp rple le Line Ext xten ensio sion n Update te
> Financial assistance to small “mom and pop” businesses with 25 or fewer full-time employees directly impacted by Metro Rail construction along three project areas > Businesses must be located immediately adjacent to the rail corridor and meet other eligibility requirements > Grant amount determined by loss of business revenue related to period of construction disruption > Businesses are eligible for up to $50,000 per impact year
> To date, 932 grants have been awarded with a total value of more than $22.3 million along all three project areas > Crenshaw/LAX Transit Project > Regional Connector, Little Tokyo area > Purple Line Extension Section 1 and Section 2 > February 2019 Metro’s Board of Directors authorized the expansion of the BIF to Section 3 of the Purple Line Extension
> Purp rple le Lin ine Ext xten ensio sion n Secti tion
s of 6/ f 6/28/19) 8/19) > BIF Grants Awarded: 198 > BIF Grant Amount Awarded: $5,142,660.09 > Number of small businesses awarded: 76 > City of Beverly Hills only > BIF Grants Awarded: 34 > BIF Grant Amount Awarded: $884,886.20 > Number of small businesses awarded: 15 > BIF Business Advisor: Brian Lazo, PCR, 213.739.2999
> Purp rple le Lin ine Ext xten ensio sion n Secti tion
s of 6/ f 6/28/19) 8/19) > BIF Grants Awarded: 50 > BIF Grant Amount Awarded: $1,393,595.28 > Number of small businesses awarded: 30 > City of Beverly Hills only > BIF Grants Awarded: 44 > BIF Grant Amount Awarded: $1,244,510.21 > Number of small businesses awarded: 26 > BIF Business Advisor: Darrell Smith, PCR, 213.739.2999
34
107 S Robertson Bl Beverly Hills, CA 90211 424.777.0481
Beverly Hills City Hall 2nd Floor Municipal Gallery 445 N Rexford Dr Beverly Hills, CA 90210
2 hour free parking before 5pm Free after 5pm, no validation necessary
35
Beverly Hills
*Parking will be validated
36
Section 2
37