MOS DETAILED IMPLEMENTATION PLAN The team Alexio Picco Project coordinator; more than 15 years PM experience including 7 MoS projects (MIELE, TRAINMOS 1 and 2, WIDERMOS, POSEIDON MED, ANNA, ONTHEMOSWAY NETWORK) Relevant scienNfic


slide-1
SLIDE 1

MOS DETAILED IMPLEMENTATION PLAN

slide-2
SLIDE 2

The team

Alexio Picco

  • Project coordinator; more than 15 years PM experience including 7 MoS projects (MIELE,

TRAINMOS 1 and 2, WIDERMOS, POSEIDON MED, ANNA, ONTHEMOSWAY NETWORK)

  • Relevant scienNfic experience in the field of mariNme and logisNcs, coordinaNng H2020

project (RCMS) and parNcipaNng in SYNCHRONET

  • Design / development and maintenance of the MoS mulNmedia channel www.onthemosway.eu,

parNcipaNon in the study “Motorways of the Sea today and tomorrow”.

Holger Kramer and Sönke Maatsch

  • Leading in the area of mariNme research, consulNng and knowledge transfer; co-authored MoS

studies

  • Leading insNtuNon in Europe for informaNon and documentaNon in mariNme economics and

logisNcs

  • Experienced in data collecNon, survey techniques and staNsNcal analysis and publishes a number
  • f monthly and annual reports

Aida Axelsson and Luisa Puccio

  • Specialised in EU mariNme policy consultancy, working with industry, authoriNes and

NGOs on all legislaNon affecNng the mariNme sector, internaNonally and regionally

  • Strong involvement in the MoS programme, assisNng on projects such as Methanol: the marine

fuel of the future, WIDERMoS and others

  • Co-authored study Motorways of the Sea today and tomorrow and parNcipated in several

MoS conferences

slide-3
SLIDE 3

Data on ports and shipping from different sources (for example ISL DB, Eurostat, TEN / TEC) + Info from MoS projects and CNCs studies DEVELOPMENT PRIORITIES FOR SELECTED PORTS + METHODOLOGY APPLICABLE TO ALL PORTS Preliminary list of development prioriNes on selected case studies

Stakeholders consultaNon

Development

  • f MoS KPIs

Selected case studies Issue papers to be validated in 3 MoS Fora and contribuNons from stakeholders Further stakeholders Input : liaison with Coordinators and CNCs, interviews, addiNonal events

STRATEGIC APPROACH TO DEFINE AN ARRAY OF DEVELOPMENT PRIORITIES FOR MoS WIDER BENEFITS + LINKS (including addiNonal

elements such as financing, peripherality)

Proceedings from previous MoS fora (Gothenburg Liverpool and Venice) Literature and MoS related projects reviews

MOS DIP

integrated approach by subject by ports by CnCs

slide-4
SLIDE 4

PILLAR 1: ENVIRONMENT SUBMISSIONS WELCOME UNTIL 28/03/2016 jose.anselmo@ec.europa.eu picco@circletouch.eu mos-t@ads-insight.com

slide-5
SLIDE 5

KPIs: Connection with CNCs KPIs

MoS Key Performance Indicators CNC1 CNC2 CNC9 Hinterland connecNon Hinterland connecNon Hinterland connecNon 400 ports

slide-6
SLIDE 6

Onthemosway.eu

News coming from 80 MoS projects Interviews with MEP, MoS managers and key actors in

the field

Dedicated area on MoS Coordinator acNviNes -

announcements of the MoS events and conferences, informaNon on the Coordinator; informaNon on the Coordinator’s acNviNes; presentaNons taken during the MoS events; a brief curriculum vitae of the speakers and a complete agenda of each MoS conference

Stakeholders’ feedback could be also gathered using a

tool for online quesNonnaire

Social network interacNon CoordinaDon will be in place with other EC iniDaDves