CERN TE-ABT-EC LIU-ABT systems: PSB BI.DIS controls prepared by R.A.Barlow (April 2015) 1 BI.DIS Diviseur Capacitif 2 BI.DIS System overview EN/EL power GENERATOR PDC Ext interlock Tx cable 240V/ac Circuit breakers 1 HV Charge


  1. CERN TE-ABT-EC LIU-ABT systems: PSB BI.DIS controls prepared by R.A.Barlow (April 2015) 1

  2. BI.DIS Diviseur Capacitif 2

  3. BI.DIS System overview EN/EL power GENERATOR PDC Ext interlock Tx cable 240V/ac Circuit breakers 1 HV Charge 30 meters of Recovery Profibus Protection Protection PDC controls Dump diode Diodes Diodes 4 5 6 Vref 2 3 Magnet PS HV Capacitor charger Power Supply PFN 240V/ac R IGBT2 IGBT1 Protection 10kv, 1A 6.25 Ω series Diode 240V/ac IGBT Driver 1 + Insulating Tx IGBT1 Trig PFN voltage Snubber1 Snubber2 IGBT2 Trig IGBT Driver 2 + Insulating Tx Trig sig SW1 Electrical discharge switch Trig sig SW2 Freewheel PT100 Opto trigger card PFN temp Triggers diode PFN Fire protection system Timing card, fine delay 7 240V/ac Profibus FAN system Ethernet Master PLC GPS signals: Profibus General purpose controller Micro-sw Temp measurements 240V/ac Profibus Voltage measurements EDS switch controller Contacts actuation Profibus Power supply controller Vref AUE + FLASHERS BIS management BIS sytem To acquisitions Profibus Ethernet Pxi drift stabilisation Profibus Ethernet Pxi fast interlocks 1) Current monitor CT, type 4997 2,3,4) Voltage probes, Ethernet 0.5V/kV IPOC system 5) Current monitor CT, type 4997 6) Current monitor, type Ethernet/CCC CT -J0.1-B Kits timing system 7) Current measure- Machine timing BI.DIS – Functional block diagram Rshunt overview 3

  4. BI.DIS Rack and systems layout 4

  5. BI.DIS Master CPU for 867 prototype

  6. BI.DIS Deported I/O system for PFN

  7. BI.DIS TECHNIX power supply – rear mechanical view

  8. BI.DIS Cabling logistics Coordination of cabling program • DEC • DIC • OPTIC FIBRES • RACKS 8

  9. BI.DIS Outstanding issues BE/CO failure scenarios for operation 9

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.