SANT A MONICA PIE R BR IDGE R E PL ACE ME NT PR OJE CT

slide-2
SLIDE 2

OBJE CTIVE

  • Staff r

e c omme nds that the City Counc il:

  • R

e vie w and c omme nt on the pr

  • pose d

c onc e ptual alte r native s for the Pie r Br idge R e plac e me nt Pr

  • je c t (the Pr
  • je c t)
  • Dir

e c t staff to move for war d with the NE PA and CE QA e nvir

  • nme ntal r

e vie w phase of the Pr

  • je c t c onside r

ing the pr

  • pose d c onc e ptual

alte r native numbe r 1 (with options A & B) and alte r native numbe r 4

slide-3
SLIDE 3

PURPOSE OF PROJE CT

  • Impr
  • ve Str

uc tur al Safe ty

  • R

e plac e Str uc tur ally De fic ie nt and F unc tionally Obsole te Ve hic ular Br idge

  • De sign Br

idge for Ve hic ular / Se ismic L

  • ading
slide-4
SLIDE 4

GUIDING PRINCIPLE S

  • E

nhanc e Pie r Br idge E xpe r ie nc e

  • Compatible with Histor

ic al R e sour c e s

  • Impr
  • ve Pe de str

ian, Bike , Ve hic le Safe ty and R e duc e T r affic Conflic ts

  • Impr
  • ve F

unc tionality and ADA Ac c e ssibility

slide-5
SLIDE 5

PROJE CT DE SCRIPTION

  • Pr

ior Wor k

  • Be ac h Impr
  • ve me nt Gr
  • up Studie s (L

ate 1990’s)

  • Santa Monic a Pie r

DE IR / E A (2006)

R

e tr

  • fit/ R

e habilitation vs. R e plac e me nt

  • F

HWA/ Caltr ans Author ization for R e plac e me nt Pr

  • je c t (May 2012)
slide-6
SLIDE 6

KE Y PROJE CT CONSIDE RATIONS

  • F

e de r al F unding R e quir e me nts

  • Ge ome tr

ic Constr aints

  • E

nvir

  • nme ntal R

e quir e me nts

  • Histor

ic E le me nts (Pie r Sign, Hippodr

  • me ,

Pie r )

  • Constr

uc tion Impac ts

slide-7
SLIDE 7

PROJE CT SITE

slide-8
SLIDE 8

PUBLIC PROCE SS

  • E

ar ly Public E ngage me nt

  • Pie r

Boar d Me e tings (F e b. 6th, Apr . 15th & Aug. 19th)

  • L

andmar ks Commission (Aug. 12th)

  • Community Wor

kshop (June 18th)

40 par

tic ipants in four wor king gr

  • ups
  • Me e tings with Oc e an F

r

  • nt Walk Busine ss and

Pr

  • pe r

ty Owne r s (Aug. 8th)

  • Disability Commission (Nov. 4th)
  • Se nior

s Commission (Nov. 20th)

slide-9
SLIDE 9

PUBLIC PROCE SS (cont.)

  • Soc ial Me dia
  • www.smc onstr

uc ts.or g/ smpie r br idge

  • www.F

ac e book.c om/ SMConstr uc ts

  • T

witte r : www.twitte r .c om/ SMConstr uc ts

TM
slide-10
SLIDE 10

PUBLIC PROCE SS (cont.)

  • Public Outr

e ac h R e sults

  • Disc usse d four

alte r native s

  • Public R

e c omme nde d:

Alte r

native 1

– Dir

e c t ac c e ss to Pie r

– Pr

  • vide s base line func tionality

Alte r

native 4

– Se par

ate s tr ave l mode s (pe de str ians/ bike s/ ve hic le s)

– R

e c e ive d br

  • ad suppor

t by the public , Pie r Boar d, Polic e De par tme nt, and F ir e De par tme nt

slide-11
SLIDE 11

PUBLIC PROCE SS (cont.)

  • Spe c ial Me e ting w/ Oc e an F

r

  • nt Walk

T e nants (Nov 21st)

  • 13 par

tic ipants

  • R

e sults:

Oppose Moss Ave nue Ac c e ss Str

uc tur e (T e mpor ar y

  • r

Pe r mane nt)

R

e c omme nd F ur the r Study of Pie r Ac c e ss Alte r native s suc h as T e mpor ar y R amp fr

  • m 1550 L
  • t
  • n Nor

th Side of Pie r

slide-12
SLIDE 12

CONCE PTS

  • Alte rna tive s

FROM ORIGINAL 70% WIDER THAN EXISTING

ALTERNATIVE 1 REPLACE IN KIND ALTERNATIVE 4 NEW BRIDGE + EMERGENCY / ADA / BIKE

slide-13
SLIDE 13

CONCE PTS – Alternative 1 A – Temporary Moss Avenue Bridge

FROM ORIGINAL

Moss Ave Temp Bridge

70% WIDER THAN EXISTING

slide-14
SLIDE 14

CONCE PTS – Alternative 1 B – Temporary Ramp North Side of Pier

slide-15
SLIDE 15

Pier Bridge Perspective – Alternative 1

Preliminary Concept

Appian Way Perspective

Parking Lot Perspective

slide-16
SLIDE 16

CONCE PTS – Alternative 4

slide-17
SLIDE 17

Pier Bridge Perspective – Alternative 4

Preliminary Concept

Appian Way Perspective

Parking Lot Perspective

slide-18
SLIDE 18

NE XT STE PS

  • Pr

e liminar y E ngine e r ing to r e fine Alte r native s

  • Comple te CE

QA and NE PA e nvir

  • nme ntal

doc ume nts, 18-24 months

  • De te r

mine L

  • c ally Pr

e fe r r e d Alte r native

slide-19
SLIDE 19

CITY COUNCIL ACTION

  • Staff r

e c omme nds that the City Counc il:

  • R

e vie w and c omme nt on the pr

  • pose d

c onc e ptual alte r native s for the Pie r Br idge R e plac e me nt Pr

  • je c t (the Pr
  • je c t)
  • Dir

e c t staff to move for war d with the NE PA and CE QA e nvir

  • nme ntal r

e vie w phase of the Pr

  • je c t c onside r

ing the pr

  • pose d c onc e ptual

alte r native numbe r 1 (with options A&B) and alte r native numbe r 4