IDGE CT BR OJE R PR A MONICA PIE NT ME ACE PL SANT E R OBJE CTIVE Staff r e c omme nds that the City Counc il: R e vie w and c omme nt on the pr opose d c onc e ptual alte r native s for the Pie r Br idge R e plac


  1. IDGE CT BR OJE R PR A MONICA PIE NT ME ACE PL SANT E R

  2. OBJE CTIVE • Staff r e c omme nds that the City Counc il:  R e vie w and c omme nt on the pr opose d c onc e ptual alte r native s for the Pie r Br idge R e plac e me nt Pr oje c t (the Pr oje c t)  Dir e c t staff to move for war d with the NE PA and CE QA e nvir onme ntal r e vie w phase of the Pr oje c t c onside r ing the pr opose d c onc e ptual alte r native numbe r 1 (with options A & B) and alte r native numbe r 4

  3. PURPOSE OF PROJE CT • Impr ove Str uc tur al Safe ty  R e plac e Str uc tur ally De fic ie nt and F unc tionally Obsole te Ve hic ular Br idge  De sign Br idge for Ve hic ular / Se ismic L oading

  4. GUIDING PRINCIPLE S • E nhanc e Pie r Br idge E xpe r ie nc e • Compatible with Histor ic al R e sour c e s • Impr ove Pe de str ian, Bike , Ve hic le Safe ty and R e duc e T r affic Conflic ts • Impr ove F unc tionality and ADA Ac c e ssibility

  5. PROJE CT DE SCRIPTION • Pr ior Wor k  Be ac h Impr ove me nt Gr oup Studie s (L ate 1990’s)  Santa Monic a Pie r DE IR / E A (2006)  R e tr ofit/ R e habilitation vs. R e plac e me nt  F HWA/ Caltr ans Author ization for R e plac e me nt Pr oje c t (May 2012)

  6. KE Y PROJE CT CONSIDE RATIONS • F e de r al F unding R e quir e me nts • Ge ome tr ic Constr aints • E nvir onme ntal R e quir e me nts • Histor ic E le me nts (Pie r Sign, Hippodr ome , Pie r ) • Constr uc tion Impac ts

  7. CT SITE PROJE

  8. PUBLIC PROCE SS • E ar ly Public E ngage me nt . 15 th & Aug.  Pie r e b. 6 th , Apr Boar d Me e tings (F 19 th )  L ks Commission (Aug. 12 th ) andmar  Community Wor kshop (June 18 th )  40 par tic ipants in four wor king gr oups  Me e tings with Oc e an F r ont Walk Busine ss and s (Aug. 8 th ) Pr ope r ty Owne r  Disability Commission (Nov. 4 th )  Se nior s Commission (Nov. 20 th )

  9. PUBLIC PROCE SS (cont.) • Soc ial Me dia  www.smc onstr uc ts.or g/ smpie r br idge  www.F ac e book.c om/ SMConstr uc ts  T witte r : www.twitte r .c om/ SMConstr uc ts TM

  10. PUBLIC PROCE SS (cont.) • Public Outr e ac h R e sults  Disc usse d four alte r native s  Public R e c omme nde d:  Alte r native 1 – Dir e c t ac c e ss to Pie r – Pr ovide s base line func tionality  Alte r native 4 – Se par ate s tr ave l mode s (pe de str ians/ bike s/ ve hic le s) – R e c e ive d br oad suppor t by the public , Pie r Boar d, Polic e De par tme nt, and F ir e De par tme nt

  11. PUBLIC PROCE SS (cont.) • Spe c ial Me e ting w/ Oc e an F r ont Walk e nants (Nov 21 st ) T  13 par tic ipants  R e sults:  Oppose Moss Ave nue Ac c e ss Str uc tur e (T e mpor ar y or Pe r mane nt)  R e c omme nd F ur the r Study of Pie r Ac c e ss Alte r native s suc h as T e mpor ar y R amp fr om 1550 L ot on Nor th Side of Pie r

  12. CONCE PTS • Alte rna tive s 70% WIDER THAN EXISTING FROM ORIGINAL ALTERNATIVE 1 REPLACE IN KIND ALTERNATIVE 4 NEW BRIDGE + EMERGENCY / ADA / BIKE

  13. CONCE PTS – Alternative 1 A – Temporary Moss Avenue Bridge 70% WIDER THAN EXISTING FROM ORIGINAL Moss Ave Temp Bridge

  14. CONCE PTS – Alternative 1 B – Temporary Ramp North Side of Pier

  15. Pier Bridge Perspective – Alternative 1 Preliminary Concept Appian Way Perspective Parking Lot Perspective

  16. PTS – Alternative 4 CONCE

  17. Pier Bridge Perspective – Alternative 4 Preliminary Concept Appian Way Perspective Parking Lot Perspective

  18. NE XT STE PS • Pr e liminar y E ngine e r ing to r e fine Alte r native s • Comple te CE QA and NE PA e nvir onme ntal doc ume nts, 18-24 months • De te r mine L oc ally Pr e fe r r e d Alte r native

  19. CITY COUNCIL ACTION • Staff r e c omme nds that the City Counc il:  R e vie w and c omme nt on the pr opose d c onc e ptual alte r native s for the Pie r Br idge R e plac e me nt Pr oje c t (the Pr oje c t)  Dir e c t staff to move for war d with the NE PA and CE QA e nvir onme ntal r e vie w phase of the Pr oje c t c onside r ing the pr opose d c onc e ptual alte r native numbe r 1 (with options A&B) and alte r native numbe r 4

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.