IDGE CT BR OJE R PR A MONICA PIE NT ME ACE PL SANT E R OBJE CTIVE Staff r e c omme nds that the City Counc il: R e vie w and c omme nt on the pr opose d c onc e ptual alte r native s for the Pie r Br idge R e plac
SLIDE 1
SLIDE 2
OBJE CTIVE
- Staff r
e c omme nds that the City Counc il:
- R
e vie w and c omme nt on the pr
- pose d
c onc e ptual alte r native s for the Pie r Br idge R e plac e me nt Pr
- je c t (the Pr
- je c t)
- Dir
e c t staff to move for war d with the NE PA and CE QA e nvir
- nme ntal r
e vie w phase of the Pr
- je c t c onside r
ing the pr
- pose d c onc e ptual
alte r native numbe r 1 (with options A & B) and alte r native numbe r 4
SLIDE 3
PURPOSE OF PROJE CT
- Impr
- ve Str
uc tur al Safe ty
- R
e plac e Str uc tur ally De fic ie nt and F unc tionally Obsole te Ve hic ular Br idge
- De sign Br
idge for Ve hic ular / Se ismic L
- ading
SLIDE 4
GUIDING PRINCIPLE S
- E
nhanc e Pie r Br idge E xpe r ie nc e
- Compatible with Histor
ic al R e sour c e s
- Impr
- ve Pe de str
ian, Bike , Ve hic le Safe ty and R e duc e T r affic Conflic ts
- Impr
- ve F
unc tionality and ADA Ac c e ssibility
SLIDE 5
PROJE CT DE SCRIPTION
- Pr
ior Wor k
- Be ac h Impr
- ve me nt Gr
- up Studie s (L
ate 1990’s)
- Santa Monic a Pie r
DE IR / E A (2006)
R
e tr
- fit/ R
e habilitation vs. R e plac e me nt
- F
HWA/ Caltr ans Author ization for R e plac e me nt Pr
- je c t (May 2012)
SLIDE 6
KE Y PROJE CT CONSIDE RATIONS
- F
e de r al F unding R e quir e me nts
- Ge ome tr
ic Constr aints
- E
nvir
- nme ntal R
e quir e me nts
- Histor
ic E le me nts (Pie r Sign, Hippodr
- me ,
Pie r )
- Constr
uc tion Impac ts
SLIDE 7
PROJE CT SITE
SLIDE 8
PUBLIC PROCE SS
- E
ar ly Public E ngage me nt
- Pie r
Boar d Me e tings (F e b. 6th, Apr . 15th & Aug. 19th)
- L
andmar ks Commission (Aug. 12th)
- Community Wor
kshop (June 18th)
40 par
tic ipants in four wor king gr
- ups
- Me e tings with Oc e an F
r
- nt Walk Busine ss and
Pr
- pe r
ty Owne r s (Aug. 8th)
- Disability Commission (Nov. 4th)
- Se nior
s Commission (Nov. 20th)
SLIDE 9
PUBLIC PROCE SS (cont.)
- Soc ial Me dia
- www.smc onstr
uc ts.or g/ smpie r br idge
- www.F
ac e book.c om/ SMConstr uc ts
- T
witte r : www.twitte r .c om/ SMConstr uc ts
TM SLIDE 10
PUBLIC PROCE SS (cont.)
- Public Outr
e ac h R e sults
- Disc usse d four
alte r native s
- Public R
e c omme nde d:
Alte r
native 1
– Dir
e c t ac c e ss to Pie r
– Pr
- vide s base line func tionality
Alte r
native 4
– Se par
ate s tr ave l mode s (pe de str ians/ bike s/ ve hic le s)
– R
e c e ive d br
- ad suppor
t by the public , Pie r Boar d, Polic e De par tme nt, and F ir e De par tme nt
SLIDE 11
PUBLIC PROCE SS (cont.)
- Spe c ial Me e ting w/ Oc e an F
r
- nt Walk
T e nants (Nov 21st)
- 13 par
tic ipants
- R
e sults:
Oppose Moss Ave nue Ac c e ss Str
uc tur e (T e mpor ar y
- r
Pe r mane nt)
R
e c omme nd F ur the r Study of Pie r Ac c e ss Alte r native s suc h as T e mpor ar y R amp fr
- m 1550 L
- t
- n Nor
th Side of Pie r
SLIDE 12
CONCE PTS
- Alte rna tive s
FROM ORIGINAL 70% WIDER THAN EXISTING
ALTERNATIVE 1 REPLACE IN KIND ALTERNATIVE 4 NEW BRIDGE + EMERGENCY / ADA / BIKE
SLIDE 13
CONCE PTS – Alternative 1 A – Temporary Moss Avenue Bridge
FROM ORIGINAL
Moss Ave Temp Bridge
70% WIDER THAN EXISTING
SLIDE 14
CONCE PTS – Alternative 1 B – Temporary Ramp North Side of Pier
SLIDE 15
Pier Bridge Perspective – Alternative 1
Preliminary Concept
Appian Way Perspective
Parking Lot Perspective
SLIDE 16
CONCE PTS – Alternative 4
SLIDE 17
Pier Bridge Perspective – Alternative 4
Preliminary Concept
Appian Way Perspective
Parking Lot Perspective
SLIDE 18
NE XT STE PS
- Pr
e liminar y E ngine e r ing to r e fine Alte r native s
- Comple te CE
QA and NE PA e nvir
- nme ntal
doc ume nts, 18-24 months
- De te r
mine L
- c ally Pr
e fe r r e d Alte r native
SLIDE 19
CITY COUNCIL ACTION
- Staff r
e c omme nds that the City Counc il:
- R
e vie w and c omme nt on the pr
- pose d
c onc e ptual alte r native s for the Pie r Br idge R e plac e me nt Pr
- je c t (the Pr
- je c t)
- Dir
e c t staff to move for war d with the NE PA and CE QA e nvir
- nme ntal r
e vie w phase of the Pr
- je c t c onside r
ing the pr
- pose d c onc e ptual