SANT A MONICA PIE R BRIDGE RE PL ACE ME NT PROJE CT Dr aft - PowerPoint PPT Presentation

SANT A MONICA PIE R BRIDGE RE PL ACE ME NT PROJE CT Dr aft E nvir onme ntal Impac t Re por t (E IR)/ E nvir onme ntal Asse ssme nt (E A) and Se c tion 4(f) E valuation Public Sc oping Me e ting AGENDA Project Overview and


  1. SANT A MONICA PIE R BRIDGE RE PL ACE ME NT PROJE CT Dr aft E nvir onme ntal Impac t Re por t (E IR)/ E nvir onme ntal Asse ssme nt (E A) and Se c tion 4(f) E valuation Public Sc oping Me e ting

  2. AGENDA  Project Overview and Alternatives  CEQA Overview  EIR Process  Resource Areas to be Studied

  3. PURPOSE OF PROJECT  Replace Structurally Deficient and Functional Obsolete Vehicular Bridge  Design Bridge for Vehicular/Seismic Loading  Improve Public Safety

  4. PROJECT SITE CAROUSS SSEL EL PARK RK

  5. ALTERNATIVES  Alternative 1: One Bridge  One 58’ Wide Bridge With All Travel Modes (vehicles, bicycles and pedestrians)  Temporary vehicular bridge at Moss Avenue during construction for vehicular access  Temporary pedestrian bridge connecting Ocean Avenue to the Pier at the north or south side of the existing bridge.  Alternative 2: One Bridge  One 58’ Wide Bridge With All Travel Modes (vehicles, bicycles and pedestrians)  Temporary vehicular ramp at 1550 Parking Lot during construction for vehicular access  Temporary pedestrian bridge connecting Ocean Avenue to the Pier at the north or south side of the existing bridge.  Alternative 3: Two Bridges  One – 34’ Wide Bridge for mainly Pedestrian and Bicycle, with emergency vehicle/ limited access at the existing location, including a path in compliance with Americans with Disabilities Act (ADA)  One New Permanent Bridge at Moss Avenue for main vehicle access to the Pier and Parking  Temporary pedestrian bridge connecting Ocean Avenue to the Pier at the north or south side of the existing bridge.

  6. ALTERNATIVE 1 Moss Ave Temp Bridge

  7. ALTERNATIVE 2

  8. ALTERNATIVE 3

  9. ENVIRONMENTAL PROCESS NOP Filing Date: December 11, 2014 CEQA LEAD AGENCY: City of SANTA MONICA NEPA LEAD AGENCY: CALTRANS PURPOSE OF NOTICE OF PREPARATION • Announce that an EIR/EA has been initiated • Describe the proposed project • Provide information on known or likely environmental effects of the project • Start Scoping Process PURPOSE OF SCOPING PERIOD • Obtain agency and public input on scope and content of the EIR/EA • Identify range of actions, alternatives, mitigation measures, and significant effects to be analyzed in the EIR/EA • Identify potential issues early in the environmental review process

  10. THE ENVIRONMENTAL IMPACT REPORT (EIR)/ ENVIRONMENTAL ASSESSMENT (EA) & SECTION 4(f) PROCESS PREPARE& PREPARE & CIRCULATE CIRCULATE CITY & CITY & CALTRANS CALTRANS REVIEWS REVIEWS

  11. • Aesthetics / Visual • Public Services • Air Quality • Recreation • Construction Impacts • Paleontology • Cultural Resources • Transportation, Traffic and • Economic and Social Impacts Circulation • Geology / Soils • Utilities / Service Systems • Greenhouse Gas Emissions • Mandatory Findings of Significance • Neighborhood Effects • Section 4(f) Evaluation • Community Impacts • Energy • Hydrology / Water Quality • Biological Environment • Land Use / Planning • Cumulative Impacts • Hazards and Hazardous Materials • Growth • Noise

  12. ONLINE INFORMATION  www.smgov.net/smpierbridge  www.smconstructs.org/smpierbridge  www.Facebook.com/SMConstructs  Twitter: www.twitter.com/SMConstructs

  13. Deadline for comments in writing, by 5:30 p.m. on February 2, 2015 Selim Eren, P.E., Civil Engineer City of Santa Monica Civil Engineering Division 1437 4th Street, Suite 300, Santa Monica, CA 90401 e-mail: selim.eren@smgov.net

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.