Reconstruction of the Pell Bridge Accent image here Approaches Public Workshop #2 July 16, 2018 Primary Image here Agenda Project Purpose and Need Environmental Assessment (EA) Process Public Meeting #1 Survey Input


slide-1
SLIDE 1

Accent image here Primary Image here

Reconstruction of the Pell Bridge Approaches

Public Workshop #2 July 16, 2018

slide-2
SLIDE 2

Agenda

  • Project Purpose and Need
  • Environmental Assessment (EA) Process
  • Public Meeting #1 Survey – Input Summary
  • Project Components
  • Overview of Alternatives
  • Public Input
  • Project Website
  • Next Steps
  • Open House
slide-3
SLIDE 3

Project Purpose and Need

3

  • Project Purpose
  • Improve safety and connectivity for all road users, including

pedestrians, bicyclists, and vehicles

  • Create parcels for development
  • Project Need
  • Reduce vehicular congestion and queuing on Pell Bridge
  • Improve connectivity between Newport’s North End and

Downtown areas for all road users

  • Spur economic development
slide-4
SLIDE 4

Environmental Assessment (EA) Process and Schedule

4

slide-5
SLIDE 5

Public Meeting #1 Survey Results

5

  • Over 70 comments received. Majority of topics focused on:
  • Bike Facilities
  • Pedestrian Connectivity (Especially to North End)
  • Third Street Used as a Cut-Thru
  • Local Business Impact
  • Traffic Congestion/Ramps Queuing onto Bridge
  • Drainage/Flooding
  • Developable Land
slide-6
SLIDE 6

Project Components

6

  • Consolidate and remove existing

highway infrastructure

  • Reconnect JT Connell Highway
  • Provide connectivity between

JT Connell Highway and Third Street

  • Provide multi-modal connectivity

between North End and and Gateway Center

  • Provide park & ride and transit
  • pportunity between Pell Bridge

Interchange and Gateway Center

slide-7
SLIDE 7

Project Study Area

7

slide-8
SLIDE 8

Project Elements

8

  • JT Connell Highway Resurfacing
  • Pedestrian/Bicycle Connectivity
  • Future Shuttle Service along Newport Secondary
  • Admiral Kalbfus Road Safety Improvements
  • Interchange Area Realignment
  • Alternative 1: Maintain Freeway/Interchange
  • Alternative 2: Partial Interchange/Local Street Network
  • Alternatives 3A-B-C: Local Street Network
  • Alternatives 4A-B: Local Street Network
slide-9
SLIDE 9

JT Connell Highway Resurfacing

9

Resurface JT Connell/ Coddington Highway

slide-10
SLIDE 10

Pedestrian/Bicycle Connectivity

10

Provide Shared Use Path along Newport Secondary to Admiral Kalbfus Road Connectivity to Gateway Center Provide Shared Use Path along Admiral Kalbfus Road Provide Sidewalks /Shared Use Path along JT Connell

slide-11
SLIDE 11

Future Shuttle Service along Newport Secondary

11

Provide Park and Ride Provide Platform for Future Shuttle Service

slide-12
SLIDE 12

Admiral Kalbfus Road Safety Improvements

12

Upgrade 3rd Street Signal Install Signal at Malbone Road/Girard Ave Convert Rotary to Modern Roundabout

slide-13
SLIDE 13

Interchange Area – Alternative 1

13

Replace Downtown Ramp with Flyover Ramp Maintain Freeway Reconnect JT Connell Highway

slide-14
SLIDE 14

Interchange Area – Alternative 2

14

Replace Downtown Ramp with Flyover Ramp Reconnect JT Connell Highway Provide Additional Local Street Connections Remove Freeway

slide-15
SLIDE 15

Interchange Area – Alternative 3

15

Provide Additional Local Street Connections Remove Freeway 3 Options for Downtown Ramp Provide Connection to Park & Ride Provide Connection to 3rd Street

slide-16
SLIDE 16

Interchange Area – Alternative 3A

16

Provide Ramp to Downtown via Newport Secondary Convert Farewell Street to One-Way Northbound

slide-17
SLIDE 17

Interchange Area – Alternative 3B

17

Restrict Access from Van Zandt Ave Westbound Eliminate Access from Van Zandt Ave Eastbound Maintain Ramp

slide-18
SLIDE 18

Interchange Area – Alternative 3C

18

Remove Ramp

slide-19
SLIDE 19

Interchange Area – Alternative 4A

19

Provide Connection to Park & Ride Provide Additional Local Street Connections Remove Freeway Remove Ramp

slide-20
SLIDE 20

Interchange Area – Alternative 4B

20

Provide Connection to Park & Ride Provide Additional Local Street Connections Remove Freeway Remove Ramp

slide-21
SLIDE 21

Alternatives Analysis for Discussion

  • Station 1 – Alternative 1
  • Station 2 – Alternative 2
  • Station 3 – Alternatives

3A, 3B, and 3C

  • Station 4 – Alternatives

4A and 4B

  • Each station has:
  • Graphic of Alternative
  • Project Constraints

and Benefits

21

slide-22
SLIDE 22

Public Input

22

  • Public input is critical at this stage of the project
  • Concerns/comments on alternatives for consideration
  • Input may be submitted:
  • In person tonight – see comment box
  • By mail – address provided on the comment form
  • Using the online portal – web link provided on the comment form
slide-23
SLIDE 23

Project Website

23

  • Project Updates
  • Meeting Materials/

Graphics/Reports

  • Link to Survey
  • www.pellbridge-ea.com
slide-24
SLIDE 24

Next Steps

24

  • Fall 2018/Early 2019
  • Submit Draft Environmental Assessment (EA) &

30% Design Plans for FHWA Review & Public Comment

  • Late Winter/Early Spring 2019
  • Submit Final Environmental Assessment
  • Summer 2019
  • FHWA issues determination
  • Winter 2019 thru 2023
  • Advertise Project/Construction