NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

1 December 2013

NEW YORK GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

December 18, 2013 Connecticut Street Armory, Buffalo, NY

Public Hearing

slide-2
SLIDE 2

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

2 December 2013

NEW YORK GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

December 18, 2013 Connecticut Street Armory, Buffalo, NY

Public Hearing

slide-3
SLIDE 3

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

3 December 2013

Technical Presentation

 Purpose, Need, and Objectives  Planned Improvements  NEPA Process  Anticipated Benefits  Environmental Studies  Right-of-Way

slide-4
SLIDE 4

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

4 December 2013

The purpose is to reduce the use of the local streets by interstate traffic and provide access to the existing Plaza at its current location.

The primary need of the project is to address the limited direct access between the Plaza and I-190

Purpose and Need

slide-5
SLIDE 5

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

5 December 2013

Project Objectives

To address the need for direct access from the Plaza to the northbound lanes

  • f Interstate 190.

To redirect through traffic from Front Park, and to remove Baird Drive. To replace the Porter Avenue Bridge

  • ver I-190
slide-6
SLIDE 6

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

6 December 2013

Major Project Improvements

Ramp D Ramp PN Shoreline Trail New Bridge

slide-7
SLIDE 7

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

7 December 2013

NEPA PROCESS

SCOPING =

  • Opportunity for public and agencies to

identify issues for consideration in the DEIS DEIS =

  • Evaluates reasonable alternatives
  • Assesses effects of the action
  • Identifies preferred alternative
  • Public Hearing

FEIS & ROD =

  • Consideration of comments received on

DEIS

  • Describes mitigation measures (as

necessary)

  • Provides basis for decision
slide-8
SLIDE 8

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

8 December 2013

NEPA PROCESS

Outcomes from Public and Agency Input: 1. Relocation of Shoreline Trail (Riverwalk)

  • Allows Expanded Waterfront Views of Niagara River and

Lake Erie 2. Replacement of Porter Avenue Bridge over I-190

  • Reduced Overall Construction Impacts on Public

3. Improvements to Security Around US Plaza

  • Construction of Perimeter Wall

4. Improvements to Traffic Incident Notification on I-190

  • New Variable Message Signs on Northbound I-190
slide-9
SLIDE 9

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

9 December 2013

NEPA PROCESS

Outcomes from Public and Agency Input: 5. Improved Porter Avenue Access to LaSalle Park

  • Share-Use Path Along South Side of Porter Ave

6. Improved Driver Directions for Exiting US Plaza

  • New Signage Directing Exiting Vehicles

7. Improved Vehicle and Pedestrian Access within Front Park

  • Relocated Driveway and Paths
slide-10
SLIDE 10

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

10 December 2013

NEPA PROCESS

DEIS PHASE – Public and Agency Review 1. DEIS is Available for Public Review at:

  • Buffalo and Erie County Public Library’s Niagara Branch and

Central, or Downtown Buffalo, Library

  • NYS Dept of Transportation’s Region 5 Offices at 100

Seneca Street in Buffalo

  • Online at https://www.dot.ny.gov/nygateway
  • During today’s Public Hearing at the Written Comment Table
slide-11
SLIDE 11

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

11 December 2013

NEPA PROCESS

DEIS PHASE – Public and Agency Review 1. DEIS Comment Period:

  • Verbal comments received today
  • Written comments accepted through January 13, 2014

either by E-Mail or by US Mail 2. Comment Responses:

  • Comments received will be considered and responses will be

documented in the Final EIS

slide-12
SLIDE 12

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

12 December 2013

Benefits of Removing Baird Drive

slide-13
SLIDE 13

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

13 December 2013

Benefits of Removing Baird Drive

4.5 Acres

slide-14
SLIDE 14

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

14 December 2013

Benefits of Building Ramp D

slide-15
SLIDE 15

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

15 December 2013

Benefits of Improved Ped/Bike Facilities

slide-16
SLIDE 16

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

16 December 2013

Benefits of Replacing Porter Avenue Bridge

Narrow Lanes and Shoulder

slide-17
SLIDE 17

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

17 December 2013

Benefits of Relocation of the Shoreline Trail (Riverwalk)

slide-18
SLIDE 18

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

18 December 2013

Environmental Studies

Coastal Zone Consistency Determination Stormwater Management Social Effects Historic Properties Archaeological Resources Parks and Recreation Areas Visual Resources Air Quality Energy and Greenhouse Gas Emissions Noise Hazardous Waste and Contaminated Materials Construction Effects Indirect and Secondary Effects Cumulative Effects Environmental studies included:

slide-19
SLIDE 19

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

19 December 2013

Environmental Studies and Results

slide-20
SLIDE 20

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

20 December 2013

  • No residential or commercial

relocations required

  • 3 Public Agencies
  • CSX Railroad
  • 1 Private Owner

Right-of-Way

Porter Ave. Fourth Street.

slide-21
SLIDE 21

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

21 December 2013

Right-of-Way

  • Contact each affected property owner
  • Deliver a copy of the acquisition map
  • Explain the project and the effect that it will have on the property
  • Provide a preliminary time table and information regarding the

Department's acquisition process

  • Order an appraisal
  • Inspection of the property
  • Appraisal reports
  • Direct damages
  • Indirect damages
slide-22
SLIDE 22

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

22 December 2013

Right-of-Way

  • Temporary easement
  • One-offer system
  • Full offer of compensation
  • Filing a map and notice of appropriation
  • Agreement is signed
  • Uniform Relocation Assistance and Real Property Acquisition Policies

Act of 1970

  • If you must move... We can help
  • Just compensation
slide-23
SLIDE 23

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

23 December 2013

NEW YORK GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

Visit us at: www.dot.ny.gov/nygateway Email: NYGATEWAY@DOT.NY.GOV

slide-24
SLIDE 24

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

24 December 2013

NEW YORK GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

Thank You

slide-25
SLIDE 25

NY GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

25 December 2013

NEW YORK GATEWAY CONNECTIONS IMPROVEMENT PROJECT TO THE US PEACE BRIDGE PLAZA

December 18, 2013 Connecticut Street Armory, Buffalo, NY

Public Hearing