p o r t m e t r o v a n c o u v e r.c o m
Meeting PMV Offices April 17, 2014
EAST VANCOUVER PORT LANDS COMMITTEE
1
EAST VANCOUVER PORT LANDS COMMITTEE Meeting PMV Offices April 17, - - PowerPoint PPT Presentation
EAST VANCOUVER PORT LANDS COMMITTEE Meeting PMV Offices April 17, 2014 p o r t m e t r o v a n c o u v e r.c o m 1 Updates/Upcoming Projects South Shore Corridor Project Prince Rupert Fisheries Coop Project Columbia Containers
p o r t m e t r o v a n c o u v e r.c o m
1
2
p o r t m e t r o v a n c o u v e r.c o m
3
p o r t m e t r o v a n c o u v e r.c o m
4
p o r t m e t r o v a n c o u v e r.c o m
5.0 Victoria Drive Pedestrian Overpass
5
p o r t m e t r o v a n c o u v e r.c o m
6.2 Milling and Paving 6.2 Installation of Concrete Barriers 6.2 Removal and Installation
6.1 Installation of Rail Crossing Hardware 6.4 Nanaimo Street Pedestrian Overpass Removal 6.3 Installation of Terminal Dock DMS
6
p o r t m e t r o v a n c o u v e r.c o m
6.5 Commissioner BC Hydro pole and overhead line relocation
7
p o r t m e t r o v a n c o u v e r.c o m
7.1 Fence post removal 7.5 Commissioner/McGill Intersection Roadwork 7.4 Commissioner Gate H-Bridge works 7.3 Commissioner/New Brighton Intersection Roadwork
8
p o r t m e t r o v a n c o u v e r.c o m
Figure 1 – example of a rail signal and gate structure to be installed at Rogers/Stewart and also at Victoria Drive (as part of Schedule item 2.1 and 5.7 respectively) Figure 2 – For reference,the blue lines are the northern signal and the red lines are the southern signal.
9
p o r t m e t r o v a n c o u v e r.c o m
10
11
12
13
p o r t m e t r o v a n c o u v e r.c o m
14
A - Trees and material
15
p o r t m e t r o v a n c o u v e r.c o m
16
p o r t m e t r o v a n c o u v e r.c o m
17