  1. US US US- US- -62 at I -62 at I 62 at I- 62 at I- -44 Interchange -44 Interchange 44 Interchange 44 Interchange Ram Ramp Im Ram Ramp Im p p p p Improvements Improvements p p p p rovements rovements Stakeholder Meeting Stakeholder Meeting Stakeholder Meeting Stakeholder Meeting NW Rogers Ln./US-62 I-44 I-44 NE Rogers Ln. Oklahoma Department Oklahoma Department of Transportation of Transportation August 8, 2012

  2. Project Purpose and Information Project Purpose and Information Project Purpose and Information Project Purpose and Information � ODOT project to improve safety and interstate access. � Approximately 30,000 vehicles per day travel through the interchange. � Highway was built in the late 1970’s before designated as an interstate. o Update geometrics o Update geometrics � High accident rate at the east intersection. o Right turn only intersection to avoid o Right turn only intersection to avoid conflicting movements. � Constraints include railroad tracks to the Constraints include railroad tracks to the east, Ft. Sill airfield to the northwest, and neighborhood to the southwest.

  3. Ft. Sill 2 Gate 2 G t Post Rd. Existing Existing Existing Existing I-44 NW Rogers Ln./US-62 NE Rogers Ln. Existing Right-of-Way Indian Trail Rd.

  4. Ft. Sill 2 Gate 2 G t Post Rd. Proposed Proposed Proposed Proposed I-44 NW Rogers Ln./US-62 NE Rogers Ln. Existing Right-of-Way Indian Trail Rd.

  5. Proposed: Proposed: Proposed: Proposed: South Half South Half South Half South Half NW Rogers Ln./US-62 Ramp A Indian Trail Rd. Ramp C Ramp C Bridge A Ramp B NE Rogers Ln.

  6. Proposed: Proposed: Proposed: Proposed: North Half North Half North Half North Half NW Roger Post Rd Post Rd. rs Ln./US-62 Ft. Sill Ramp F Gate 2 I-44 Ramp D Ramp D Ramp E Bridge B NE Rogers Ln. NW Pioneer Blvd.

  7. Proposed: Rogers Lane Rogers Lane Rogers Lane Rogers Lane NW Pioneer Blvd. NW Rogers Ln./US-62 NE Rogers Ln. Proposed: Proposed: Proposed: NE Lawrie Tatum Rd.

  8. Existing Existing Existing Existing Eastbound On Eastbound On Eastbound On- Eastbound On- -Ramp -Ramp Ramp Ramp

  9. Proposed Proposed Proposed Proposed Eastbound On Eastbound On Eastbound On- Eastbound On- -Ramp -Ramp Ramp Ramp

  10. Existing Existing Existing Existing Northbound Off Northbound Off Northbound Off Northbound Off- -Ramp -Ramp Ramp Ramp

  11. Proposed Proposed Proposed Proposed Northbound Off Northbound Off Northbound Off Northbound Off- -Ramp -Ramp Ramp Ramp

  12. Construction Phasing Construction Phasing Construction Phasing Construction Phasing � Phased construction to disturb traffic as little as possible. p � Six construction phases currently p proposed. p � All ramp movements maintained except Northbound entrance ramp. p o Proposed detour route for 45 days. � Shoofly needed to align temporary Shoofly needed to align temporary intersection. o Use temporary signal with dual left turn.

  13. Construction Construction Phase 1 Phase 1 � Remove grass medians along Rogers Lane and pave level with driving lanes. � Construct SB exit ramp (Ramp F). C S ( ) NW Roge Ramp F Post Rd. Ft. Sill Gate 2 Gate 2 rs Ln./US-62 I-44 NE Rogers Ln.

  14. Construction Phase 2 Construction Phase 2 � Open Ramp F to traffic. � Set up detour along Indian Trail Road to Cache Road. � Close and remove existing SB exit ramp and SB entrance ramp. � Construct SB entrance ramp (Ramp A). p ( p ) NW Roge Ramp A Ramp F Post Rd. Ft. Sill Gate 2 Gate 2 rs Ln./US-62 I-44 NE Rogers Ln.

  15. Construction Construction Phase 3 Phase 3 � Open Ramp A to traffic. � Construction NB exit ramp (Ramp B) and a portion of NB entrance loop (Ramp C). ( C) NW Roge Ramp A Post Rd. Ft. Sill Gate 2 Gate 2 rs Ln./US-62 I-44 Ramp B Ramp C NE Rogers Ln.

  16. Construction Construction Phase 4 Phase 4 � Construct Shoofly on north side of Rogers Lane. � Open Ramp B and Shoofly to traffic. � Close and remove existing NB exit ramp. � Construct remaining portion of NB entrance loop (Ramp C). g p p ( p ) NW Roge Post Rd. Ft. Sill Gate 2 Gate 2 rs Ln./US-62 I-44 Ramp B Ramp C NE Rogers Ln.

  17. Construction Phase 5 Construction Phase 5 � Open Ramp C to traffic. � Close and remove Shoofly and existing NB entrance ramp. � Construction NB exit loop (Ramp D) and NB entrance ramp (Ramp E). NW Roge Post Rd. Ft. Sill Gate 2 Gate 2 rs Ln./US-62 I-44 Ramp C Ramp D NE Ramp E Ramp E Rogers Ln.

  18. Construction Phase 6 Construction Phase 6 � Open Ramp D and Ramp E to traffic. � Construct medians along center of Rogers Lane. � Construct median at intersection of Ramp B-C and Rogers Lane. NW Roge Post Rd. Ft. Sill Gate 2 Gate 2 rs Ln./US-62 I-44 Ramp B Ramp C Ramp D NE Ramp E Ramp E Rogers Ln.

  19. Interchange Ramp Interchange Ramp Closure and Closure and Proposed Detour Proposed Detour Proposed Detour Proposed Detour

  20. Questions Questions

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend