US US US- US- -62 at I -62 at I 62 at I- 62 at I- -44 Interchange -44 Interchange 44 Interchange 44 Interchange Ram Ramp Im Ram Ramp Im p p p p Improvements Improvements p p p p rovements rovements Stakeholder Meeting


slide-1
SLIDE 1

US US US- US-

  • 62 at I
  • 62 at I

62 at I- 62 at I-

  • 44 Interchange
  • 44 Interchange

44 Interchange 44 Interchange Ram Ramp Im Improvements rovements Ram Ramp Im Improvements rovements p p p p p p p p Stakeholder Meeting Stakeholder Meeting Stakeholder Meeting Stakeholder Meeting

NW Rogers Ln./US-62 I-44 I-44 NE Rogers Ln.

August 8, 2012

Oklahoma Department Oklahoma Department

  • f Transportation
  • f Transportation
slide-2
SLIDE 2

Project Purpose and Information Project Purpose and Information Project Purpose and Information Project Purpose and Information

ODOT project to improve safety and interstate access. Approximately 30,000 vehicles per day travel through the interchange. Highway was built in the late 1970’s before designated as an interstate.

  • Update geometrics
  • Update geometrics

High accident rate at the east intersection.

  • Right turn only intersection to avoid
  • Right turn only intersection to avoid

conflicting movements. Constraints include railroad tracks to the Constraints include railroad tracks to the east, Ft. Sill airfield to the northwest, and neighborhood to the southwest.

slide-3
SLIDE 3

Existing Existing Existing Existing

NW Rogers Ln./US-62 Post Rd.

  • Ft. Sill

G t 2 Indian Trail Rd. I-44 Gate 2 NE Rogers Ln. Existing Right-of-Way

slide-4
SLIDE 4

Proposed Proposed Proposed Proposed

NW Rogers Ln./US-62 Post Rd.

  • Ft. Sill

G t 2 Indian Trail Rd. I-44 Gate 2 NE Rogers Ln. Existing Right-of-Way

slide-5
SLIDE 5

Proposed: Proposed: Proposed: Proposed: South Half South Half South Half South Half

NW Rogers Ln./US-62

Ramp A

Indian Trail Rd.

Ramp C Bridge A Ramp B Ramp C

NE Rogers Ln.

slide-6
SLIDE 6

Proposed: Proposed: Proposed: Proposed: North Half North Half North Half North Half

Post Rd NW Roger Post Rd. rs Ln./US-62

  • Ft. Sill

Gate 2

Ramp F

I-44

Ramp D Bridge B Ramp D Ramp E

NE Rogers Ln. NW Pioneer Blvd.

slide-7
SLIDE 7

Proposed: Proposed: Proposed: Proposed: Rogers Lane Rogers Lane Rogers Lane Rogers Lane

NW Rogers Ln./US-62 NE Rogers Ln. NE Lawrie Tatum Rd. NW Pioneer Blvd.

slide-8
SLIDE 8

Eastbound On Eastbound On Eastbound On- Eastbound On-

  • Ramp
  • Ramp

Ramp Ramp Existing Existing Existing Existing

slide-9
SLIDE 9

Eastbound On Eastbound On Eastbound On- Eastbound On-

  • Ramp
  • Ramp

Ramp Ramp Proposed Proposed Proposed Proposed

slide-10
SLIDE 10

Northbound Off Northbound Off Northbound Off Northbound Off-

  • Ramp
  • Ramp

Ramp Ramp Existing Existing Existing Existing

slide-11
SLIDE 11

Northbound Off Northbound Off Northbound Off Northbound Off-

  • Ramp
  • Ramp

Ramp Ramp Proposed Proposed Proposed Proposed

slide-12
SLIDE 12

Construction Phasing Construction Phasing Construction Phasing Construction Phasing

Phased construction to disturb traffic as little as possible. p Six construction phases currently proposed. p p All ramp movements maintained except Northbound entrance ramp. p

  • Proposed detour route for 45 days.

Shoofly needed to align temporary Shoofly needed to align temporary intersection.

  • Use temporary signal with dual left turn.
slide-13
SLIDE 13

Construction Construction Phase 1 Phase 1

Remove grass medians along Rogers Lane and pave level with driving lanes. C S ( ) Construct SB exit ramp (Ramp F).

NW Roge Post Rd.

Ramp F

  • Ft. Sill

Gate 2 rs Ln./US-62 I-44 Gate 2 NE Rogers Ln.

slide-14
SLIDE 14

Construction Construction Phase 2 Phase 2

Open Ramp F to traffic. Set up detour along Indian Trail Road to Cache Road. Close and remove existing SB exit ramp and SB entrance ramp. Construct SB entrance ramp (Ramp A). p ( p )

Ramp F Ramp A

Post Rd. NW Roge

  • Ft. Sill

Gate 2 I-44 rs Ln./US-62 Gate 2 NE Rogers Ln.

slide-15
SLIDE 15

Construction Construction Phase 3 Phase 3

Open Ramp A to traffic. Construction NB exit ramp (Ramp B) and a portion of NB ( C) entrance loop (Ramp C).

Ramp A

Post Rd. NW Roge

  • Ft. Sill

Gate 2 I-44 rs Ln./US-62 Gate 2

Ramp B Ramp C

NE Rogers Ln.

slide-16
SLIDE 16

Construction Construction Phase 4 Phase 4

Construct Shoofly on north side of Rogers Lane. Open Ramp B and Shoofly to traffic. Close and remove existing NB exit ramp. Construct remaining portion of NB entrance loop (Ramp C). g p p ( p )

Post Rd. NW Roge

  • Ft. Sill

Gate 2 I-44 rs Ln./US-62 Gate 2

Ramp B Ramp C

NE Rogers Ln.

slide-17
SLIDE 17

Construction Construction Phase 5 Phase 5

Open Ramp C to traffic. Close and remove Shoofly and existing NB entrance ramp. Construction NB exit loop (Ramp D) and NB entrance ramp (Ramp E).

Post Rd. NW Roge

  • Ft. Sill

Gate 2 I-44 rs Ln./US-62 Gate 2

Ramp D Ramp E

NE

Ramp C Ramp E

Rogers Ln.

slide-18
SLIDE 18

Construction Construction Phase 6 Phase 6

Open Ramp D and Ramp E to traffic. Construct medians along center of Rogers Lane. Construct median at intersection of Ramp B-C and Rogers Lane.

Post Rd. NW Roge

  • Ft. Sill

Gate 2 I-44 rs Ln./US-62 Gate 2 NE

Ramp D Ramp E Ramp B Ramp C

Rogers Ln.

Ramp E

slide-19
SLIDE 19

Interchange Ramp Interchange Ramp Closure and Closure and Proposed Detour Proposed Detour Proposed Detour Proposed Detour

slide-20
SLIDE 20

Questions Questions