T CH Co rrido r Ma na g e me nt Pla n Ministry of T ra nsporta - - PowerPoint PPT Presentation

t ch co rrido r ma na g e me nt pla n
SMART_READER_LITE
LIVE PREVIEW

T CH Co rrido r Ma na g e me nt Pla n Ministry of T ra nsporta - - PowerPoint PPT Presentation

T CH Co rrido r Ma na g e me nt Pla n Ministry of T ra nsporta tion a nd Infra struc ture (MOT I) Munic ipa lity of North Cowic ha n City of Dunc a n Cowic ha n T ribe s L o c a l Busine ss Owne rs I nfo rma tio n Se ssio n 2:00 p.m.


slide-1
SLIDE 1

Ministry of T ra nsporta tion a nd Infra struc ture (MOT I) Munic ipa lity of North Cowic ha n City of Dunc a n Cowic ha n T ribe s

5 De c e mb e r 2013

T CH Co rrido r Ma na g e me nt Pla n

L

  • c a l Busine ss Owne rs I

nfo rma tio n Se ssio n

2:00 p.m. to 4:00 p.m. Me sa c hie Ro o m, I sla nd Sa ving s Ce ntre

slide-2
SLIDE 2

T

  • da y’ s Ag e nda – 2pm – 4pm

1 I

ntro duc tio ns

2 Pro je c t I

ntro duc tio n

3 Sc o pe Are a 4 Wra p up/ Ne xt Ste ps

slide-3
SLIDE 3

Introduc tions

1

slide-4
SLIDE 4

Pro je c t De live ry T e a m

  • Ministry o f T

ra nspo rta tio n a nd I nfra struc ture

  • Munic ipa lity o f No rth Co wic ha n
  • City o f Dunc a n
  • Co wic ha n T

rib e s

  • Sta nte c ( Pla nning / T

ra nspo rta tio n Co nsulta nt)

slide-5
SLIDE 5

T

  • da y’ s Ob je c tive s
  • I

ntro duc e the pro je c t a nd o b je c tive s

  • Ge t yo ur fe e db a c k a s lo c a l b usine ss
  • wne rs a s we e mb a rk o n de ve lo ping
  • ptio ns/ ide a s
  • Ne xt ste ps
slide-6
SLIDE 6

Proje c t Introduc tion

2

slide-7
SLIDE 7

Pro je c t Ba c kg ro und

  • Sig nific a nt a nd

va lua b le b o dy o f wo rk a lre a dy in pla c e .

  • Oppo rtunity to

inte g ra te with the

Unive rsity Villa g e L

  • c a l Are a Pla n

unde rwa y.

slide-8
SLIDE 8

Unive rsity Villa g e - L

  • c a l Are a Pla n

Focus Area Study Area City of Duncan District of North Cowichan Dike Location TCH (Detailed Masterplan) (Broader Land Use )

slide-9
SLIDE 9

Curre nt L AP Are a

Curre nt L AP Study Are a Curre nt L AP Study Are a E xte nde d Are a F

  • r T

CH Study Po rtio n Only E xte nde d Are a F

  • r T

CH Study Po rtio n Only

Boys Roa d Be ve rly Stre e t

Corona tion Ave nue

slide-10
SLIDE 10
  • Co o rdina te with the Unive rsity Villa g e L
  • c a l

Are a Pla n to ma ximize o ppo rtunitie s fo r a we ll-inte g ra te d a nd c o nne c te d c o mmunity

  • Ba c kg ro und re vie w – wha t's b e e n do ne ,

whe re a re the g a ps, whe re a re the

  • ppo rtunitie s
  • Cre a te a pla n tha t ide ntifie s via b le ne a r te rm

pro je c ts a s we ll a s lo ng te rms stra te g ie s

  • Co nsult with the a ppro pria te sta ke ho lde rs

Pro je c t Ob je c tive s

slide-11
SLIDE 11
  • I

mpro ve pub lic sa fe ty a lo ng the c o rrido r

  • I

mpro ve the stre e tsc a pe a nd a ttra c tive ne ss

  • f the c o rrido r
  • I

de ntify pe de stria n a nd c yc ling impro ve me nts

  • Ma na g e a c c e ss po ints to a nd fro m the T

CH

Pro je c t Ob je c tive s

slide-12
SLIDE 12

I nte g ra tio n with L AP Pha se s

L

  • c a l Are a Pla n Pha se

T CH Corridor

Pha se 1- Disc o ve r

Ba se line upda te s, re vie w o f pa st wo rk, o ppo rtunitie s a nd c o nstra ints

Pha se 2 – Co - Cre a te

Pre pa ra tio n o f 2 c o nc e pt o ptio ns la yo uts a nd c ro ss se c tio ns – info rming L AP Co nc e pt De ve lo pme nt

Inte g ra te d with Dra ft L AP

Pha se 3 - Re fine

Pre pa ra tio n o f pre fe rre d T CH Pla n inte g ra te d with pre fe rre d L AP

  • ptio n – F

ina l L AP

Pha se 4 - De live r

Ne a r te rm T CH pro je c ts ide ntifie d fo r imple me nta tio n Sha re d Co nsulta tio n Pro c e ss

slide-13
SLIDE 13

Clie nt Me e ting (s) Co wic ha n T rib e s L

  • c a l

Busine sse s Sta nte c Pro je c t te a m SAG Me e ting (s) Pub lic Ope n Ho use (s)

I nte g ra tio n with SAG Pro c e ss

T wo to T hre e re pre se nta tive c o rrido r lo c a l b usine ss o wne rs to jo in SAG

slide-14
SLIDE 14

No ve mb e r + De c e mb e r 2013 June 2013 L AP Pro c e ss Ja nua ry 2014 F e b rua ry 2014 Ma rc h 2014 April 2014 Ma y 2014

T CH Co rrido r Ma na g e me nt Pla n T CH Co rrido r Ma na g e me nt Pla n T CH Co rrido r Ma na g e me nt Pla n

SAG a nd Busine ss Owne rs Me e ting s De c e mb e r 5th 2013) Pub lic Ope n Ho use Ma rc h 2014 (F ina l L AP a nd F ina l T CH Co nc e pts ) Imple me nta tion F ina l T CH Pla ns E stima te d for la te Ma rc h 2014 Pub lic Ope n Ho use F e b rua ry 2014 (L AP Dra ft a nd T CH Optio ns)

Upda te d T ime line

T CH Co rrido r Co nc e pts pre se nte d with L AP

slide-15
SLIDE 15

De ta ile d T ime line

slide-16
SLIDE 16

Sc ope Are a

3

slide-17
SLIDE 17

Sc o pe Are a

slide-18
SLIDE 18

Oppo rtunitie s/ Co nstra ints

Gro up E xe rc ise -

  • Re vie w Ma p o f Study Are a
  • Pro vide Co mme nts o r I

de a s tha t yo u think sho uld b e a ddre sse d in this pro c e ss.

  • Are the re o ppo rtunitie s o r

c o nstra ints we sho uld think o f?

  • Re c o nve ne a t 3.15 pm a nd

pre se nt ide a s.

slide-19
SLIDE 19
slide-20
SLIDE 20
slide-21
SLIDE 21

Wra p up/ Ne xt Ste ps

4

  • De ve lo p Co nc e pts to b e inc lude d in o ve ra ll

pla nning wo rk

  • L
  • c a l Busine ss Re pre se nta tive s o n the Sta ke ho lde r

Adviso ry Gro up in pla c e .

  • SAG # 4 me e ting (Dra ft L

AP/ T CH Pla n) 24th Ja n 2014

  • Pub lic Ope n Ho use (Dra ft L

AP/ T CH Pla n) 12th F e b 2014