Engineering Utilities Master Plans (Stage 4)
Executive Committee June 11, 2018
Engineering Utilities Master Plans (Stage 4) Executive Committee - - PowerPoint PPT Presentation
Engineering Utilities Master Plans (Stage 4) Executive Committee June 11, 2018 AGENDA Overview Progress Engagement City Utilities Master Plans: o Drainage o City Sewer o City Water Questions/Comments? Organization Alignment
Executive Committee June 11, 2018
Vision and framework for growth to a population of 200,000
STAGE 1
Taste of Abby Canada Day Berry Beat Farmers Market Seven Oaks Mall Recreation Centres Kalgidhar Park and Temple Visit Chamber of Commerce Urban Development Institute
STAGE 2
U-District meeting MCA Open House Clearbrook Library High Street Mall Seven Oaks Mall
STAGE 3
Earth Day Clearbrook Library Farmers Markets UFV
Committees
Stage 1 – ADDIAC, DAC Stage 2 – ADDIAC, DAC Stage 3 – ADDIAC, DAC
Council
(Executive Committee)
Stage 1 – Oct. 2, 2017 Stage 2 – Feb. 19, 2018 Stage 3 – May 7, 2018
PHASEABLE, AFFORDABLE, RESILENT, SUSTAINABLE, INCREMENTAL, FLEXIBLE AND GRANTABLE
Erosion & Sediment Deposition
2
Localized Flooding
1
System Capacity & Pump Stations Runoff Volume& Quality Control
3 4
Low Dyke Level
5
Bylaws & Policy Updates Stormwater Fees & Charges
7 8
Climate Change/ Resiliency
6
DRAINAGE MASTER PLAN
BUILDING CAPACITY ENHANCE ENVIRONMENT SUSTAINABLE COMMUNITY RESILIENT SYSTEM
Sewer Odour Localized Flooding
1
System Capacity/ Pump Stations 3 Erosion/ Sediment Deposition Runoff Volume/ Quality Control Bylaws/ Policy Updates Low Dyke Level Stormwater Fees/ Charges
2 4 7 8 5
Climate Change/ Resiliency
6
DRAINAGE MASTER PLAN
Creek, etc.
DRAINAGE MASTER PLAN
sediment aggradation
control measures
DRAINAGE MASTER PLAN
2070-2011)
perspective, e.g.:
DRAINAGE MASTER PLAN
requirements of
drainage pump stations
a utility power failure
5 10 15 20 25 30 35 40 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043
Expenditures
Millions $ Dike Upgrade Planning Studies Pump Station Unstudied Area Studied Area Long Term $285 M Short Term $20 M Medium Term $145 M
Remaining Dyke Upgrade (2044-2050) $70 M Pump Station Backup Power Dyke Upgrade
upgrades to 2050
significant grants (e.g. 100% dyke improvements funding from senior levels of governments )
* Only if required
DRAINAGE MASTER PLAN
Dry vs Wet industry
1
Infrastructure Upgrades
2
Optimize sewer capacity & mitigate risks
3
Sewer Odour Corrosion of pipes and manholes
4 5
Upgrades
relocation
in Right of Ways Climate change & Sewer
6 7
Resiliency (Severe Storms/ Seismic)
8
CITY SEWER MASTER PLAN
BUILDING CAPACITY ASSET RENEWAL EMERGING ISSUES RESILIENT SYSTEM
Dry vs Wet industry Infrastructure Upgrades Optimize sewer capacity Climate change
1 7
Corrosion of pipes and manholes
2
Sewer Odour
4 3
Sewers in Right of Ways
6 5
Resiliency
8
CITY SEWER MASTER PLAN
infrastructure
CITY SEWER MASTER PLAN
renewal and growth related upgrades
CITY SEWER MASTER PLAN
challenging issues
bylaw
for reliable infrastructure
resilient systems
change
CITY SEWER MASTER PLAN
CITY SEWER MASTER PLAN
Stage 3
significant grants
CITY SEWER MASTER PLAN
Infrastructure Upgrades to Meet Future Demands Asset Renewal Program
2 1
Agricultural Water use
3
Dry vs Wet industry
4
Fire protection
5
Optimizing existing system
6
Resiliency of the Water Distribution System
7
CITY WATER MASTER PLAN
BUILDING CAPACITY ASSET RENEWAL OPTIMIZE SERVICE DELIVERY RESILIENT SYSTEM
Infrastructure Upgrades Asset Renewal
2 1
Agricultural Water use Dry vs Wet industry Fire protection
5 3 4
Optimizing system Resiliency
7
CITY WATER MASTER PLAN
6
Institutional (ICI) and Agricultural growth
available now and in the future
CITY WATER MASTER PLAN
Infrastructure (Pumps, PRV’s, and Reservoirs)
CITY WATER MASTER PLAN
Water and Sewer Commission (AMWSC) to promote water conservation
Stations
pressure zones
Development bylaw
CITY WATER MASTER PLAN
in the severe storm or seismic event CITY WATER MASTER PLAN
$5.0 M $10.0 M $15.0 M $20.0 M $25.0 M 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043
Expenditures ($Millions)
Seismic Upgrades (if required) Non Linear Upgrades Non linear Asset Renewal Studies New Pipe/Pipe Upgrades Linear Asset Renewal Linear Asset Renewal Upsized
McKee Pk Servicing $8.5M
Short Term $30M Medium Term $30 M Long Term $65 M
$25M $20M $15M $10M $5M
significant grants
* Only if required
CITY WATER MASTER PLAN