local planning panel 7 august 2019
play

Local Planning Panel 7 August 2019 375 Glebe Point Road, Glebe - PowerPoint PPT Presentation

Local Planning Panel 7 August 2019 375 Glebe Point Road, Glebe D/2018/1586 Applicant: Environa Studio Owner: Lawrence Luk Architect: Environa Studio proposal alterations and additions to heritage building including: extension,


  1. Local Planning Panel 7 August 2019 375 Glebe Point Road, Glebe D/2018/1586 Applicant: Environa Studio Owner: Lawrence Luk Architect: Environa Studio

  2. proposal alterations and additions to heritage building including: • extension, including excavation works, of the existing ground level small bar • internal alterations to the residential apartments • addition of rear balconies to apartments within levels 2 and 3 • addition of front and rear dormers for an additional level with access to rooftop terraces recommendation refusal

  3. notification information • exhibition period 9 January to 25 January 2019 • 60 owners and occupiers notified • 1 submission received 3

  4. submissions • privacy and noise impacts from the rooftop terraces • unsympathetic additions to a heritage item

  5. submissions subject site submitters

  6. site

  7. site site viewed from cnr of Glebe Point Road & Forsyth Street

  8. entrance to entrance to apartments small bar site viewed from Forsyth Street & entry points

  9. rear of site viewed from Forsyth Street

  10. site rear of subject site & adjoining heritage items

  11. Charlton Way street view looking south

  12. existing level 2 terrace looking east (common open space & waste storage)

  13. proposal perspective – 3D model

  14. perspective – 3D model

  15. proposal level 1

  16. level 2

  17. level 3

  18. level 4

  19. section plan

  20. materials – level 2 and 3 balconies balcony flooring in Modwood ‘silver gum’ clear glass balustrades aluminium sliding door in Dulux ‘monument’

  21. materials – dormers and rooftop terraces Lysaght metal cladding in aluminium sliding door in Colorbond ‘basalt’ Dulux ‘monument’ rooftop render planter boxes terrace flooring in Modwood ‘silver gum’

  22. compliance with key LEP development standards control existing proposed compliance height 9m 12.9m works up to no – 34% 12.1m variation floor space 1.5:1 1.7:1 2.06:1 no – 37% variation

  23. compliance with key DCP development standards control existing proposed compliance height in 2 3 4 no storeys

  24. issues • height • floor space • heritage • amenity

  25. height of building

  26. height of building • height non-compliance results from front and rear dormers, rooftop terraces and level 3 balcony • exacerbates existing height non-compliance • adverse impacts on the heritage item • clause 4.6 not supported

  27. height in storeys • New upper level and lower ground level addition results in 4 storeys • non compliance with 2 storey height in storeys DCP control 4 3 2 1

  28. floor space • floor space non-compliance results from the attic space and bar extension • exacerbates floor space non compliance • adds uncharacteristic features / bulk to heritage item • clause 4.6 not supported

  29. heritage • unsympathetic additions to a heritage item • untraditional dormers with aluminium framed doors • impact to side horizontal parapet wall • extensive glazing

  30. amenity - privacy • rooftop terraces and balconies create privacy and overlooking impacts • any further screening would add bulk

  31. amenity – waste management • existing communal waste storage removed • removal of communal residential waste storage, no clear path of travel to street for collection • commercial waste storage not demonstrated

  32. recommendation refusal

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.