SLIDE 1 NEW AUBURN RIVERWAY AND GREENWAY
Implementation lementation and d Phasing sing Presentati esentation
May 19, 2016
SLIDE 2 Introductions & Meeting Purpose Project Background and Considerations Presentation of Conceptual Design
- Phased Project Development Plans
Discussion Period
Meeting Agenda
SLIDE 3 Meeting Purpose
New Auburn Plans
SLIDE 4
Draft Purpose & Need Statement
Purpose: Improve the roadway, utility, pedestrian, and streetscape infrastructure and enhance and connect the public open spaces along the Little Androscoggin River to improve the quality of place, attract investment, increase property values and create a safe, attractive walkable urban village center.
SLIDE 5 Draft Purpose & Need Statement
Need: The existing project area lacks cohesiveness and is in a generally run down state. The streetscape is uninviting and the few remaining developed parcels face away from the river. The
- pen spaces along the river are not
connected and do not take advantage of the river’s scenic and recreational
SLIDE 6
Project Area and Approximate Project Limits
SLIDE 7
City Owned Parcels
SLIDE 8
SLIDE 9
SLIDE 10
City of Auburn Form Based Code Adopted 5/16/16
SLIDE 11
New Auburn Future Economic Development Potential
SLIDE 12
New Auburn Floodplain Considerations
SLIDE 13
New Auburn Floodplain Considerations
SLIDE 14 2016 –
- Build on past studies
- Confirm project vision through public input
- Develop an implementation program
- Confirm conceptual design through public process
- Complete final design(s)
- Provide Cost Estimates
- Complete construction Plans
SLIDE 15
Implementation / Phasing Plans
SLIDE 16
SLIDE 17
SLIDE 18
SLIDE 19
SLIDE 20
SLIDE 21
SLIDE 22
SLIDE 23
SLIDE 24
SLIDE 25
SLIDE 26
SLIDE 27
SLIDE 28
SLIDE 29
SLIDE 30
SLIDE 31
SLIDE 32
Please Share Your Thoughts with Us