REPUBLI C OF REPUBLI C OF SERBI A SERBI A CASE CASE PRESENTATI - - PowerPoint PPT Presentation
REPUBLI C OF REPUBLI C OF SERBI A SERBI A CASE CASE PRESENTATI - - PowerPoint PPT Presentation
REPUBLI C OF REPUBLI C OF SERBI A SERBI A CASE CASE PRESENTATI ON PRESENTATI ON ON ERW ON ERW I NTRODUCTI ON I NTRODUCTI ON CONVENTIONS AND PROTOCOLS RELATED TO CONVENTIONS AND PROTOCOLS RELATED TO WEAPONS: WEAPONS: Geneva Gas
CONVENTIONS AND PROTOCOLS RELATED TO CONVENTIONS AND PROTOCOLS RELATED TO WEAPONS: WEAPONS:
- Geneva Gas Protocol 1925
Geneva Gas Protocol 1925
- BWC 1972
BWC 1972
- CCW 1980
CCW 1980
- CCW Protocol I 1980
CCW Protocol I 1980
- CCW Protocol II 1980
CCW Protocol II 1980
- CCW Protocol III 1980
CCW Protocol III 1980
- CCW Protocol IV 1995
CCW Protocol IV 1995
- CCW
CCW Amdt Amdt 2001 2001
- CWC 1993
CWC 1993
- Ottawa Treaty 1997
Ottawa Treaty 1997
I NTRODUCTI ON I NTRODUCTI ON
CCW PROTOCOL V ON CCW PROTOCOL V ON EXPLOSI VE REMNANTS OF EXPLOSI VE REMNANTS OF WAR WAR
- Under ratification procedure
Under ratification procedure
I NTRODUCTI ON I NTRODUCTI ON
I NTRODUCTI ON I NTRODUCTI ON
Law on CCW Protocol V ratification goals:
Legal issues will be regulated Credibility of Republic of Serbia in international
community will be increased
Risks and threats of ERW will be decreased Possibility to use international funds will be
increased
Several Wars were waged in XX century: Several Wars were waged in XX century:
- The Balkan Wars
The Balkan Wars
- The First World War
The First World War
- The Second World War
The Second World War
- NATO intervention
NATO intervention
CONTAMI NATI ON CONTAMI NATI ON EXTENSI ON EXTENSI ON
- Great quantity of explosive remnants
Great quantity of explosive remnants
- f war (ERW)
- f war (ERW)
- Different construction, size, origin
Different construction, size, origin
- Unexploded cluster
Unexploded cluster bomblets bomblets and and aerial bombs aerial bombs
- Ammunition depots explosion
Ammunition depots explosion
CONTAMI NATI ON CONTAMI NATI ON EXTENSI ON EXTENSI ON
ERW ERW
- poses immediate threat for population
poses immediate threat for population and environment and environment
- slow down construction works
slow down construction works
- make impossible exploitation of
make impossible exploitation of cultivable land cultivable land
- may cause certain legal and political
may cause certain legal and political problems problems
CONTAMI NATI ON CONTAMI NATI ON EXTENSI ON EXTENSI ON
The extent of ERW contamination has The extent of ERW contamination has not been precisely determined yet not been precisely determined yet It is necessary to develop: It is necessary to develop:
- General Study of ERW contamination
General Study of ERW contamination
- Technical Study for each
Technical Study for each microlocation microlocation contaminated with ERW contaminated with ERW
CONTAMI NATI ON CONTAMI NATI ON EXTENSI ON EXTENSI ON
Based on type and period Based on type and period
- f occurrence as well as
- f occurrence as well as
the threat level we the threat level we divided ERW into the divided ERW into the following categories: following categories: CONTAMI NATI ON CONTAMI NATI ON EXTENSI ON EXTENSI ON
1. 1.
CLUSTER BOMBS CLUSTER BOMBS
- 30,000,000 square
30,000,000 square meters meters contaminated contaminated
- Several dozens of
Several dozens of civil and military civil and military micro locations micro locations
- General Survey of
General Survey of civil locations in civil locations in 2008 2008
CONTAMI NATI ON CONTAMI NATI ON EXTENSI ON EXTENSI ON
REPUBLIC OF SERBIA Cluster bombs location map
- After NATO bombing specialized Teams
After NATO bombing specialized Teams from SAF, Ministry of Interior and Ministry from SAF, Ministry of Interior and Ministry
- f
- f Defence
Defence removed and destroyed removed and destroyed unexploded cluster munitions from ground unexploded cluster munitions from ground surface on almost all contaminated locations surface on almost all contaminated locations
- NGO NPA has finished General Survey of
NGO NPA has finished General Survey of civil locations in 2008 and published the civil locations in 2008 and published the results results
- General Survey of military locations has not
General Survey of military locations has not been conducted yet been conducted yet
CONTAMI NATI ON CONTAMI NATI ON EXTENSI ON EXTENSI ON
2. 2.
AREIAL BOMBS AREIAL BOMBS AND PROJECTILS AND PROJECTILS
- Over 123
Over 123 unexploded aerial unexploded aerial bombs bombs
- Over 100 civil and
Over 100 civil and military locations military locations
- No survey has
No survey has been done been done
CONTAMI NATI ON CONTAMI NATI ON EXTENSI ON EXTENSI ON
REPUBLIC OF SERBIA Aerial bombs location map
- After NATO bombing specialized Teams
After NATO bombing specialized Teams from SAF and Ministry of from SAF and Ministry of Defence Defence dig, dig, deactivated, removed and destroyed over deactivated, removed and destroyed over than 120 unexploded bombs from NATO than 120 unexploded bombs from NATO bombing on 53 civil and military locations bombing on 53 civil and military locations
- Specialized Teams from Ministry of
Specialized Teams from Ministry of Defence Defence neutralized 19 aerial bombs from WWII neutralized 19 aerial bombs from WWII
CONTAMI NATI ON CONTAMI NATI ON EXTENSI ON EXTENSI ON
3. 3.
AMMUNITION AMMUNITION DEPOTS DEPOTS EXPLOSION EXPLOSION
- 23.000.000 square
23.000.000 square meters meters contaminated contaminated
- 12 locations
12 locations
CONTAMI NATI ON CONTAMI NATI ON EXTENSI ON EXTENSI ON
REPUBLIC OF SERBIA Ammo depots location map
- Specialized Teams from SAF and Ministry of
Specialized Teams from SAF and Ministry of Defence Defence removed and destroyed over removed and destroyed over 130.000 pieces of UXO so far 130.000 pieces of UXO so far
- In
In Paracin Paracin Municipality, after big explosion Municipality, after big explosion
- f ammo depot, specialized Teams from SAF
- f ammo depot, specialized Teams from SAF
cleaned ground surface and conducted cleaned ground surface and conducted underground searching on over than underground searching on over than 1.000.000 square meters 1.000.000 square meters
- Russian Agency
Russian Agency “ “EMERCOM EMERCOM” ” has started has started underground searching in April 2009 underground searching in April 2009
CONTAMI NATI ON CONTAMI NATI ON EXTENSI ON EXTENSI ON
4. 4.
COMBAT ACTIVITIES COMBAT ACTIVITIES IN WWI AND WWII IN WWI AND WWII
- Locations
Locations contaminated with contaminated with UXO and AXO from UXO and AXO from large combat large combat activities during WWI activities during WWI and WWII and WWII
- No survey has been
No survey has been done done
CONTAMI NATI ON CONTAMI NATI ON EXTENSI ON EXTENSI ON
REPUBLIC OF SERBIA Combat act. location map
5. 5.
WATER COURSES AND LAKES WATER COURSES AND LAKES
- Different categories of ERW from WWII and
Different categories of ERW from WWII and NATO bombing NATO bombing
- No General Survey has been done
No General Survey has been done
- In the Danube River 7 aerial bombs and
In the Danube River 7 aerial bombs and projectiles have been found after NATO bombing projectiles have been found after NATO bombing
- 6,000,000 EUR from European Agency for
6,000,000 EUR from European Agency for Reconstruction for Survey and neutralization of Reconstruction for Survey and neutralization of ERW on 12 locations in the Danube River ERW on 12 locations in the Danube River
CONTAMI NATI ON CONTAMI NATI ON EXTENSI ON EXTENSI ON
Responsibility for solving ERW problems lies Responsibility for solving ERW problems lies with Ministry of with Ministry of Defence
- Defence. The obligations by
. The obligations by law are fulfilled in cooperation with law are fulfilled in cooperation with following units of Ministry and the following units of Ministry and the institutions of Republic of Serbia: institutions of Republic of Serbia:
- MoD
MoD Department for Emergency Situations Department for Emergency Situations
- SAF
SAF
- Mine Action Centre
Mine Action Centre
- Domestic and foreign commercial companies
Domestic and foreign commercial companies
I NSTI TUTI ONAL I NSTI TUTI ONAL SET UP SET UP
All tasks related to ERW are being done All tasks related to ERW are being done under: under:
- Defence
Defence Act of the Republic of Serbia Act of the Republic of Serbia
- International Standards
International Standards
- Military Standards and Manuals
Military Standards and Manuals
I NSTI TUTI ONAL I NSTI TUTI ONAL SET UP SET UP
National Standards have not been National Standards have not been developed yet developed yet After the National Standards are After the National Standards are developed precise strategy, developed precise strategy, procedures and competences will be procedures and competences will be set up set up
I NSTI TUTI ONAL I NSTI TUTI ONAL SET UP SET UP
Operational capacities for ERW Operational capacities for ERW clearance: clearance:
- MoD
MoD specialized Teams specialized Teams
- SAF specialized Teams
SAF specialized Teams
- Commercial companies registered for
Commercial companies registered for humanitarian humanitarian demining demining
CLEREANCE CLEREANCE
Before the implementation of Before the implementation of ERW Projects it is necessary to ERW Projects it is necessary to develop an overall Study develop an overall Study
REQUEST FOR THE REQUEST FOR THE ANALYSI S OF NEEDS ANALYSI S OF NEEDS
- ERW Project is intended for clearing
ERW Project is intended for clearing the whole territory of the Republic of the whole territory of the Republic of Serbia from ERW Serbia from ERW
- Exact size of contaminated area is
Exact size of contaminated area is unknown unknown
- Exact number of ERW is unknown
Exact number of ERW is unknown
- General Survey has not been
General Survey has not been conducted on all locations conducted on all locations
REQUEST FOR THE REQUEST FOR THE ANALYSI S OF NEEDS ANALYSI S OF NEEDS
- The first stage
The first stage
– – Situation assessment Situation assessment – – General survey General survey – – Development of Project Development of Project documentation documentation
REQUEST FOR THE REQUEST FOR THE ANALYSI S OF NEEDS ANALYSI S OF NEEDS
- The second stage
The second stage
– – Clearance Clearance – – Destruction of ERW Destruction of ERW
REQUEST FOR THE REQUEST FOR THE ANALYSI S OF NEEDS ANALYSI S OF NEEDS
- Estimated cost of the ERW Project
Estimated cost of the ERW Project is is 70,000,000 EUR 70,000,000 EUR
- Technical assistance and capacity