January 18, 2017 1. Phase IC Overview 2. Budget and Cost Escalation - PowerPoint PPT Presentation

January 18, 2017 1. Phase IC Overview 2. Budget and Cost Escalation 3. Construction Phasing Plan 4. Timeline 5. Q&A 1. Phase IC Overview 2. Budget and Cost Escalation 3. Construction Phasing Plan 4. Timeline 5. Q&A Oyster Point


  1. January 18, 2017

  2. 1. Phase IC Overview 2. Budget and Cost Escalation 3. Construction Phasing Plan 4. Timeline 5. Q&A

  3. 1. Phase IC Overview 2. Budget and Cost Escalation 3. Construction Phasing Plan 4. Timeline 5. Q&A

  4. Oyster Point – Existing Conditions

  5. Oyster Point – Phase IC Phase IIC Cap Repair Yacht Club Boundary of Phase IC

  6. WHERE ARE WE SINCE 2011? − Focus on Implementing Phase I − Phase IC includes infrastructure and open space − Phase ID includes 508,000 SF of Office/R&D buildings − Project Ownership Transfer Completed − August 2016, Oyster Point Development (“OPD”) acquired the Oyster Point project from Shorenstein/SKS − Project Team Set Up − OPD has set up office and operation at Oyster Point − SKS retained as consultant, leveraging their knowledge and project continuity − Civil, environmental and geotechnical consultants are engaged − Regular Communication with City Staff − Ongoing weekly standing meeting with City Staff since July 2016 − Community Outreach − Outreach to all tenants at Oyster Point who will be impacted by Phase I

  7. 1. Phase IC Overview 2. Budget and Cost Escalation 3. Construction Phasing Plan 4. Timeline 5. Q&A

  8. 2011 Phase IC Cost Estimate: $ 29,875,095 Hard Costs from Hathaway Dinwiddie $ 5,395,019 Soft Cost (assumed 20% of Hard Cost) $ 35,610,113 Total Costs 2017 Phase IC Cost Estimate: $ 34,129,757 Hard Costs with escalation through Oct 2016 from Hathaway Dinwiddie $ 1,706,488 Additional escalation from Oct 2016 through construction contract $ 8,305,256 Soft Costs (fully developed budget includes design contingency*) $ 44,141,501 Total Costs *Fully developed soft cost budget = 23% of Hard Costs

  9. 2011 Phase IIC Cap Repair Cost Estimate: $ 476,972 Hard Costs from Hathaway Dinwiddie $ 95,394 Soft Cost (assumed 20% of Hard Cost) $ 572,366 Total Costs 2017 Phase IIC Cap Repair Cost Estimate: $ 708,985 Hard Costs with escalation through Oct 2016 from Hathaway Dinwiddie $ 42,486 Additional escalation to start of construction $ 140,741 Soft Costs $ 892,212 Total Costs

  10. 1. Phase IC Overview 2. Budget and Cost Escalation 3. Construction Phasing Plan 4. Timeline 5. Q&A

  11. Oyster Point – Phase I: Existing Conditions

  12. Red dashed line indicates overall construction site fencing at this phase.

  13. Oyster Point – Phase IC/ID at Completion Yacht Club

  14. 1. Phase IC Overview 2. Budget and Cost Escalation 3. Construction Phasing Plan 4. Timeline 5. Q&A

  15. Anticipated Timeline: 35% Design Drawings January 2017 65% Design Drawings June 2017 Landfill Agency Approvals August 2017 Demo/Grading Permits August 2017 Land Conveyance Closing August 2017 First DDA Payment to City August 2017 Start of Construction (Demo/Temp Roads) September 2017 95% and 100% Design Drawings October 2017 Completion of Phase IC End of 2018

  16. 1. Phase IC Overview 2. Budget and Cost Escalation 3. Construction Phasing Plan 4. Timeline 5. Q&A

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.