Update on: SCGA Hydrologic Data Management System Presented to: SCGA Board March 10, 2010 1 Outline Needs and Vision Current Status Data and Data Gaps Administrative Tools Public Tools Policy-Level Tools Technical-Level Tools Next


slide-1
SLIDE 1

1

Update on: SCGA Hydrologic Data Management System

Presented to: SCGA Board

March 10, 2010

slide-2
SLIDE 2

Outline

Needs and Vision Current Status

Data and Data Gaps Administrative Tools Public Tools Policy-Level Tools Technical-Level Tools

Next Steps

slide-3
SLIDE 3
slide-4
SLIDE 4

Needs and Vision

Consistent, common database Public outreach and education Easy access to data Analysis of data Streamline reporting/ BMO compliance

slide-5
SLIDE 5

Database

Compiling and quality control of data

Pumping (monthly)

Municipal Production Remediation Operations

Water levels Water quality Lithology data

Scanned Images Interpreted Well Logs

slide-6
SLIDE 6

Data Gaps

California DPH – X,Y location data for wells Local Purveyors – Production

CalAm Elk Grove Water Service Florin County Fruitridge Vista City of Sacramento

slide-7
SLIDE 7

Interfaces

7

User Access Quality Control

slide-8
SLIDE 8

Interfaces

8

User Access Quality Control

slide-9
SLIDE 9

Statewide Data

Interfaces

9

User Access Quality Control Statewide Data

slide-10
SLIDE 10

Interfaces

Technical Interface: GIS enabled for complex analysis purposes Administrative Interface: Intuitive for user management, data entry, and data validation Decision-Makers and Public Interfaces: Easy access to relevant data and analyses All relate to data from the common database

slide-11
SLIDE 11

SacIWRIS Architecture

slide-12
SLIDE 12

Technical Interface

ESRI ArcGIS-based interface

Create contours Polygon analysis Query tool Graphing tools

slide-13
SLIDE 13

Data Contour Tool

slide-14
SLIDE 14

Polygon Analysis Tool

slide-15
SLIDE 15

Time Series Graph

slide-16
SLIDE 16

Administrative Interface

Manage User Accounts and Permissions Enter and Upload data Validate data Publish data to Statewide IWRIS

slide-17
SLIDE 17

Administrator Home Page

slide-18
SLIDE 18

Manage User Accounts and Permissions

slide-19
SLIDE 19

Enter Data

slide-20
SLIDE 20

Validate Data

slide-21
SLIDE 21

Publish to Statewide IWRIS

slide-22
SLIDE 22

Decision-Maker and Public Interface

Statewide IWRIS Ease of Use, incorporation of statewide database, incorporation of local analysis uploaded by staff/consultants. Public access limited:

No well logs No production well locations No preliminary data or analysis

slide-23
SLIDE 23

Statewide IWRIS

slide-24
SLIDE 24

Statewide IWRIS

slide-25
SLIDE 25

Statewide IWRIS

slide-26
SLIDE 26

Project Status

Task Status Remaining Work

Lithology 60% Complete Visualization Tools. GW Quality 40% Complete Resolve DPH issues. QA/QC. GW Pumping Nearly Complete Additional purveyor data. QA/QC. GW Levels Nearly Complete Final QA/QC. DMS Data Update Nearly Complete Upload of final data. Tools Nearly Complete IWRIS/DWR interaction. Outreach 5% Complete Board presentation. Demos. Reporting 10% Complete Reports and User Manual. PM 75% Complete Ongoing.

slide-27
SLIDE 27

Project Status

Schedule: Extension filed for the end of 2010 Budget

$160,000 spent to-date $90,000 remaining

slide-28
SLIDE 28

Questions?

28