Tender Clarification Meeting for: Scaffolding Services Tender Number ERI/2020/TGS/03
Date: 18 February 2020
Tender Clarification Meeting for: Scaffolding Services Tender - - PowerPoint PPT Presentation
Tender Clarification Meeting for: Scaffolding Services Tender Number ERI/2020/TGS/03 Date: 18 February 2020 Housekeeping Rules Powering our world 18 February 2020 2 Key Topics and Presenters Purpose and introduction Commercial
Date: 18 February 2020
18 February 2020 2
18 February 2020 3
18 February 2020 4
Name: Romeo Mokwena Designation: Strategic Sourcing Officer Tel No: +27 11 629 8134 E- mail: MokwenRJ@eskom.co.za
18 February 2020 5
Updates & Clarifications: Tenderers are urged to continually check the Eskom Tender Bulletin and the National Treasury Website (e-Tender) for important updates pertaining the RFP in question i.e. minutes, notices, clarifications etc. Note: The RFP shall be submitted as 1 original pack plus 1 copy pack.(identical to the original). Failure to submit a copy will result in immediate disqualification. Note: Document must be clearly marked as original / copies Tenderers will not be permitted to provide the required copies after tender closing,
18 February 2020 6
Ref Number Description Closing date Closing time ERI/2020/TGS/03 Scaffolding Services 02 March 2020 10:00 AM
18 February 2020 7
+1) on 24 February 2020 (05 working days before the deadline for Proposal submission)
(no late submission/s will be accepted under any circumstances)
Tenders are to be delivered to the following address: Unit 5, Tender Office Heritage Office Park, Corner Hunslet Street and Lower Germiston Road, Rosherville, Johannesburg, Gauteng. CONFIDENTIAL ENQUIRY - Original / Copy 1 Attention: Romeo Mokwena Tender Number: ERI/2020/TGS/03 Description of Tender: PROVISION FOR SCAFFOLDING SERVICES TURBO GENERATOR SERVICES (TGS), WORKS AND SPARES LOGISTICS FOR THE DURATION OF 2 (TWO) YEARS USING THE NEC3 TERM SERVICE CONTRACT ON AN AS AND WHEN REQUIRED
8
Step 1 - Basic Compliance
Step 2 – Mandatory Tender Returnables
stipulated deadline will be disqualified.
18 February 2020 9
Step 3 - Functionality
the tenderer fails to obtain a minimum of 70% on technical, the tenderer will automatically fail the technical evaluation and cannot proceed to step 4. Step 4 - Price and Preference Analysis (PPPFA 80/20)
doc) and determine points for price;
fails to submit proof of B-BBEE status level the tenderer will not be disqualified but the tenderer may only score points out of 80 for price and scores 0 points out of 20 for B- BBEE.
18 February 2020 10
Step 5 – Objective Criteria
Step 6 – Negotiations where applicable
the highest scoring/highest ranked tenderer, in line with section (2) (1) (f) of the PPPFA, subject to the right to negotiate on the objective criteria with the three highest ranked tenderers respectively before award is made. Step 7 – Contract award
18 February 2020 11
The tender shall be submitted as follows:
It must be noted that a Supplier’s failure to provide the complete hard copy of the
means two sets of the tender needs to be submitted (the original and the copy of the tender)
18 February 2020 12
18 February 2020 13
logistics environment.
requirements during the refurbishment and preassembly process.
18 February 2020 14
It is estimated that the tenderers should have a CIDB contractor grading designation of 6 SL or higher for the contract to be awarded to them.
18 February 2020 15
18 February 2020 16
18 February 2020 17
18 February 2020 18
18 February 2020 19
18 February 2020 20
18 February 2020 21
OBJECTIVE CRITERIA – Local Content and Local-to-site beneficiation
development objective of previously disadvantaged persons in the environment of scaffolding services. It is against this background that Eskom reserves the right to award a contract to a supplier that commits to B-BBEE Improvement Plan or Retention, Skills Development and Job Creation in favour of beneficiaries residing within the Local Municipality where the service will be consumed as requested below, in line with Section 2 (1) (f) of the PPPFA.
18 February 2020 22
1.1. Supplier Development & Localisation Matrix The SD&L Matrix is not an evaluation criterion, however tenderers are encouraged to make proposals before they are eligible for award in line with Section 2 (1) (f) of the PPPFA.
TABLE 1: SUPPLIER DEVELOPMENT AND LOCALISATION COMPLIANCE MATRIX FOR SUPPLIERS AND CONTRACTORS Criteria Weight (%) Total Target (%)
Proposed Target (%)
Total Overall Weighted Score Local Content to South Africa 50.00% 100.00% Skills Development 50.00% Total Score 100.00% Total Supplier Development and Localisation Score
BBEE rating. Whereas Respondents will be allocated points in terms
also requests that Respondents submit B-BBEE improvement plan or retention.
they will maintain (only if the Respondent is a Level 1) or improve their B-BBEE status over the contract period. Respondents are requested to submit their B-BBEE Improvement Plan as an essential document with their bid.
18 February 2020 23
for growth in this industry and the industries annual contribution to skills development levies, the successful supplier is expected to develop skills through a university degree bursary minimum R300 000.00 per student for a qualification, at a registered and accredited South African university in favour of a student originating or residing within the Local Municipality where the service will be consumed. The number of bursaries will be linked to the value spent against the contract over a three year period.
criteria however as a condition for contract award, the successful supplier will offer a university degree bursary of at least R300 000 per qualification to assigned beneficiary at a registered and accredited South African university, for every R7 million invoiced of the cumulative contract amount.
18 February 2020 24
month of reaching or exceeding the R7 million threshold.
training programme to Eskom for approval as part of the implementation schedule, which sets out the following in detail:
development;
programme
18 February 2020 25
18 February 2020 26
financial years, or to the extent that such statements are not available, for the last year. Tenderers must note that in the case of a joint venture or special purpose vehicle (SPV) especially formed for this tender, audited financial statements for each participant in the JV / SPV is required. Start-up enterprises formed within the last 12 months are not required to send in statements, but if successful with their tender will be required to send statements for the first year when once available.
18 February 2020 27