SOVEREIGN-JEDA STRUCTURAL GROUTING
PERMANENTLY STOPPING LEAKS IN MRT TUNNELS
STRUCTURAL GROUTING PERMANENTLY STOPPING LEAKS IN MRT TUNNELS MRT - - PowerPoint PPT Presentation
SOVEREIGN-JEDA STRUCTURAL GROUTING PERMANENTLY STOPPING LEAKS IN MRT TUNNELS MRT Tunnel Walls & Floors (pressure grout) We permanently MRT Tunnel & Station Interface (pressure grout) seal leaks in Underground basements
PERMANENTLY STOPPING LEAKS IN MRT TUNNELS
WEST AUSTRALIA
ZAMBIA
NEW YORK, USA New York Metro (MRT) Tunnel Maintenance Waterproofing
SINGAPORE Structural Grouting
Fissure Grouting
RUSSIA
# PROJECT NAME PROJECT DESCRIPTION GROUT TYPE CONTRACT PERIOD CLIENT 1 LTA MCE C486 Marina Coastal Expressway MCE tunnel structure – sealing floor, wall and water tank structure Structural Grout Jan 3 – Aug 31, 2013 LTA 2 LTA MCE C485 Marina Coastal Expressway MCE tunnel concrete structure, floor, wall waterproofing works. Structural Grout May 3 – Sep 28, 2013 LTA 3 LTA MRT C156 North-South Line Extension MRT tunnel and station D-wall and Floor structural grout work. Structural Grout Feb – Dec 2013 LTA 4 LTA MRT C903 Bugis MRT Station MRT Tunnel D-wall structural waterproofing grout. Structural Grout Jul – Aug 2013 LTA 5 LTA C932A MRT Project MRT Tunnel D-wall structural waterproofing grout. Structural Grout Mar 5 – 31, 2014 LTA 6 Suntec City Mall B2 Car Park Office Building Basement Floor and Wall waterproof grout. Structural Grout Mar 4 – 21, 2015 Suntec City Mall 7 LTA MRT C935 MRT Station MRT Station platform ceiling Structural waterproof grout Structural Grout Nov 9 – 13, 2017 LTA
# PROJECT NAME PROJECT DESCRIPTION GROUT TYPE CONTRACT PERIOD CLIENT 1 SPPA (Singapore Power Asset Cable Tunnel Project) – EW2 Holland & Dunearn Shaft Successful rectification of water leaks in Holland Shaft Project. Previous attempts by other contractors to stop with cement grout failed. Rectification Fissure Grout (Kallang Formation) Oct – Dec, 2013 SPPA 2 SPPA (Singapore Power Asset Cable Tunnel Project) – NS2 Ang Mo Kio Successful rectification of waterproofing work (which was previously done by another contractor with micro cement grout but failed). Rectification Fissure Grout (Kallang Formation) Sep 23 – Nov 30, 2013 SPPA 3 PUB Sewer Div. – NS1 Woodlands T2119A Sewer Diversion Successful rectification of Hand Duck Cusion Shaft water leaks. Previous attempts by other contractors to stop with cement grout & sodium silicate failed. Staging Fissure Grout (Kallang Formation) April 1 – April 30, 2014 PUB 4 SPPA (Singapore Power Asset Cable Tunnel Project) – NS2 Tagore Shaft Singapore Power Cable Tunnel Project Shaft waterproofing project Fissure Grout (Bukit Timah Formation) Feb 24 – July 31, 2014 SPPA 5 SPPA (Singapore Power Asset Cable Tunnel Project) – JIPCT (JURONG FORMATION) Singapore Power Jurong Island & Pioneer Road Cable Tunnel Shafts Waterproofing. Total: 3 shafts Fissure Grout (Jurong Formation) Feb 14, 2014 – Jan 31, 2015 SPPA 6 SPPA (Singapore Power Asset Cable Tunnel Project) – NS2 Ang Mo Kia Shaft Fissure grouting works at Ang Mo Kio shaft tunnel interface to NS3 tunnel Fissure Grout (Bukit Timah Formation) Sep 12 – Dec 8, 2015 SPPA 7 SPPA (Singapore Power Asset Cable Tunnel Project Contract – EW2 Cable Tunnel (Holland Shaft) Fissure grouting works at Holland Shaft Rectification Shaft Waterproofing Fissure Grout (Kallang Formation) Nov 21 – Dec 7, 2015 SPPA
MARINA COASTAL EXPRESSWAY
3.6km twin 5 lane underground road tunnels Sovereign-Jeda sealed all leaking bored piles, D-wall construction joints, cracks and overhead build-in fire tanks, ventilation shafts and emergency access ways – floor, side walls and roof. All water sealing and grouting work were completed in 3 months using Sovereign's NOH20 grout.
MCE UNDERWATER TUNNEL
3.6km twin 5 lane under water road tunnels Sovereign-Jeda sealed all bored piles, construction joints, cracks and other subsea penetrations that caused flooding during construction. Grout sealing work using Sovereign's NOH20 grout, took only 4 months to complete.
NORTH-SOUTH LINE EXTENSION
1KM twin rail tunnels including Marina Bay underground station (300M long) located 40m from shoreline and 35M deep. Ground water leaked into the entire underground structure which was constructed in reclaimed land – floor, walls and
construction joints and cracks with Sovereign's NOH20 grout, prior to handing project over to LTA.
JALAN BESAR STATION
PU grout was unable to permanently stop leaks from the diaphragm wall through cracks in the concrete above the train tracks and platform into the housing containing the door mechanism, other electrical apparatus and wires If the leak is not permanently stopped, it may short-circuit the door mechanism or cause other issues that may result in disruption of train services Sovereign-Jeda permanently and completely stopped the leaks
Perth, Western Australia
New York, United States of America
7/11/2018