Southeast Boulevard Technical Planning Study Presentation to the Community December 11, 2014 Southeast Boulevard Planning Study C ommunity Presentation December 11, 2014 Existing Conditions Southeast Boulevard Planning Study C ommunity


  1. Southeast Boulevard Technical Planning Study Presentation to the Community December 11, 2014 Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  2. Existing Conditions Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  3. Today 2. View from L Street looking south 3. Residential and trees along L Street 1. View along L Street 6 8 3 1 2 4 5 4. View from L Street looking east 5. View from Barney Circle looking west 7 Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014 7. View from across the Anacostia River 6. View along Water Street looking west 8. Barney Circle

  4. Constraints Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  5. Opportunities Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  6. Where We Were Concept A2 – Grid Extended Concept A1 - Avenue Concept A3 – L as Boulevard Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  7. Where We Were Concept B2 - Parkway Concept B1 – Split Linear Park Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  8. Where We Were Concept C1 – Central Park Concept C2 – Linear Park Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  9. Concept A (largely based on A-1) Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  10. Concept A before development Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  11. Concept A (largely based on A-1) Land Uses • Extension of neighborhood fabric, street and block system • Moderate to medium density residential: multifamily and rowhouse • Small amount of ground-floor retail along 13 th and 15 th Streets • Potential future park at Boathouse Row • Potential future commercial or recreational building along M Street New Streets • 4 lane boulevard with bike lanes and on-street parallel parking • L Street becomes double-sided with on-street parallel parking • Extension of grid streets south to boulevard Connections to Waterfront • Pedestrian connections over CSX tracks at 13 th , 14 th , and 15 th Streets to Boathouse Row Bus/ Streetcar Parking • Potential for parking in deck under boulevard • Entry/ exit from 11 th and/or Barney Circle areas Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  12. Concept A view looking northeast Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  13. Concept A view looking southeast Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  14. Concept A view looking southwest Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  15. Concept A illustrative rendering Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  16. Concept B (largely based on A-2) Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  17. Concept B (largely based on A-2) Land Uses • Extension of neighborhood fabric, street and block system • Moderate to medium density residential: multifamily and rowhouse • Small amount of ground-floor retail along 13 th and 15 th Streets • Potential future park at Boathouse Row with Harbor Bath • Potential future commercial or recreational building along M Street New Streets • 2 lane streets with bike lanes and on-street parallel parking • L Street becomes double-sided with on-street parallel parking • Extension of grid streets south to new street Connections to Waterfront • Pedestrian connections over CSX tracks at 13 th , 14 th , and 15 th Streets to Boathouse Row Bus/ Streetcar Parking • None Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  18. Concept B view looking northeast Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  19. Concept B view looking southeast Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  20. Concept B view looking southwest Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  21. Concept B illustrative rendering Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  22. Concept C (largely based on C-1) Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  23. Concept C (largely based on C-1) Land Uses • Neighborhood park between Capitol Hill and CSX right-of-way • Potential future park at Boathouse Row • Potential future commercial or recreational building along M Street New Streets • 4 lane boulevard with bike lanes and on-street parallel parking • Boulevard Splits around park • Separated from L Street by tree-lined promenade • Extension of grid streets south to boulevard Connections to Waterfront • Pedestrian connections over CSX tracks at 13 th , 14 th , and 15 th Streets to Boathouse Row Bus/ Streetcar Parking • Potential for parking in deck under boulevard and park • Entry/ exit from 11 th and/or Barney Circle areas Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  24. Concept C view looking northeast Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  25. Concept C view looking southeast Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  26. Concept C view looking southwest Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  27. Concept C illustrative rendering Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  28. Discussion Concept A Concept C Concept B Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

  29. Next Steps Completion of Technical Report • DDOT-Led Feasibility Study • Southeast Boulevard Planning Study Presentation to the Community December 11, 2014 Southeast Boulevard Planning Study C ommunity Presentation – December 11, 2014

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.