F raming ham F ulle r Middle Sc ho o l Sc ho o l Building Co mmitte e January 6, 2020 F U L L E R S C H O O L , F R A M I N G H A M 12/ 20/ 19 T rade Co ntrac to r Bid Re sults Bids we re re c e ive d fro m the fo llo wing tra de s:


slide-1
SLIDE 1

F U L L E R S C H O O L , F R A M I N G H A M

F ulle r Middle Sc ho o l

Sc ho o l Building Co mmitte e January 6, 2020

F raming ham

slide-2
SLIDE 2

F U L L E R S C H O O L , F R A M I N G H A M

12/ 20/ 19 T rade Co ntrac to r Bid Re sults

Bids we re re c e ive d fro m the fo llo wing tra de s:

  • Ma so nry (5 bids)
  • Misc e llane o us Me ta ls

(6 bids)

  • Wa te rpro o fing ,

Da mppro o fing a nd Ca ulking (6 bids)

  • Ro o fing (7 bids)
  • Me ta l Windo ws (8 bids)
  • Gla ss a nd Gla zing (4 bids)
  • T

ile (6 bids)

  • Ac o ustic a l T

ile (3 bids)

  • Re silie nt F

lo o ring (5 bids)

  • Pa inting (7 bids)
  • E

le va to rs (1 bid)

  • F

ire Pro te c tio n (5 bids)

  • Plumbing (4 bids)
  • HVAC (8 bids)
  • E

le c tric a l (3 bids) Co mbine d to ta l o f bids re c e ive d is $2,510,450 be lo w the 90% CD e stima te fo r the se tra de s, no t inc luding E le va to r

slide-3
SLIDE 3

F U L L E R S C H O O L , F R A M I N G H A M

Bid Pac kag e 3 Summary o f Co sts

Masonry Fire Protection Plumbing HVAC Electrical Total Direct Costs Indirect Costs Total Cost 90% CD Estimate Variance (Under Budget) $2,821,000 $991,000 $2,093,000 $9,148,000 $5,555,000 $20,608,000 $3,418,770 $24,026,770 $24,028,636 $(1,867)

slide-4
SLIDE 4

F U L L E R S C H O O L , F R A M I N G H A M

Co nstruc tio n Update

slide-5
SLIDE 5

F U L L E R S C H O O L , F R A M I N G H A M

Co nstruc tio n Update