L OW CARBON E NE RGY SYST E M POL ICY Sta nding Co mmitte e - - PowerPoint PPT Presentation

l ow carbon e ne rgy syst e m pol icy
SMART_READER_LITE
LIVE PREVIEW

L OW CARBON E NE RGY SYST E M POL ICY Sta nding Co mmitte e - - PowerPoint PPT Presentation

L OW CARBON E NE RGY SYST E M POL ICY Sta nding Co mmitte e o n City F ina nc e a nd Se rvic e s No ve mb e r 15, 2017 Se a n Pa nde r, Gre e n Building Pro g ra m Ma na g e r Susta ina b ility Gro up, City o f Va nc o uve r ZE RO E


slide-1
SLIDE 1

L OW CARBON E NE RGY SYST E M POL ICY

Sta nding Co mmitte e o n City F ina nc e a nd Se rvic e s No ve mb e r 15, 2017 Se a n Pa nde r, Gre e n Building Pro g ra m Ma na g e r Susta ina b ility Gro up, City o f Va nc o uve r

slide-2
SLIDE 2

GOAL S:

  • Re al a nd dur

able GHG

re duc tio ns

  • He althy, c omfor

table , e ffic ie nt b uilding s

  • T

r ansfor m industr y to

ze ro e missio ns b uilding s

2

ZE RO E MISSIONS BUIL DING PL AN

slide-3
SLIDE 3

two pa thwa ys to re a l a nd re lia b le GHG re duc tio ns

ZE RO E MISSIONS BUIL DING PL AN

L

  • w Car

bon E ne r gy Syste m

  • GHG limit a c hie ve d

b y b a la nc ing e ffic ie nc y with lo w c a rb o n e ne rg y supply

  • E

na b le s use o f mo re a dva nc e d te c hno lo g ie s with pro fe ssio na l o pe ra to rs

High Pe r for manc e Buildings

  • GHG limit a c hie ve d b y

minimizing he a t lo ss thro ug h a nd e ne rg y use

  • E

na b le s simple he a ting syste m de sig n

3

slide-4
SLIDE 4

Suppo rts re q uire d inno va tio n

  • Builds lo c a l industry c a pa c ity a nd de ma nd fo r

a dva nc e d e ne rg y syste m te c hno lo g ie s suc h a s he a t pumps

  • T

he se te c hno lo g ie s will b e re q uire d to a c hie ve ze ro e missio ns b uilding s

  • Pro vide s inc re a se d fle xib ility in b uilding de sig n
  • Will he lp info rm the mo st c o st e ffe c tive b a la nc e

b e twe e n e ffic ie nc y a nd re ne wa b le s

4

L OW CARBON E NE RGY SYST E M POL ICY

slide-5
SLIDE 5

fo ur lo w c a rb o n syste m type s

  • 1. City-o wne d L

CE S

  • 2. Utility-o wne d On-site o r Distric t L

CE S

  • 3. Use r-o wne d L

CE S

  • 4. E

xisting Utility-o wne d Distric t E ne rg y Syste m

5

L OW CARBON E NE RGY SYST E M POL ICY

slide-6
SLIDE 6

6

L OW CARBON E NE RGY SYST E M POL ICY

fo ur lo w c a rb o n syste m type s

1. City- owne d L CE S (e .g. SE F C NE U)

  • Re al and r

e liable low c ar bon outc ome s ac hie ve d thr

  • ugh City c ontr
  • l and Counc il c ommitme nt
slide-7
SLIDE 7

7

L OW CARBON E NE RGY SYST E M POL ICY

fo ur lo w c a rb o n syste m type s

  • 2a. Utility- owne d On-site L

CE S (e .g. Mar ine Gate way he at pump syste m)

  • de sign ve r

ifie d to me e t GHG limits

  • Syste m pur

c hase d and ope r ate d by a qualifie d utility e nsur e s pr

  • pe r

c onstr uc tion, c ommissioning and pr

  • fe ssional ope r

ation

slide-8
SLIDE 8

8

L OW CARBON E NE RGY SYST E M POL ICY

fo ur lo w c a rb o n syste m type s

  • 2b. Utility- owne d Distr

ic t Sc ale L CE S (e .g. for a lar ge maste r planne d site )

  • F

e asibility study of syste m de sign c onfir ms it is c apable of me e ting de ve lopme nt’s GHG limit

  • BCUC appr
  • val e nsur

e s syste m is ve tte d by e xte r nal par tie s and pr

  • vide s r

e gulator y

  • ve r

sight

slide-9
SLIDE 9

9

L OW CARBON E NE RGY SYST E M POL ICY

fo ur lo w c a rb o n syste m type s

3. Use r

  • owne d On-Site L

CE S (e .g. MC2)

  • De sign ve r

ifie d as me e ting e ve n highe r GHG pe r for manc e r e quir e me nts

  • Size of fossil fue l syste ms limite d to me e t only

pe ak loads (c olde st days)

  • E

xte nde d war r antie s and funde d optimization and mainte nanc e c ontr ac ts e nsur e syste m func tions as de signe d

slide-10
SLIDE 10

10

L OW CARBON E NE RGY SYST E M POL ICY

fo ur lo w c a rb o n syste m type s

4. E xisting Utility- Owne d Distr ic t E ne r gy Syste ms (e .g. Cr e ative E ne r gy or Rive r Distr ic t E ne r gy)

  • Utility c ommits to low- c ar

bon plant or c onne c tion whe n fe asible

  • Utility de monstr

ate s on- going pr

  • gr

e ss towar ds low- c ar bon plant or c onne c tion

  • Utility c ommits to pr
  • viding inte r

im low- c ar bon e ne r gy (e .g. r e ne wable natur al gas)

slide-11
SLIDE 11
  • Upda te po lic ie s a nd pla ns to e limina te ma nda to ry

c o nne c tivity re q uire me nts fo r ne w de ve lo pme nts, e xc e pt:

  • a re a s se rve d b y City-o wne d syste ms o r unde r study

fo r syste m e xpa nsio n; a nd,

  • E

a st F ra se r L a nds (ODP unde r re vie w)

  • Sta ff will a pply ne w po lic ie s if c urre ntly in-de ve lo pme nt

pro je c ts c a n de mo nstra te e q uiva le nt GHG o utc o me

11

NE U c o nne c tivity re q uire me nts

L OW CARBON E NE RGY SYST E M POL ICY

slide-12
SLIDE 12

F

  • ur re c o mme nda tio ns

A) Appro ve L CE S Po lic y B) Re vie w a nd re po rt b a c k in 2 ye a rs C) Re mo ve NE U c o nne c tivity re q uire me nts fo r ne w de ve lo pme nts, e xc e pt a re a s se rve d b y a City-o wne d syste m D) Re mo ve c o nne c tivity re q uire me nts fo r in-pro g re ss de ve lo pme nts (e xc e pt a re a s se rve d b y a City-o wne d syste m) if e q uiva le nt o utc o me s a c hie ve d

12

L OW CARBON E NE RGY SYST E M POL ICY

slide-13
SLIDE 13

QUE ST IONS

13