The CNGS Horns The CNGS Horns Elect rical Syst ems Elect rical - - PowerPoint PPT Presentation

the cngs horns the cngs horns elect rical syst ems elect
SMART_READER_LITE
LIVE PREVIEW

The CNGS Horns The CNGS Horns Elect rical Syst ems Elect rical - - PowerPoint PPT Presentation

The CNGS Horns The CNGS Horns Elect rical Syst ems Elect rical Syst ems 4t h workshop on Neut rino Beams and I nst rument at ion 7 11 November 2003 at KEK Gilles. Maire Maire EP/ TA3 EP/ TA3 Gilles. 1 Out line Out line I nt


slide-1
SLIDE 1

The CNGS Horns The CNGS Horns Elect rical Syst ems Elect rical Syst ems

4t h workshop on Neut rino Beams and I nst rument at ion 7 – 11 November 2003 at KEK

Gilles.

  • Gilles. Maire

Maire EP/ TA3 EP/ TA3

1

slide-2
SLIDE 2

Out line Out line

I nt roduct ion. Elect rical Circuit . Component s and St at us. Test of inner conduct or Horn. Cont rols. Planning. Conclusions.

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 2

slide-3
SLIDE 3
  • 7 m long (approx.)
  • 1.6 tonne (approx.)

Sandry Wallon IN2P3

50ms

t I

Every 6s

I nt roduct ion Horn and Ref lect or (Load) I nt roduct ion Horn and Ref lect or (Load)

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 3

slide-4
SLIDE 4

I nt roduct ion I nt roduct ion General View General View

Horn and Ref lect or I n Target Chamber Charging Power Supply in surf ace Power cables (~1000m) along Access Galleries Pulse Transf ormer I n Service Gallery St rip Lines f rom Transf ormers t o Horn & Ref lect or

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 4

slide-5
SLIDE 5

I nt roduct ion I nt roduct ion Paramet ers Paramet ers

70 70 l/min Water flow for delta T= 5C 1,2 1,2 bar Pressure 16,5 26 kW Total power dissipated (with beam) 10,5 16 kW Mean power dissipated by current

  • nly (2 pulses)

150 280 V Load max. voltage 2 X 80 = 160 2 X 119 = 238 kJ Total stored energy 6300 7700 V Charging voltage 10 7,5 ms Pulse duration 4080 4080 µF Total capacitance for one pulse 495 328 mΩ Total resistance with 4 cables 0,21 X 32 X 32 = 215 0,6 X 16 X 16 = 154 mΩ Load resistance 2046 1210 µH Total inductance with 4 cables 1,5 X 32 X 32 = 1540 2,7 X 16 X 16 = 691 µH Load inductance 5625 9375 A Primary current peak 32 16 Transformer ratio 180 150 kA Load Peak current REFLECTOR System HORN System Unit

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 5

slide-6
SLIDE 6

Elect rical Circuit Diagram

Pulse 1 Pulse 2 Delay 50ms Start Charging Stop Charging Thyristors Bridge TR Diodes Bridge Capa Capa Thyristors Discharge Thyristors Discharge Discharge Circuit 1 Discharge Circuit 2 Charging Unit 10kV - 20A Polarity Changer Earthing HORN TR Experimental Area Power Cables (~1000m)

I t

Elect rical Circuit Diagram

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 6

slide-7
SLIDE 7

Elect rical Circuit Elect rical Circuit WANF Recuperat ion or NEW ? WANF Recuperat ion or NEW ?

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 7

WANF Recuperation NEW Pulse Transformers NEW NEW Power Cables NEW NEW Discharge Switches NEW WANF Recuperation Capacitors WANF Recuperation NEW NEW WANF Recuperation NEW WANF Recuperation

  • Thy. Bridge

Power Supply

  • Transfo. LV/HV

Electronics NOW Beginning of Project

slide-8
SLIDE 8

Component s and St at us Component s and St at us Charging Power Supply Charging Power Supply

Need t o increase charging volt age t o 10kV.

  • Buy new t ransf ormer (LV/ HV), f irst delivery in J uly 2003 and

second f or J uly2004.

  • All ot her power component s can work at 10kV.

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 8

slide-9
SLIDE 9

Component s and St at us Component s and St at us Charging Power Supply Charging Power Supply

Elect ronic regulat ion and int erlocks.

  • Old and obsolet e regulat ion (25 years old). We had spare cards

but elect ronic component s didn’t exist on t he market .

  • The Power Group will t ake in charge t his inst allat ion af t er
  • commissioning. We will inst all a st andard elect ronics of t his
  • group. The st udy and inst allat ion will be done f or t he end of

2003.

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 9

slide-10
SLIDE 10

Component s and St at us Charging Power Supply

Old Elect ronic New Elect ronic

24U 6U

Component s and St at us Charging Power Supply

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 10

slide-11
SLIDE 11

Component s and St at us Component s and St at us Capacit ors Discharge Capacit ors Discharge

At t he beginning of Proj ect

  • We want ed t o reuse WANF capacit ors.
  • For saf et y and inf rast ruct ure const raint s, Saf et y Division of

Cern f orced t o us t o inst all t his equipment in a new building. The est imat e cost of t his new building was 650kCHF.

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE

Call f or Tender

  • Result of t he Call f or Tender was in J une 2003, AVX-TPC (FR).
  • Pre-Series in December 2003 and series in Sept ember 2004.

Now

  • Af t er new st udy, we will buy new capacit ors (self healing

t echnology) f or a cost of 200kCHF.

  • We will inst all equipment in an exist ing building.

11

slide-12
SLIDE 12

Component s and St at us Component s and St at us Capacit ors Discharge Capacit ors Discharge

102kg Weight L= 360mm W= 335mm H= 705mm Dimensions Rough polypropylene film metallized Dielectric system Rape seed oil: 344°C Ignition temperature of dielectric fluid 206 V/µm Dielectric Stress < 100 nH Capacitor inductance < 3.3 mΩ Serial resistance 2x107 pulses Life Time 6sec Repetition Rate 17kJ Energy 1300A Maximum Peak Current 50% Reverse Voltage 10000Vdc Operating Voltage 340µF + /-5% Capacitance

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 12

slide-13
SLIDE 13

Component s and St at us Component s and St at us Capacit ors Discharge Capacit ors Discharge

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 13

slide-14
SLIDE 14

Component s and St at us Component s and St at us Capacit ors Discharge Capacit ors Discharge

Rack wit h WANF capacit ors

WANF capacit ors

  • 36 racks wit h a t ot al of 360 capacit ors.

New capacit ors

  • 12 racks wit h a t ot al of 48 capacit ors.

Result s

  • Space saving. Number of racks divided

by 3.

  • I mport ant cost saving f or inf rast ruct ure

and cabling.

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 14

slide-15
SLIDE 15

Component s and St at us Component s and St at us Thyrist or Thyrist or Swit ches (20kV, 18kA) Swit ches (20kV, 18kA)

  • All Th. Swit ches needed

have been bought and delivered by ARCEL (FR).

  • 3 t hyrist ors in series,

sharing resist or, RC snubber and impulse t ransf ormer.

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 15

slide-16
SLIDE 16

Component s and St at us Component s and St at us Thyrist or Thyrist or Swit ches (20kV, 18kA) Swit ches (20kV, 18kA)

2 Th. Swit ches are already inst alled and t est ed inBA7.

  • 8,2kV, 170kA wit h rat io 32
  • 6,5kV, 150kA wit h rat io 10

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 16

slide-17
SLIDE 17

Component s and St at us Component s and St at us Power Cables Power Cables

I mport ant paramet ers f or t he choice of t he power cables.

  • Resist ance and induct ance cable must be much smaller t han load

impedance (Transf ormer, St rip Lines and Horn).

To minimize t he volt age drop in t he cable. Not t o increase t oo much t he durat ion of t he pulse.

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE

Our choice.

  • Four 18kV cables in parallel (each wit h 2 t wist ed 150 mm2 CU

conduct ors) will be inst alled per syst em.

  • For 4 cables in parallel, t he resist ance and induct ance (Nexans dat a

sheet ) will be : R = 100mΩ, L = 160 µH.

  • Measurement s have been perf ormed on t he exist ing WANF cables.

The impedance of t his cable was R = 110mΩ, L = 130µH.

17

slide-18
SLIDE 18

Component s and St at us Component s and St at us Pulse Transf ormers Pulse Transf ormers

At t he beginning of t he proj ect

  • We want ed t o buy 2 new t ransf ormers wit h rat io 14 f or an

est imat e cost of 580kCHF.

Now, reusing of WANF t ransf ormers

  • A t est program has been realized t o validat e t he reusing of t he

2 Tesla pulse t ransf ormers of WANF.

  • We can reuse t his t ransf ormers in rat ion 32 or 16 (special

coupling in t he secondary side.

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 18

slide-19
SLIDE 19

Component s and St at us Component s and St at us Pulse Transf ormers Pulse Transf ormers

Rat io 32

SL Current Primary Current

0.002 0.004 0.006 0.008 0.01 0.012

  • 100000
  • 50000

50000 100000 150000

Simulat ion

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 19

slide-20
SLIDE 20

Component s and St at us Component s and St at us Pulse Transf ormers Pulse Transf ormers

Rat io 16

Primary Current SL Current

0.001 0.002 0.003 0.004 0.005 0.006

  • 100000
  • 50000

50000 100000 150000

Simulat ion

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 20

slide-21
SLIDE 21

Test of inner conduct or Horn Test of inner conduct or Horn 100.000 double pulses in Oct . 2003 100.000 double pulses in Oct . 2003

50°C 20°C Transformer 30°C 20°C Water OUT Horn 26°C 20°C Water IN Horn 34°C 20°C Neck Big diam. 32°C 20°C Neck Small diam. End Start

I = 150kA Wat er Flow = 50l/ min at 1.5 bars Ambient t emp. = 20°C Primary Wat er t emp. = 20°C

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 21

slide-22
SLIDE 22

Cont rols

l a t i g i d

Card Card

Industrial Ethernet CERN network Ethernet Card Applicom Card PLC Local Supervision PC

POWER CONVERTER DISCHARGE CIRCUIT

Designed by Sylvain RAVAT EP/TA3

Control Room supervision 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE

Cont rols

22

slide-23
SLIDE 23

Cont rols Cont rols

PLC Racks

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 23

slide-24
SLIDE 24

Cont rols Cont rols

General View

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 24

slide-25
SLIDE 25

Cont rols Cont rols

Hist orical View

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 25

slide-26
SLIDE 26

Planning Planning

  • Nov. 2003

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 26

slide-27
SLIDE 27

Conclusions Conclusions

Elect rical circuit

  • Good progress since t he beginning of t he proj ect wit h t he

validat ion of t he elect rical circuit .

4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE

Cost Saving of 750kCHF since t he beginning of proj ect .

  • Migrat ion t o an exist ing building wit h new capacit ors.
  • Reusing of t he pulse t ransf ormers.

Test and Key dat e

  • Validat ion of t he f irst Horn inner conduct or wit h 100.000 double

pulses during Oct ober 2003.

  • Test of t he t wo Horns and Ref lect or bef ore t he end of 2004.
  • Power cables will be inst alled at t he beginning of 2005.
  • Moving elect rical circuit in BHA4 at t he beginning of 2005.

27