The CNGS Horns The CNGS Horns Elect rical Syst ems Elect rical Syst ems 4t h workshop on Neut rino Beams and I nst rument at ion 7 11 November 2003 at KEK Gilles. Maire Maire EP/ TA3 EP/ TA3 Gilles. 1 Out line Out line I nt


  1. The CNGS Horns The CNGS Horns Elect rical Syst ems Elect rical Syst ems 4t h workshop on Neut rino Beams and I nst rument at ion 7 – 11 November 2003 at KEK Gilles. Maire Maire EP/ TA3 EP/ TA3 Gilles. 1

  2. Out line Out line � I nt roduct ion. � Elect rical Circuit . � Component s and St at us. � Test of inner conduct or Horn. � Cont rols. � Planning. � Conclusions. 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 2

  3. I nt roduct ion I nt roduct ion Horn and Ref lect or (Load) Horn and Ref lect or (Load) I Every 6s t 50ms •7 m long (approx.) Sandry Wallon IN2P3 • 1.6 tonne (approx.) 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 3

  4. I nt roduct ion I nt roduct ion General View General View Charging Power Supply in surf ace Horn and Ref lect or Power cables I n Target Chamber (~1000m) along Access Galleries Pulse Transf ormer St rip Lines f rom I n Service Gallery Transf ormers t o Horn & Ref lect or 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 4

  5. I nt roduct ion I nt roduct ion Paramet ers Paramet ers Unit HORN System REFLECTOR System Load Peak current kA 150 180 Transformer ratio 16 32 Primary current peak A 9375 5625 Load inductance µH 2,7 X 16 X 16 = 691 1,5 X 32 X 32 = 1540 Total inductance with 4 cables µH 1210 2046 m Ω Load resistance 0,6 X 16 X 16 = 154 0,21 X 32 X 32 = 215 m Ω Total resistance with 4 cables 328 495 Total capacitance for one pulse µF 4080 4080 Pulse duration ms 7,5 10 Charging voltage V 7700 6300 Total stored energy kJ 2 X 119 = 238 2 X 80 = 160 Load max. voltage V 280 150 Mean power dissipated by current kW 16 10,5 only (2 pulses) Total power dissipated (with beam) kW 26 16,5 Water flow for delta T= 5C l/min 70 70 Pressure bar 1,2 1,2 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 5

  6. Elect rical Circuit Elect rical Circuit Diagram Diagram Charging Unit Discharge I 10kV - 20A Circuit 1 Thyristors Bridge Diodes Thyristors Bridge Capa TR Discharge t Polarity Changer Pulse 1 Earthing Start Stop Delay 50ms Charging Charging Power Cables (~1000m) Pulse 2 Experimental Area Thyristors Capa Discharge TR HORN Discharge Circuit 2 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 6

  7. Elect rical Circuit Elect rical Circuit WANF Recuperat ion or NEW ? WANF Recuperat ion or NEW ? Beginning of Project NOW Thy. Bridge WANF Recuperation WANF Recuperation Power Supply Transfo. LV/HV NEW NEW Electronics WANF Recuperation NEW Capacitors WANF Recuperation NEW Discharge Switches NEW NEW Power Cables NEW NEW Pulse Transformers NEW WANF Recuperation 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 7

  8. Component s and St at us Component s and St at us Charging Power Supply Charging Power Supply � Need t o increase charging volt age t o 10kV. • Buy new t ransf ormer (LV/ HV), f irst delivery in J uly 2003 and second f or J uly2004. • All ot her power component s can work at 10kV. 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 8

  9. Component s and St at us Component s and St at us Charging Power Supply Charging Power Supply � Elect ronic regulat ion and int erlocks. • Old and obsolet e regulat ion (25 years old). We had spare cards but elect ronic component s didn’t exist on t he market . • The Power Group will t ake in charge t his inst allat ion af t er commissioning. We will inst all a st andard elect ronics of t his group. The st udy and inst allat ion will be done f or t he end of 2003. 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 9

  10. Component s and St at us Component s and St at us Charging Power Supply Charging Power Supply Old Elect ronic New Elect ronic 6U 24U 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 10

  11. Component s and St at us Component s and St at us Capacit ors Discharge Capacit ors Discharge � At t he beginning of Proj ect • We want ed t o reuse WANF capacit ors. • For saf et y and inf rast ruct ure const raint s, Saf et y Division of Cern f orced t o us t o inst all t his equipment in a new building. The est imat e cost of t his new building was 650kCHF. � Now • Af t er new st udy, we will buy new capacit ors (self healing t echnology) f or a cost of 200kCHF. • We will inst all equipment in an exist ing building. � Call f or Tender • Result of t he Call f or Tender was in J une 2003, AVX-TPC (FR). • Pre-Series in December 2003 and series in Sept ember 2004. 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 11

  12. Component s and St at us Component s and St at us Capacit ors Discharge Capacit ors Discharge Capacitance 340µF + /-5% Operating Voltage 10000Vdc Reverse Voltage 50% Maximum Peak Current 1300A Energy 17kJ Repetition Rate 6sec 2x10 7 pulses Life Time < 3.3 m Ω Serial resistance Capacitor inductance < 100 nH Dielectric Stress 206 V/µm Ignition temperature of Rape seed oil: 344 ° C dielectric fluid Rough polypropylene film Dielectric system metallized L= 360mm Dimensions W= 335mm H= 705mm Weight 102kg 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 12

  13. Component s and St at us Component s and St at us Capacit ors Discharge Capacit ors Discharge 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 13

  14. Component s and St at us Component s and St at us Capacit ors Discharge Capacit ors Discharge � WANF capacit ors • 36 racks wit h a t ot al of 360 capacit ors. � New capacit ors • 12 racks wit h a t ot al of 48 capacit ors. � Result s • Space saving. Number of racks divided by 3. • I mport ant cost saving f or inf rast ruct ure and cabling. Rack wit h WANF capacit ors 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 14

  15. Component s and St at us Component s and St at us Thyrist or Swit ches (20kV, 18kA) Swit ches (20kV, 18kA) Thyrist or - All Th. Swit ches needed have been bought and delivered by ARCEL (FR). - 3 t hyrist ors in series, sharing resist or, RC snubber and impulse t ransf ormer. 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 15

  16. Component s and St at us Component s and St at us Thyrist or Swit ches (20kV, 18kA) Swit ches (20kV, 18kA) Thyrist or 2 Th. Swit ches are already inst alled and t est ed inBA7. • 8,2kV, 170kA wit h rat io 32 • 6,5kV, 150kA wit h rat io 10 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 16

  17. Component s and St at us Component s and St at us Power Cables Power Cables � I mport ant paramet ers f or t he choice of t he power cables. • Resist ance and induct ance cable must be much smaller t han load impedance (Transf ormer, St rip Lines and Horn). � To minimize t he volt age drop in t he cable. � Not t o increase t oo much t he durat ion of t he pulse. � Our choice. • Four 18kV cables in parallel (each wit h 2 t wist ed 150 mm2 CU conduct ors) will be inst alled per syst em. • For 4 cables in parallel, t he resist ance and induct ance (Nexans dat a sheet ) will be : R = 100m Ω , L = 160 µH. • Measurement s have been perf ormed on t he exist ing WANF cables. The impedance of t his cable was R = 110m Ω , L = 130µH. 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 17

  18. Component s and St at us Component s and St at us Pulse Transf ormers Pulse Transf ormers � At t he beginning of t he proj ect • We want ed t o buy 2 new t ransf ormers wit h rat io 14 f or an est imat e cost of 580kCHF. � Now, reusing of WANF t ransf ormers • A t est program has been realized t o validat e t he reusing of t he 2 Tesla pulse t ransf ormers of WANF. • We can reuse t his t ransf ormers in rat ion 32 or 16 (special coupling in t he secondary side. 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 18

  19. Component s and St at us Component s and St at us Pulse Transf ormers Pulse Transf ormers Rat io 32 150000 100000 50000 Simulat ion 0.002 0.004 0.006 0.008 0.01 0.012 -50000 -100000 SL Current Primary Current 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 19

  20. Component s and St at us Component s and St at us Pulse Transf ormers Pulse Transf ormers Rat io 16 150000 100000 50000 Simulat ion 0.001 0.002 0.003 0.004 0.005 0.006 -50000 -100000 SL Current Primary Current 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 20

  21. Test of inner conduct or Horn Test of inner conduct or Horn 100.000 double pulses in Oct . 2003 100.000 double pulses in Oct . 2003 I = 150kA Wat er Flow = 50l/ min at 1.5 bars Ambient t emp. = 20 ° C Primary Wat er t emp. = 20 ° C Start End Neck Small diam. 20 ° C 32 ° C Neck Big diam. 20 ° C 34 ° C Water IN Horn 20 ° C 26 ° C Water OUT Horn 20 ° C 30 ° C Transformer 20 ° C 50 ° C 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 21

  22. Cont rols Cont rols Control Room supervision CERN network Ethernet Card Card Local Supervision PC Applicom Card Card Industrial Ethernet d i g i t a l PLC DISCHARGE POWER CIRCUIT CONVERTER Designed by Sylvain RAVAT EP/TA3 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 22

  23. Cont rols Cont rols PLC Racks 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 23

  24. Cont rols Cont rols General View 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 24

  25. Cont rols Cont rols Hist orical View 4t h NBI , 7 - 11 November 2003 at KEK by Gilles MAI RE 25

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.