CNGS Horns : Status 8 nov. 2003 NBI 2003 KEK, Japan 7-11 nov. 2003 NBI 2003 - CNGS Horns Status 1 Presented by Sandry Wallon CNGS Horns : Status CONTENT 1 .O u t l i n e o f t h e c o n t r i b u t i o n 2 .D


  1. CNGS Horns : Status 8 nov. 2003 NBI 2003 – KEK, Japan 7-11 nov. 2003 NBI 2003 - CNGS Horns Status 1 Presented by Sandry Wallon

  2. CNGS Horns : Status CONTENT 1 .O u t l i n e o f t h e c o n t r i b u t i o n 2 .D e s i g n & s t u d i e s 3 .M a n u f a c t u r e & c h e c k i n g s 4 .M o u n t i n g & a d j u s t m e n t s 5 .S u m m a r y NBI 2003 - CNGS Horns Status 2 Presented by Sandry Wallon

  3. 1. O u t l i n e o f t h e c o n t r i b u t i o n P i o n s a n d k a o n s f o c u s e d b y 2 m a g n e t i c h o r n s t o w a r d G r a n S a s s o French contribution • 2 horns (included 1 spare horn) • 1 reflector • 2 cooling systems • 2 strip lines w/ fast coupling system • 2 sets of adjustable supports NBI 2003 - CNGS Horns Status 3 Presented by Sandry Wallon

  4. 2. Design & studies 7.5 m long 1600 kg of aluminium alloy (+ ceramic, stainless steel, …) 7.5 m long Double pulses within 50 ms 2200 kg Pulse duration : 6 ms (horn) 13 ms (reflector) 6 s cycle during 4 years (2 10 7 pulses) 150 kA (peak), 5000 A RMS Toroidal B field : 1.9 T max. NBI 2003 - CNGS Horns Status 4 Presented by Sandry Wallon

  5. 2. Design & studies Full 3D design Horn NBI 2003 - CNGS Horns Status 5 Presented by Sandry Wallon

  6. 2. Design & studies Other equipement Set of 3 adjustable supports Fast Coupling System & striplines inside chamber / gallery Fast Coupling System (FCS) Striplines and FCS new design Strip lines ⇒ Worker’s protection during loosening / tightening FCS (shielded chicane) ⇒ Better confidence in FCS functionality Not shown : cooling system NBI 2003 - CNGS Horns Status 6 Presented by Sandry Wallon

  7. 2. Design & studies Misc. studies done to guaranty functionalities (especially for horn’s inner conductor) • Thermal : Deformation & Stress. Status Done • Static : Straightness. • Stability : Buckling. • Dynamic : Fatigue-corrosion (4 years lifetime requested). NBI 2003 - CNGS Horns Status 7 Presented by Sandry Wallon

  8. 2. Design & studies ⇒ material behavior Thermal study ⇒ thermal expansion, stresses Heat load (inner cond.) • 13 kW (Joule losses) • 5 kW (radiation) Water curtain falling onto inner conductor NBI 2003 - CNGS Horns Status 8 coeff convection Presented by Sandry Wallon

  9. 2. Design & studies Thermal study ∆ T = 5 °C ∆ T = 8 °C ∆ T = 2 4 °C ∆ T = 3 3 °C T ̃ 4 0 °C m stress Cyclical thermal -0.75 < ∆ L dyn < 0.75 mm stress -10 < σ < 10MPa (thanks to a 1.2 mm enforced 1.5 mm ‘dynamic’ thermal displ. [ ∆ L m =1.2 mm]) expansion enable by thin flange NBI 2003 - CNGS Horns Status 9 Presented by Sandry Wallon

  10. 2. Design & studies D y n a m i c s t u d y ⇒ fatigue strength axi-symmetric vibration mode 1 (140 Hz) movie Pt 1 (mode 1; 1+2) axi-symmetric vibration mode 2 Pt 3 (mode 1+2) (360 Hz) movie Pt 2 (mode 2; 1+2) σ ecr = 54 MPa (mode 2) [1] [1] : From Marek Kozien’s Ansys NBI 2003 - CNGS Horns Status 10 Presented by Sandry Wallon mode 1, mode 2, mode 4 study (Cern / Cracow university)

  11. 2. Design & studies F a t i g u e s t r e n g t h Warning Infinite lifetime do not exist! thermal + mechanical stresses : we are below the envelope curve NBI 2003 - CNGS Horns Status 11 fatigue-corrosion, SN curve 6082 Presented by Sandry Wallon

  12. 3. Manufacture & checkings Large parts Status Horns 1 et 1b : done Reflector : done outer conductor electrical connection NBI 2003 - CNGS Horns Status 12 Presented by Sandry Wallon

  13. 3. Manufacture & checkings Inner conductors Production status Horns 1 & 1b : done Reflector : in progress Rigid flange checking (large) Electrons Beam welding machine 2 inner conductors after EB welding NBI 2003 - CNGS Horns Status 13 Presented by Sandry Wallon

  14. 3. Manufacture & checkings Shot penning inner conductors Horn flanges’ checkings (after machining) → Ultrasonic → X ray → geometrical Horn inner conductors’ checkings (after welding) → X ray (for welds) Horn tronconical parts’ checkings (after machining) Reflector : cheaper processes used → Dye penetrant • rolled & welded sheet • TIG welding Status • dye penetrant (welds) Horns 1 & 1b : done • 3D checking Reflector : production in progress NBI 2003 - CNGS Horns Status 14 2 inner conductors after EB welding Presented by Sandry Wallon

  15. 3. Manufacture & checkings Inner conductor (final) checking Spec required : 1 mm shape tolerance Outer surface axis checking (straightness) clamp flanges 8 m long ‘bench’ intermediate supports NBI 2003 - CNGS Horns Status 15 Presented by Sandry Wallon

  16. 3. Manufacture & checkings Inner conductor (final) checking (as done) outer surface axis checking (straightness) Status Done Job done at Cern by • Ahmed Cherif (3D machine) • Dominique Missiaen (laser tracker) NBI 2003 - CNGS Horns Status 16 Presented by Sandry Wallon

  17. 4. Mounting & adjustements Horn’s mounting BAD surprise There’s a inner cond. non-conformity 2 sets of grooves are uncorrectly located NBI 2003 - CNGS Horns Status 17 Presented by Sandry Wallon

  18. 4. Mounting & adjustements Horn’s inner cond. non-conformity Actions Status → Crisis meeting! Done → Solution proposals → 3D design & drawing jobs → Mini prod. readiness review → Electrical insulators order → New spider manufacture → Outer conductor machining (new spiders locations) ⇒ Σ = 2.5 months → Find where do the mistake come from? ⇒ CAD (design) used as CAD (drafting) Other gift : Inner cond was designed with Euclid CAD soft, other parts and assemblies with Catia CAD soft! NBI 2003 - CNGS Horns Status 18 Presented by Sandry Wallon

  19. 4. Mounting & adjustements Inner conductor straightness adjustment Warning Former picture To be refreshed 1. Put a self centering probe inside inner conductor 2. Check probe position 3. Adjust wires tensile force until to find correct alignment 4. repeat previous job for 2 others cables sets Status Will be performed at (by) Cern within 2004 NBI 2003 - CNGS Horns Status 19 Presented by Sandry Wallon

  20. 4. Mounting & adjustements Centering stems & electrical connection adjustments Warning Former picture To be refreshed How to achieve interchangeability between horn and spare horn? Centering stems : position adjustment / inner conductor axis Electrical connection : position adjustment / inner conductor axis NBI 2003 - CNGS Horns Status 20 Presented by Sandry Wallon

  21. 4. Mounting & adjustements Horn axis adjustment Warning Former picture To be refreshed 2. Tighten / loosen 2 M12 screws (bottom screws) ⇒ vertical displ. ± 20 mm (top screws) ⇒ lateral displ. ± 20 mm 1. Loosen FCS / open strip lines / Unplug strip lines NB connection plates to be machined NBI 2003 - CNGS Horns Status 21 Presented by Sandry Wallon

  22. 5. Summary Horn manufacture : done, except FCS (production review within 1 month) Reflector manufacture : done, except inner conductor (to be deliver within january 2004) Non-conformity trouble : solved Adjustable support : jack received, other parts to be manufactured FCS & Striplines : design to be completed (production review within 1 month) Cooling system : ready for production review? Mechanical tests in progress (S. Rangod, G. Maire) : picture Electrical tests (horns, reflector, FCS) within 2004 NBI 2003 - CNGS Horns Status 22 Presented by Sandry Wallon

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.