siting adviso ry co mmitte e siting adviso ry co mmitte e
play

Siting Adviso ry Co mmitte e Siting Adviso ry Co mmitte e Me e - PowerPoint PPT Presentation

Siting Adviso ry Co mmitte e Siting Adviso ry Co mmitte e Me e ting # 5 Me e ting # 5 U U nive rsity o f Co nne c tic ut nive rsity o f Co nne c tic ut Ma in Ac c umula tio n Are a Ma in Ac c umula tio n Are a Ma rc h 12, 2013 Ma rc h


  1. Siting Adviso ry Co mmitte e Siting Adviso ry Co mmitte e Me e ting # 5 Me e ting # 5 U U nive rsity o f Co nne c tic ut nive rsity o f Co nne c tic ut Ma in Ac c umula tio n Are a Ma in Ac c umula tio n Are a Ma rc h 12, 2013 Ma rc h 12, 2013

  2. Age nda Age nda We lc o me a nd Me e ting Ob je c tive s 4:00 – 4:10 PM • Re vie w MAA F a c ility Sc o ring 4:10 – 4:45 PM • Disc ussio n o f Dra ft Re po rt 4:45 – 5:00 PM • CE PA Pro c e ss 5:00 – 5:30 PM •

  3. Site Sc or Site Sc or ing Re sults ing Re sults

  4. Site Sc or Site Sc or ing Re sults ing Re sults Site Rank Ave r age Sc or e Sc or e Range North Campus Parc e l G Site 1 362 327.5 - 390 W L ot Site 2 348 315.5 - 380 North of T r ansfe r Station Site 3 327 212.5 - 390 F L ot Site 4 306 207.5 - 375 E xisting L oc ation, Ne w F ac ility 5 261 200 - 337.5 E xisting L oc ation, As-Is 6 249 190 - 272.5

  5. Site Sc or Site Sc or ing Re sults ing Re sults Ra ng e

  6. Assigne d Cr Assigne d Cr ite r ite r ia We ight F ia We ight F ac tor ac tor s s Ave r age R ange of E valuation Cr ite r ia We ight Assigne d We ights 1. E nvir onme ntal/ E c ologic al 13.8% 5.0% - 20.0% NDDB 5.7% We tlands and Wate rc o urse s 8.1% 2. Public He alth 11.4% 5.0% - 20.0% Pro ximity to ho me s, stude nt ho using , o r day c are 6.2% Pro ximity to a c a de mic a nd he a lthc a re b uilding s 5.2% 3. Public Wate r Supplie s 23.6% 5.0% - 35.0% Gro undwate r 12.0% Surfac e Wa te r/ Re se rvo ir 11.6% 4. Public Safe ty/ Se c ur ity and Ac c e ssibility 16.0% 5.0% - 40.0% 5. Planning Consiste nc y and L and Use 12.2% 5.0% - 30.0% 6. Cost and R e gulator y Conside r ations 9.8% 5.0% - 15.0% Capital Co st 3.7% Ope ra tio na l E ffic ie nc y a nd Co st 3.8% Re g ula to ry Re q uire me nts 2.3% 7. T r affic Safe ty/ Cir c ulation 13.3% 9.0% - 25.0%

  7. Assigne d Cr Assigne d Cr ite r ite r ia We ight F ia We ight F ac tor ac tor s s

  8. Nor Nor th Campus Par th Campus Par c e l G Site c e l G Site Ra nke d 1 st • Ave ra g e sc o re o f 362; ra ng e o f 327.5 to 390 • Hig he st-ra te d site b y 10 o f the 11 Adviso ry Co mmitte e • me mb e rs L o w po te ntia l fo r e c o lo g ic a l, pub lic he a lth, a nd pub lic • wa te r supply impa c ts Hig h ave ra ge sc o re fo r pub lic sa fe ty/ se c urity a nd • a c c e ssib ility, o pe ra tio na l e ffic ie nc y a nd c o sts, & tra ffic sa fe ty a nd c irc ula tio n – T he site is re mo ve d fro m the ma in c a mpus a re a – Ac c e ss a nd e g re ss fro m No rth Hillside Ro a d

  9. Nor Nor th Campus Par th Campus Par c e l G Site c e l G Site

  10. Nor Nor th Campus Par th Campus Par c e l G Site c e l G Site

  11. W L W L ot Site ot Site Ra nke d 2 nd • Ave ra g e sc o re o f 348; • ra ng e o f 315.5 to 380 Sc o re d slig htly lo we r tha n • the No rth Ca mpus Pa rc e l G site o n the e nviro nme nta l/ e c o lo g ic a l c rite ria – Within 200 fe e t o f NDDB Are a & 220 fe e t fro m we tla nds One c o mmitte e me mb e r • sc o re d the W L o t site a s the hig he st-ra te d site

  12. Nor Nor th of T th of T r r ansfe r ansfe r Station Site Station Site Ra nke d 3 rd • Ave ra g e sc o re o f 327; ra ng e o f • 212.5 to 390 Sc o re d simila r to Pa rc e l G site • fo r mo st c rite ria Sc o re d lo we r fo r pub lic • sa fe ty/ se c urity a nd tra ffic c irc ula tio n due to pro ximity to Ce le ro n T rail a nd L o t C 6 c o mmitte e me mb e rs sc o re d • T ra nsfe r Sta tio n site a s hig he st- ra te d site (tie d with Parc e l G site )

  13. F F L L ot Site ot Site Ra nke d 4 th • Ave ra g e sc o re o f 306; ra ng e o f 207.5 to • 375 Within NDDB Are a a nd is re la tive ly c lo se to • E a g le ville Bro o k a nd a sso c ia te d we tla nds Sc o re d lo w in te rms o f c a pita l c o sts • – E xisting unde rg ro und e le c tric a nd te le c o mmunic a tio n line s Sc o re d lo w re la tive to pub lic • sa fe ty/ se c urity – Clo se pro ximity to UCo nn Pub lic Sa fe ty Co mple x a nd disruptio n to c a mpus se c urity in the e ve nt o f a re le a se

  14. E E xisting L xisting L oc ation (Ne w F oc ation (Ne w F ac ility and As-Is) ac ility and As-Is) a c ility Ra nke d 5 th - Ave ra g e o f Ne w F • 261 – Ave ra g e sc o re s hig he r tha n e xisting fa c ility in te rms o f pub lic sa fe ty/ se c urity a nd a c c e ssib ility & o pe ra tio na l e ffic ie nc y/ c o st a c ility Ra nke d 6 th - Ave ra g e E xisting F • o f 249 – Sc o re d hig he r tha n ne w fa c ility in te rms o f c a pita l c o sts a nd re g ula to ry re q uire me nts Within the pub lic drinking wa te r • supply (PWS) wa te rshe d Inc o nsiste nt with sta te a nd lo c a l • pla nning (PWS issue s)

  15. E E IE IE Pr Pr oc e ss oc e ss Ide ntific ation of State Ac tion E ar ly Pr oje c t Sc oping Public and Age nc y Public Sc oping E IE De te r mination R e vie w and Comme nt Me e ting Ide ntific ation of Issue s & Analysis of Impac ts Dr aft E IE Public and Age nc y Public He ar ing R e vie w and Comme nt F inal E IE R e c or d of De c ision to OPM OPM De te r mination of Ade quac y

  16. E E IE IE Pr Pr oje c t Sc he dule oje c t Sc he dule Mile stone Date Star t of 30-Day CE PA Public Sc oping Pe r iod Apr il 2, 2013 CE PA Public Sc oping Me e ting Apr il 23, 2013 (T ue sday) E nd of 30-Day CE PA Sc oping Pe r iod May 2, 2013 Pr e par ation of Administr ative Dr aft E IE August 2, 2013 Pr e par ation of Public R e vie w E IE August 23, 2013 Star t of 45-Day E IE Comme nt Pe r iod Se pte mbe r 3, 2013 Public He ar ing We e k of Oc tobe r 7, 2013 E nd of 45-Day E IE Comme nt Pe r iod Oc tobe r 18, 2013 R e sponse to Comme nts & F inal E IE / R OD Nove mbe r 15, 2013 OPM and UConn Boar d of T r uste e s Appr oval of R OD De c e mbe r 2013

  17. Que stions?

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend