Siting Adviso ry Co mmitte e Siting Adviso ry Co mmitte e Me e - - PowerPoint PPT Presentation

siting adviso ry co mmitte e siting adviso ry co mmitte e
SMART_READER_LITE
LIVE PREVIEW

Siting Adviso ry Co mmitte e Siting Adviso ry Co mmitte e Me e - - PowerPoint PPT Presentation

Siting Adviso ry Co mmitte e Siting Adviso ry Co mmitte e Me e ting # 5 Me e ting # 5 U U nive rsity o f Co nne c tic ut nive rsity o f Co nne c tic ut Ma in Ac c umula tio n Are a Ma in Ac c umula tio n Are a Ma rc h 12, 2013 Ma rc h


slide-1
SLIDE 1

Siting Adviso ry Co mmitte e Me e ting # 5 Siting Adviso ry Co mmitte e Me e ting # 5

U nive rsity o f Co nne c tic ut Ma in Ac c umula tio n Are a Ma rc h 12, 2013 U nive rsity o f Co nne c tic ut Ma in Ac c umula tio n Are a Ma rc h 12, 2013

slide-2
SLIDE 2
  • We lc o me a nd Me e ting Ob je c tive s

4:00 – 4:10 PM

  • Re vie w MAA F

a c ility Sc o ring 4:10 – 4:45 PM

  • Disc ussio n o f Dra ft Re po rt

4:45 – 5:00 PM

  • CE

PA Pro c e ss 5:00 – 5:30 PM

Age nda Age nda

slide-3
SLIDE 3

Site Sc or ing Re sults Site Sc or ing Re sults

slide-4
SLIDE 4

Site Sc or ing Re sults Site Sc or ing Re sults

Site Rank Ave r age Sc or e Sc or e Range North Campus Parc e l G Site 1 362 327.5 - 390 W L

  • t Site

2 348 315.5 - 380 North of T r ansfe r Station Site 3 327 212.5 - 390 F L

  • t Site

4 306 207.5 - 375 E xisting L

  • c ation, Ne w F

ac ility 5 261 200 - 337.5 E xisting L

  • c ation, As-Is

6 249 190 - 272.5

slide-5
SLIDE 5

Site Sc or ing Re sults Site Sc or ing Re sults

Ra ng e

slide-6
SLIDE 6

Assigne d Cr ite r ia We ight F ac tor s Assigne d Cr ite r ia We ight F ac tor s

E valuation Cr ite r ia Ave r age We ight R ange of Assigne d We ights

  • 1. E

nvir

  • nme ntal/ E

c ologic al 13.8% 5.0% - 20.0%

NDDB 5.7% We tlands and Wate rc o urse s 8.1%

  • 2. Public He alth

11.4% 5.0% - 20.0%

Pro ximity to ho me s, stude nt ho using , o r day c are 6.2% Pro ximity to a c a de mic a nd he a lthc a re b uilding s 5.2%

  • 3. Public Wate r

Supplie s 23.6% 5.0% - 35.0%

Gro undwate r 12.0% Surfac e Wa te r/ Re se rvo ir 11.6%

  • 4. Public Safe ty/ Se c ur

ity and Ac c e ssibility 16.0% 5.0% - 40.0%

  • 5. Planning Consiste nc y and L

and Use 12.2% 5.0% - 30.0%

  • 6. Cost and R

e gulator y Conside r ations 9.8% 5.0% - 15.0%

Capital Co st 3.7% Ope ra tio na l E ffic ie nc y a nd Co st 3.8% Re g ula to ry Re q uire me nts 2.3%

  • 7. T

r affic Safe ty/ Cir c ulation 13.3% 9.0% - 25.0%

slide-7
SLIDE 7

Assigne d Cr ite r ia We ight F ac tor s Assigne d Cr ite r ia We ight F ac tor s

slide-8
SLIDE 8

Nor th Campus Par c e l G Site Nor th Campus Par c e l G Site

  • Ra nke d 1st
  • Ave ra g e sc o re o f 362; ra ng e o f 327.5 to 390
  • Hig he st-ra te d site b y 10 o f the 11 Adviso ry Co mmitte e

me mb e rs

  • L
  • w po te ntia l fo r e c o lo g ic a l, pub lic he a lth, a nd pub lic

wa te r supply impa c ts

  • Hig h ave ra ge sc o re fo r pub lic sa fe ty/ se c urity a nd

a c c e ssib ility, o pe ra tio na l e ffic ie nc y a nd c o sts, & tra ffic sa fe ty a nd c irc ula tio n

– T

he site is re mo ve d fro m the ma in c a mpus a re a

– Ac c e ss a nd e g re ss fro m No rth Hillside Ro a d

slide-9
SLIDE 9

Nor th Campus Par c e l G Site Nor th Campus Par c e l G Site

slide-10
SLIDE 10

Nor th Campus Par c e l G Site Nor th Campus Par c e l G Site

slide-11
SLIDE 11

W L

  • t Site

W L

  • t Site
  • Ra nke d 2nd
  • Ave ra g e sc o re o f 348;

ra ng e o f 315.5 to 380

  • Sc o re d slig htly lo we r tha n

the No rth Ca mpus Pa rc e l G site o n the e nviro nme nta l/ e c o lo g ic a l c rite ria

– Within 200 fe e t o f NDDB Are a

& 220 fe e t fro m we tla nds

  • One c o mmitte e me mb e r

sc o re d the W L

  • t site a s the

hig he st-ra te d site

slide-12
SLIDE 12

Nor th of T r ansfe r Station Site Nor th of T r ansfe r Station Site

  • Ra nke d 3rd
  • Ave ra g e sc o re o f 327; ra ng e o f

212.5 to 390

  • Sc o re d simila r to Pa rc e l G site

fo r mo st c rite ria

  • Sc o re d lo we r fo r pub lic

sa fe ty/ se c urity a nd tra ffic c irc ula tio n due to pro ximity to Ce le ro n T rail a nd L

  • t C
  • 6 c o mmitte e me mb e rs sc o re d

T ra nsfe r Sta tio n site a s hig he st- ra te d site (tie d with Parc e l G site )

slide-13
SLIDE 13

F L

  • t Site

F L

  • t Site
  • Ra nke d 4th
  • Ave ra g e sc o re o f 306; ra ng e o f 207.5 to

375

  • Within NDDB Are a a nd is re la tive ly c lo se to

E a g le ville Bro o k a nd a sso c ia te d we tla nds

  • Sc o re d lo w in te rms o f c a pita l c o sts

– E

xisting unde rg ro und e le c tric a nd te le c o mmunic a tio n line s

  • Sc o re d lo w re la tive to pub lic

sa fe ty/ se c urity

– Clo se pro ximity to UCo nn Pub lic Sa fe ty

Co mple x a nd disruptio n to c a mpus se c urity in the e ve nt o f a re le a se

slide-14
SLIDE 14

E xisting L

  • c ation (Ne w F

ac ility and As-Is) E xisting L

  • c ation (Ne w F

ac ility and As-Is)

  • Ne w F

a c ility Ra nke d 5th - Ave ra g e o f 261

– Ave ra g e sc o re s hig he r tha n e xisting

fa c ility in te rms o f pub lic sa fe ty/ se c urity a nd a c c e ssib ility & o pe ra tio na l e ffic ie nc y/ c o st

  • E

xisting F a c ility Ra nke d 6th - Ave ra g e

  • f 249

– Sc o re d hig he r tha n ne w fa c ility in te rms o f

c a pita l c o sts a nd re g ula to ry re q uire me nts

  • Within the pub lic drinking wa te r

supply (PWS) wa te rshe d

  • Inc o nsiste nt with sta te a nd lo c a l

pla nning (PWS issue s)

slide-15
SLIDE 15

Ide ntific ation of State Ac tion E ar ly Pr

  • je c t Sc oping

Ide ntific ation of Issue s & Analysis of Impac ts Dr aft E IE F inal E IE R e c or d of De c ision to OPM Public Sc oping Me e ting Public and Age nc y R e vie w and Comme nt Public He ar ing Public and Age nc y R e vie w and Comme nt E IE De te r mination OPM De te r mination of Ade quac y

E IE Pr

  • c e ss

E IE Pr

  • c e ss
slide-16
SLIDE 16

E IE Pr

  • je c t Sc he dule

E IE Pr

  • je c t Sc he dule

Mile stone Date Star t of 30-Day CE PA Public Sc oping Pe r iod Apr il 2, 2013 CE PA Public Sc oping Me e ting Apr il 23, 2013 (T ue sday) E nd of 30-Day CE PA Sc oping Pe r iod May 2, 2013 Pr e par ation of Administr ative Dr aft E IE August 2, 2013 Pr e par ation of Public R e vie w E IE August 23, 2013 Star t of 45-Day E IE Comme nt Pe r iod Se pte mbe r 3, 2013 Public He ar ing We e k of Oc tobe r 7, 2013 E nd of 45-Day E IE Comme nt Pe r iod Oc tobe r 18, 2013 R e sponse to Comme nts & F inal E IE / R OD Nove mbe r 15, 2013 OPM and UConn Boar d of T r uste e s Appr

  • val of R

OD De c e mbe r 2013

slide-17
SLIDE 17

Que stions?