Siting Adviso ry Co mmitte e Siting Adviso ry Co mmitte e Me e - - PowerPoint PPT Presentation
Siting Adviso ry Co mmitte e Siting Adviso ry Co mmitte e Me e - - PowerPoint PPT Presentation
Siting Adviso ry Co mmitte e Siting Adviso ry Co mmitte e Me e ting # 5 Me e ting # 5 U U nive rsity o f Co nne c tic ut nive rsity o f Co nne c tic ut Ma in Ac c umula tio n Are a Ma in Ac c umula tio n Are a Ma rc h 12, 2013 Ma rc h
- We lc o me a nd Me e ting Ob je c tive s
4:00 – 4:10 PM
- Re vie w MAA F
a c ility Sc o ring 4:10 – 4:45 PM
- Disc ussio n o f Dra ft Re po rt
4:45 – 5:00 PM
- CE
PA Pro c e ss 5:00 – 5:30 PM
Age nda Age nda
Site Sc or ing Re sults Site Sc or ing Re sults
Site Sc or ing Re sults Site Sc or ing Re sults
Site Rank Ave r age Sc or e Sc or e Range North Campus Parc e l G Site 1 362 327.5 - 390 W L
- t Site
2 348 315.5 - 380 North of T r ansfe r Station Site 3 327 212.5 - 390 F L
- t Site
4 306 207.5 - 375 E xisting L
- c ation, Ne w F
ac ility 5 261 200 - 337.5 E xisting L
- c ation, As-Is
6 249 190 - 272.5
Site Sc or ing Re sults Site Sc or ing Re sults
Ra ng e
Assigne d Cr ite r ia We ight F ac tor s Assigne d Cr ite r ia We ight F ac tor s
E valuation Cr ite r ia Ave r age We ight R ange of Assigne d We ights
- 1. E
nvir
- nme ntal/ E
c ologic al 13.8% 5.0% - 20.0%
NDDB 5.7% We tlands and Wate rc o urse s 8.1%
- 2. Public He alth
11.4% 5.0% - 20.0%
Pro ximity to ho me s, stude nt ho using , o r day c are 6.2% Pro ximity to a c a de mic a nd he a lthc a re b uilding s 5.2%
- 3. Public Wate r
Supplie s 23.6% 5.0% - 35.0%
Gro undwate r 12.0% Surfac e Wa te r/ Re se rvo ir 11.6%
- 4. Public Safe ty/ Se c ur
ity and Ac c e ssibility 16.0% 5.0% - 40.0%
- 5. Planning Consiste nc y and L
and Use 12.2% 5.0% - 30.0%
- 6. Cost and R
e gulator y Conside r ations 9.8% 5.0% - 15.0%
Capital Co st 3.7% Ope ra tio na l E ffic ie nc y a nd Co st 3.8% Re g ula to ry Re q uire me nts 2.3%
- 7. T
r affic Safe ty/ Cir c ulation 13.3% 9.0% - 25.0%
Assigne d Cr ite r ia We ight F ac tor s Assigne d Cr ite r ia We ight F ac tor s
Nor th Campus Par c e l G Site Nor th Campus Par c e l G Site
- Ra nke d 1st
- Ave ra g e sc o re o f 362; ra ng e o f 327.5 to 390
- Hig he st-ra te d site b y 10 o f the 11 Adviso ry Co mmitte e
me mb e rs
- L
- w po te ntia l fo r e c o lo g ic a l, pub lic he a lth, a nd pub lic
wa te r supply impa c ts
- Hig h ave ra ge sc o re fo r pub lic sa fe ty/ se c urity a nd
a c c e ssib ility, o pe ra tio na l e ffic ie nc y a nd c o sts, & tra ffic sa fe ty a nd c irc ula tio n
– T
he site is re mo ve d fro m the ma in c a mpus a re a
– Ac c e ss a nd e g re ss fro m No rth Hillside Ro a d
Nor th Campus Par c e l G Site Nor th Campus Par c e l G Site
Nor th Campus Par c e l G Site Nor th Campus Par c e l G Site
W L
- t Site
W L
- t Site
- Ra nke d 2nd
- Ave ra g e sc o re o f 348;
ra ng e o f 315.5 to 380
- Sc o re d slig htly lo we r tha n
the No rth Ca mpus Pa rc e l G site o n the e nviro nme nta l/ e c o lo g ic a l c rite ria
– Within 200 fe e t o f NDDB Are a
& 220 fe e t fro m we tla nds
- One c o mmitte e me mb e r
sc o re d the W L
- t site a s the
hig he st-ra te d site
Nor th of T r ansfe r Station Site Nor th of T r ansfe r Station Site
- Ra nke d 3rd
- Ave ra g e sc o re o f 327; ra ng e o f
212.5 to 390
- Sc o re d simila r to Pa rc e l G site
fo r mo st c rite ria
- Sc o re d lo we r fo r pub lic
sa fe ty/ se c urity a nd tra ffic c irc ula tio n due to pro ximity to Ce le ro n T rail a nd L
- t C
- 6 c o mmitte e me mb e rs sc o re d
T ra nsfe r Sta tio n site a s hig he st- ra te d site (tie d with Parc e l G site )
F L
- t Site
F L
- t Site
- Ra nke d 4th
- Ave ra g e sc o re o f 306; ra ng e o f 207.5 to
375
- Within NDDB Are a a nd is re la tive ly c lo se to
E a g le ville Bro o k a nd a sso c ia te d we tla nds
- Sc o re d lo w in te rms o f c a pita l c o sts
– E
xisting unde rg ro und e le c tric a nd te le c o mmunic a tio n line s
- Sc o re d lo w re la tive to pub lic
sa fe ty/ se c urity
– Clo se pro ximity to UCo nn Pub lic Sa fe ty
Co mple x a nd disruptio n to c a mpus se c urity in the e ve nt o f a re le a se
E xisting L
- c ation (Ne w F
ac ility and As-Is) E xisting L
- c ation (Ne w F
ac ility and As-Is)
- Ne w F
a c ility Ra nke d 5th - Ave ra g e o f 261
– Ave ra g e sc o re s hig he r tha n e xisting
fa c ility in te rms o f pub lic sa fe ty/ se c urity a nd a c c e ssib ility & o pe ra tio na l e ffic ie nc y/ c o st
- E
xisting F a c ility Ra nke d 6th - Ave ra g e
- f 249
– Sc o re d hig he r tha n ne w fa c ility in te rms o f
c a pita l c o sts a nd re g ula to ry re q uire me nts
- Within the pub lic drinking wa te r
supply (PWS) wa te rshe d
- Inc o nsiste nt with sta te a nd lo c a l
pla nning (PWS issue s)
Ide ntific ation of State Ac tion E ar ly Pr
- je c t Sc oping
Ide ntific ation of Issue s & Analysis of Impac ts Dr aft E IE F inal E IE R e c or d of De c ision to OPM Public Sc oping Me e ting Public and Age nc y R e vie w and Comme nt Public He ar ing Public and Age nc y R e vie w and Comme nt E IE De te r mination OPM De te r mination of Ade quac y
E IE Pr
- c e ss
E IE Pr
- c e ss
E IE Pr
- je c t Sc he dule
E IE Pr
- je c t Sc he dule
Mile stone Date Star t of 30-Day CE PA Public Sc oping Pe r iod Apr il 2, 2013 CE PA Public Sc oping Me e ting Apr il 23, 2013 (T ue sday) E nd of 30-Day CE PA Sc oping Pe r iod May 2, 2013 Pr e par ation of Administr ative Dr aft E IE August 2, 2013 Pr e par ation of Public R e vie w E IE August 23, 2013 Star t of 45-Day E IE Comme nt Pe r iod Se pte mbe r 3, 2013 Public He ar ing We e k of Oc tobe r 7, 2013 E nd of 45-Day E IE Comme nt Pe r iod Oc tobe r 18, 2013 R e sponse to Comme nts & F inal E IE / R OD Nove mbe r 15, 2013 OPM and UConn Boar d of T r uste e s Appr
- val of R
OD De c e mbe r 2013