RFP S72-T29275 Operations & Maintenance and Service Life - - PowerPoint PPT Presentation

rfp s72 t29275
SMART_READER_LITE
LIVE PREVIEW

RFP S72-T29275 Operations & Maintenance and Service Life - - PowerPoint PPT Presentation

Aircraft Support Systems RFP S72-T29275 Operations & Maintenance and Service Life Renewals Services Air ircraft Support Systems Operations & Main intenance and Service Lif ife Renewal Services Operations & Maintenance Ten


slide-1
SLIDE 1

RFP S72-T29275

Aircraft Support Systems Operations & Maintenance and Service Life Renewals Services

slide-2
SLIDE 2

Air ircraft Support Systems Operations & Main intenance and Service Lif ife Renewal Services

Operations & Maintenance

  • Ten (10) Year Contract
  • Three Levels of Service
  • Best Management Practices
  • Industry Standard
  • Reactive Services

Service Life Renewal

  • Replacement of HAS Selected PBB’s
  • New Installation of PBB’s
  • Upgrades to Associated Infrastructure and Equipment
slide-3
SLIDE 3

Terminal D Ramp Area

14 PBB’s See Appendix I

slide-4
SLIDE 4

Wide Body/A380 PBB

slide-5
SLIDE 5

Wide Body/A380 PBB

slide-6
SLIDE 6

Wide Body/A380 PBB

slide-7
SLIDE 7

Interior of PBB

slide-8
SLIDE 8

Interior of PBB

slide-9
SLIDE 9

PCA Attached To The PBB

slide-10
SLIDE 10

GPU 180 KVA Attached To The PBB

slide-11
SLIDE 11

PWC Stand Alone & Attached To The PBB

slide-12
SLIDE 12

Wide/Narrow Body PBB

slide-13
SLIDE 13

GPU For Wide/Narrow Body Gates

slide-14
SLIDE 14

Terminal D Basement Generators/Chiller For Support Equipment

slide-15
SLIDE 15

Terminal D Basement Generators/Chiller For Support Equipment

slide-16
SLIDE 16

Terminal D Basement Generator/Chiller For Support Equipment

slide-17
SLIDE 17

Terminal A North Ramp

10 Jetway PBB’s

slide-18
SLIDE 18

Jetway PBB’s

slide-19
SLIDE 19

Interior of the PBB

slide-20
SLIDE 20

Interior Of The PBB

slide-21
SLIDE 21

Support Equipment PWC

slide-22
SLIDE 22

Support Equipment GPU

slide-23
SLIDE 23

Support Equipment PCA

slide-24
SLIDE 24

Terminal A Southside Ramp

5 Thyssen PBB’s 4 Jetway PBB’s

slide-25
SLIDE 25

Thyssen PBB’s

slide-26
SLIDE 26

Interior of PBB

slide-27
SLIDE 27

Interior of PBB

slide-28
SLIDE 28

Support Equipment PWC

slide-29
SLIDE 29

Support Equipment PCA

slide-30
SLIDE 30

Jetway PBB’s

slide-31
SLIDE 31

Interior of Jetway PBB

slide-32
SLIDE 32

Support Equipment PWC & GPU

slide-33
SLIDE 33

Support Equipment PCA

slide-34
SLIDE 34

Sample Of Support Equipment

See Appendix II

slide-35
SLIDE 35

Sample Of Support Equipment

See Appendix II

slide-36
SLIDE 36

Sample Of Support Equipment

See Appendix II

slide-37
SLIDE 37

Sample Of Support Equipment

See Appendix II