P o r t o f P a s c o
Rail, River, and Air Transportation in P o r t o f - - PowerPoint PPT Presentation
Rail, River, and Air Transportation in P o r t o f - - PowerPoint PPT Presentation
Rail, River, and Air Transportation in P o r t o f P a s c o the Tri-Cities Freight Mobility Strategic Investment Board September 15, 2017 In the Heart of the Pacific Northwest P o r t o f P a
P o r t o f P a s c o
In the Heart of the Pacific Northwest
Frozen French Fry Capital of the World
P o r t o f P a s c o
Foster Wells Business Center (2003)
Osprey Pointe
(2008)
Tri-Cities Airport
(1963)
Pasco Processing Center
(1995) Marine Terminal (1958) Airport Business Center (2005)
Big Pasco Industrial Center (1958)
Container Barge Terminal (1975) Airport Industrial Park (1963)
Port of Pasco Properties
Franklin County
P o r t o f P a s c o
Projected 2035 Daily Train Use
2014 WSDOT Freight Rail Plan
66 | 38 56 | 41 13 | 39
P o r t o f P a s c o
BNSF Pasco Classification Yard
P o r t o f P a s c o
PORT OF PASCO
SHIPPERS/TRANSLOADERS
- Mid-Columbia
Warehousing
- Inland Empire
Distribution Systems
- KIS International
- Crown Moving
- Dura-Plastics
- Propak
- Lampson Crane
- Zen-Noh Hay
Local Rail Facilities BIG PASCO INDUSTRIAL CENTER
P o r t o f P a s c o
Pasco Processing Center
Local Rail Facilities
LARGE SHIPPERS
Preferred Freezer Services Railex Facility
P o r t o f P a s c o
River Shipping
TRI-CITIES VICINITY
Tidewater Tri-Cities Grain Tesoro Scoular Cargill Unocal Port of Pasco WWGG Boise Cascade Port of Benton CHS
PASCO
PORTLAN D
P o r t o f P a s c o
River Shipping
TRI-CITIES VICINITY
Tidewater Tri-Cities Grain Tesoro Scoular Cargill Unocal Port of Pasco WWGG Boise Cascade Port of Benton CHS
PASCO
PORTLAN D
P o r t o f P a s c o
Container Shipping
PASCO
PORTLAN D
P o r t o f P a s c o
Direct Flights from Tri-Cities Airport (PSC)
Minneapolis Phoenix Denver Seattle Los Angeles Las Vegas Salt Lake City Portland San Francisco
PSC C - Tr Tri-Citie ies A Air irpor port
Start h tart here
- re. Go
Go any anywhere.
PSC
P o r t o f P a s c o
2015/2016 Passenger Boardings Northwest Airports
5,000,000 10,000,000 15,000,000 20,000,000 25,000,000
P o r t o f P a s c o
Airport Terminal Expansion
1966 2002 2016
Project Cost: Start Date: End Date:
$57 M Aug 2014 Jan 2017
P o r t o f P a s c o
Airport Terminal Expansion
New Restaurant and Gallery
P o r t o f P a s c o
Randy Hayden
Executive Director Port of Pasco 509-547-3378 www.portofpasco.org