Rail Cargo Terminal-BILK Co.Ltd. Rail Cargo Terminal - BILK Budapest Center Railway line Rail Cargo Terminal-BILK Rail Cargo Terminal - BILK Excellent location Corridor 6 Rail Cargo Terminal - BILK 3 26. 11. Excellent location Corridor


slide-1
SLIDE 1

Rail Cargo Terminal - BILK

Rail Cargo Terminal-BILK Co.Ltd.

slide-2
SLIDE 2

Rail Cargo Terminal - BILK

Rail Cargo Terminal-BILK Railway line Budapest Center

slide-3
SLIDE 3

Rail Cargo Terminal - BILK

Excellent location

26. 11.

3

Corridor 6

slide-4
SLIDE 4

Rail Cargo Terminal - BILK

Excellent location

26. 11.

4

Corridor 7

slide-5
SLIDE 5

Rail Cargo Terminal - BILK

Rail Cargo Terminal

  • BILK Zrt.
slide-6
SLIDE 6

Rail Cargo Terminal - BILK

slide-7
SLIDE 7

Rail Cargo Terminal - BILK

Container handling

7

slide-8
SLIDE 8

Rail Cargo Terminal - BILK

Rail network

8

HAMBURG TRIESTE KOPER RIJEKA BREMERHAVEN ROTTERDAM

Curtici

PLOJESTI

CONSTANTA

NEUSS MÜNCHEN Duisburg

WELS

CHERTOMLIK

LJUBLJANA

SALZBURG WIEN

LINZ

Novi Sad Pireus

slide-9
SLIDE 9

Rail Cargo Terminal - BILK 34% 15% 3% 6% 12% 30%

Traffic share according to destination 2014

Koper Neuss Rumania Waggon groups Duisburg North harbours

Traffic share

9 32% 17% 7% 16% 28%

Traffic share according to destination 2013

Koper Neuss Waggon groups Duisburg North harbours

slide-10
SLIDE 10

Rail Cargo Terminal - BILK

Traffic share

10

16,28% 53,10% 30,07% 0,55%

Traffic share according to rail operators 2014

HUPAC RCO EGIM Egyéb

slide-11
SLIDE 11

Rail Cargo Terminal - BILK

  • „Minor” depot
  • Container repair works
  • Photographed seal control
  • Flexitank installation
  • Handling of reefer containers
  • ADR/RID
  • Opening hours => non-stop

Additional services

11

slide-12
SLIDE 12

Rail Cargo Terminal - BILK

„Minor” depot Container repair works

slide-13
SLIDE 13

Rail Cargo Terminal - BILK

Photographed seal control

13

  • The photo is forwarded to the client
  • The photos are stored
  • The service is offered for export

consignments

  • Upon the client’s request
  • The seal is photographed
  • Upon arrival and/or
  • After being loaded to the wagon
slide-14
SLIDE 14

Rail Cargo Terminal - BILK 14

Flexitank installation

14

slide-15
SLIDE 15

Rail Cargo Terminal - BILK

Handling of refrigerator containers

15

  • Galvanised steel rack, 4 reefer places
  • n each level and each side, 3 levels 

a total of 24 reefer places

  • 48 plugs are available
  • Suitable for handling 6 times more

refrigerator containers on double size area

  • Moder illumination for better visibility
  • 2-2 reefer places on two sides of a small pillar
  • 2-2 containers could be refrigerated next to

each other, if the container was on two containers high, a several hundred kilogram mobile rack had to be moved Previous system New rack system system

slide-16
SLIDE 16

Rail Cargo Terminal - BILK

  • Date and time of connecting to

electricity, temperature

  • During the checks date, time and

temperature, and the name of the employee performing the recording

Handling of reefer containers Due to an IT development, the following datas are recorded

16

  • Date, time and temperatur when

disconnected from the refrigerator

slide-17
SLIDE 17

Rail Cargo Terminal - BILK

Development for providing the highest level of satisfaction Truck plate and container number identification system

17

Expansion of the camera system – 40 sets Fully GPS-based territory

slide-18
SLIDE 18

Rail Cargo Terminal - BILK

Truck plate and container number identification

18

  • Truck plate and container number

identification systems were installed at the entrance and exit points of the terminal, recording the truck plates of all vehicles entering and leaving, and the number of the transported container(s)

  • The data are forwarded to the Terminal

Management Software, accelerating the entrance and exit processes.

slide-19
SLIDE 19

Rail Cargo Terminal - BILK

GPS system

19

  • New loading areas were established:
  • For increasing the storage capacity
  • In accordance with the new

regulation specified by the Disaster Management (distinguishing the ADR/RID storage areas, registration)

  • In addition to the reachstackers

(Kalmars), the GPS equipment determining the storage areas were installed on the two gantry cranes as well – use of a standard system on all loading machines

slide-20
SLIDE 20

Rail Cargo Terminal - BILK

The terminal management system of Rail Cargo Terminal-BILK Co.Ltd. is called JOKONT. This system is available for saving all the information belonging to each unit that has ever been at the terminal. These movement infos could regarding to the following:

  • Date of arrival
  • Truck plate / waggon number
  • Container datas (number, rail operator, shipping company, consignee, size, weight,

UN-number, rail destination, etc.)

  • All the coordinates on which the unit was stored
  • Invoicing datas
  • Date when the container left the terminal

Complex Terminal Management System

20

slide-21
SLIDE 21

Rail Cargo Terminal - BILK

  • Rail traffic
  • Road traffic
  • Depot
  • Storage positions
  • Handling instructions
  • Document recording
  • Custom procedure

The moduls of JOKONT

  • Invoicing
  • Statistical modul
  • Reefer containers
  • ADR/RID containers
  • Modul for maintenance workers
  • External communication
  • Archive / history