Public Open House Big Lake Recreation Center February 7, 2017 - - PowerPoint PPT Presentation

public open house
SMART_READER_LITE
LIVE PREVIEW

Public Open House Big Lake Recreation Center February 7, 2017 - - PowerPoint PPT Presentation

Public Open House Big Lake Recreation Center February 7, 2017 7:00pm 9:00pm 7:30pm Presentation Don Fancher, Alaska DOT&PF Project Manager Airport Leah Henderson , DOWL Project Master Manager Plan Team Mark Mayo ,


slide-1
SLIDE 1

Public Open House

Big Lake Recreation Center February 7, 2017 7:00pm – 9:00pm 7:30pm Presentation

slide-2
SLIDE 2 DOWL

BGQ

Airport Master Plan Team

  • Don Fancher, Alaska DOT&PF Project

Manager

  • Leah Henderson, DOWL Project

Manager

  • Mark Mayo, DOWL Planning Lead
  • Tom Middendorf, DOWL Planner and

Land Use Lead

  • Chris Cole, DOWL Planner
slide-3
SLIDE 3 DOWL

BGQ

Agenda

  • Meeting purpose
  • Master Plan purpose and

elements

  • FAA obligation
  • Schedule
  • Airside/Landside issues and

needs

  • Forecast
  • Needs and issues
  • Discussion
  • Next steps/schedule
slide-4
SLIDE 4 DOWL

BGQ

Meeting Purpose

  • Explain Master Plan purpose

and process

  • Identify Master Plan issues

and needs

  • Discuss preliminary aircraft

activity forecast and proposed design aircraft

slide-5
SLIDE 5 DOWL

BGQ

Airport Master Plan Purpose

  • Guide future airport

development

  • Identify airport capital

improvements

  • Determine whether airport

improvements should be funded with FAA grants

slide-6
SLIDE 6 DOWL

BGQ

Airport Master Plan Basic Elements Public involvement Inventory of existing conditions Forecast of future activity

  • Demand/capacity analysis
  • Facility requirements
  • Alternative improvement

scenarios

  • Recommended plan
slide-7
SLIDE 7 DOWL

BGQ

Obligating the Airport

FAA Airport Improvement Program (AIP) grant funding comes with “strings” attached:

  • Manage land use around airport
  • Long range plan to address design

standards

  • Manage access onto the airport

BGQ would compete with other airports for available federal funding

slide-8
SLIDE 8 DOWL

BGQ

Schedule

  • Condition and Needs Assessment –

December to March

  • Land Use Assessment – December to

March

  • Alternatives, Evaluations, and

Recommendations – April to July

  • Airport Master Plan Report – June to

December

slide-9
SLIDE 9 DOWL

BGQ

Airside Issues and Needs

  • Runway Safety Areas

– Obstructions (Runway 07) – RSA design

  • Airspace standards

– Primary surface – Approach surfaces

  • Taxiway design
  • Runway length
  • RNAV GPS approach
  • On-site weather reporting
slide-10
SLIDE 10 DOWL

BGQ

Landside Issues and Needs

  • Security

– Fencing , gates, lighting – Unauthorized boundary crossings

  • Seaplane access
  • Lease lot availability
  • On-site M&O

facility/equipment

  • On-site fuel vendor
  • Off-airport land use

compatibility

slide-11
SLIDE 11 DOWL

BGQ

Preliminary Draft Forecast

Base Year 2016 2021 2026 2031 2036 BGQ Based Aircraft Low Forecast 72 78 84 91 103 Moderate Forecast 72 81 92 106 132 High Forecast 72 86 102 124 170 BGQ Operations - Total Low Forecast 13,285 14,097 14,960 15,941 17,272 Moderate Forecast 13,285 14,807 16,506 18,546 21,545 High Forecast 13,285 15,546 18,194 21,543 26,827

Design aircraft through 2036 -> Cessna 185 “Design Aircraft” = most demanding aircraft to operate at the airport at lease 500 times/year; determines existing and future airport design requirements

slide-12
SLIDE 12 DOWL

BGQ

Open Discussion

  • Questions?
  • Additional issues and needs?
slide-13
SLIDE 13 DOWL

BGQ

Next Steps/Plan Schedule

  • FAA forecast approval - March

2017

  • Public Meeting #2 - May 2017

– Discuss alternative improvement scenarios

  • Public Draft Airport Master Plan

– November 2017

  • Final Airport Master Plan -

December 2017

slide-14
SLIDE 14 DOWL

BGQ

Contact us

DOT&PF Don Fancher – Project Manager

  • (907) 269-0516
  • donald.fancher@alaska.gov

DOWL Leah Henderson– Project Manager

  • (907) 562-2000
  • lhenderson@dowl.com

Project information

http://www.biglakeairportmasterplan.com

Comments

biglakeairportmasterplan@dowl.com

slide-15
SLIDE 15 DOWL

BGQ

Thank You!!