Point Defiance Park Parking & Circulation Study PUBLIC MEETING #4 PUBLIC MEETING #4 OPEN HOUSE OPEN HOUSE February 10, 2018 Toda days Presentation ys Presentation HISTORY How the project developed PROJECT Scope of Work, Limits


slide-1
SLIDE 1

Point Defiance Park

Parking & Circulation Study

PUBLIC MEETING #4 PUBLIC MEETING #4 OPEN HOUSE OPEN HOUSE

February 10, 2018

slide-2
SLIDE 2

Toda day’s Presentation y’s Presentation HISTORY How the project developed

PROJECT

Scope of Work, Limits of Study

PROGRESS

Design work, Public Process

DESIGN

Recommended Options (30% Design)

FUTURE

Schedule, Final Design, Permitting, Construction

slide-3
SLIDE 3

Pr Project Hist

  • ject Histor
  • ry

1911 Hare & Hare Master Plan 1990s Reversal of traffic around the Bowl 2008 Concept Plan

– 2005 Public Involvement

2015 Master Plan Update

– Public Meetings – Jan, Feb, Mar, Apr, May 2016 – Recommendations for:

  • New Circulation Patterns
  • Pedestrian/Bicycle Paths
  • Parking

2016 Parking & Circulation Study

– A/E Consultant Selection – April 2016 – MPT Workshops – June/July 2016 – Public Meetings and Schematic Design (Sept 2016-Present)

Park Board Meeting Minutes June 10, 1946

  • “The Secretary was further instructed to invite

the Commissioner of Public Safety to attend the next meeting of the Commissioners for discussion

  • f the problem of handling traffic on streets

adjacent to playgrounds, parks and more particularly the problem of handling traffic at Point Defiance Park on Saturday, Sunday and holidays.”

slide-4
SLIDE 4

Pr Project Scope De

  • ject Scope Development

lopment

Existing Traffic Congestion

  • 2015 Master Plan

Update

  • Limited Parking
  • Inefficient Vehicle

Circulation

  • Pedestrian/Bike

Access Needs

2014 Bond Funding

  • New Aquarium
  • Waterfront Phase 1
  • Owen Beach
  • Other

DRA Requirements for Parking

  • New Roundabout
  • Sidewalk

Improvements

  • Ongoing

Monitoring of Off- site Impacts

P

slide-5
SLIDE 5

Scope of W Scope of Work rk

Pedestrian Circulation Vehicle Circulation/ Multimodal Mobility Parking Management

slide-6
SLIDE 6

Pr Project Boundar

  • ject Boundary
slide-7
SLIDE 7

20 2015 Mast Master er Plan Plan

slide-8
SLIDE 8

Pr Project Goals

  • ject Goals

Integrated Priorities SOLVE CURRENT PROBLEMS

Parking, Circulation, Safety

PLAN FOR THE FUTURE ACCOMMODATE ALL USERS

Drivers, Cyclists, Runners, Walkers, Recreational

PRESERVE THE PARK

slide-9
SLIDE 9

2008 Concept Plan and 2008 Concept Plan and 20 2015 Mast Master Plan Objectiv er Plan Objectives es

  • 1. Preserve, respect, and enhance the integrity of the Park’s history and beauty
  • 2. Create an exceptional pedestrian environment
  • 3. Enhance the visitor experience through education, recreation, leisure, and safety
  • 4. Create a destination and gathering place
  • 5. Provide financially sustainable opportunities to enhance revenue for

maintenance and operations

  • 6. Encourage water‐related/dependent activities
  • 7. Complete missing link between Ruston Way and Point Defiance
slide-10
SLIDE 10

Par Parking & Cir ing & Circulation Study ulation Study

Public Mee Public Meetings ings

Pedestrian Circulation (Loop Trail) SEPTEMBER 2016

  • Surveys
  • Interactive Stations

Parking/Mobility DECEMBER 2016

  • Multimodal Mobility
  • Parking Solutions (Interim and Long‐Term)

Vehicular Circulation FEBRUARY 2017

  • 1‐way to 2‐way “Zoo‐to‐Pearl Street” Revision
  • Owen Beach Intersection
slide-11
SLIDE 11

PEDES PEDESTRIAN RIAN AND BICY AND BICYCLE CLE CIR CIRCULA ULATION ION

slide-12
SLIDE 12

Public In Public Input put Int Interactiv ractive Feedback eedback

slide-13
SLIDE 13
slide-14
SLIDE 14

Loop T Loop Trail – ail – Path Design Options ath Design Options

slide-15
SLIDE 15

Loop T Loop Trail ail Pref Preferred erred Ro Route

slide-16
SLIDE 16

Pedestrian Cir destrian Circulation ulation Final R Final Recommendations commendations

Loop Trail “Preferred Option”

  • Design 2018‐2019
  • Construction 2020

Tree Protection and Pavement Reuse are high priorities

  • Public input on future

design in 2018‐1029

slide-17
SLIDE 17

VEHICLE VEHICLE CIR CIRCULA ULATION ION

slide-18
SLIDE 18

Existing R Existing Road ad Netw Networ

  • rk
slide-19
SLIDE 19

20 2015 Mast Master er Plan Updat Plan Update

Ve Vehicular Cir Circulation ulation Im Impr provements ements

slide-20
SLIDE 20

Zoo A Zoo Access R ccess Road ad

(2) 1‐way lanes converted to 2‐way – striping change Road Widening slope impacts Road Widening – tree impacts

Ev Evalu aluation C tion Crit iteria eria Ad Adva vantages:

  • Reduction i

ction in t traf affic a c around Bo nd Bowl ( (37% le 7% less)

  • More direct access t

More direct access to Zoo Zoo (1.5 mi t (1.5 mi to 0.5 mi) 0.5 mi)

  • Im

Impr proves the Zoo and Park u es the Zoo and Park user e er experience perience

  • Reduces car and pedes

duces car and pedestrian int an interacti raction

  • Allo

Allows f ws for fut r future public trans re public transit opti t options

  • ns

Di Disadv sadvantages ges:

  • Minor tree clearing

Minor tree clearing

slide-21
SLIDE 21

Access t ccess to Ow Owen Beach en Beach

Ev Evalu aluation C tion Crit iteria eria Ad Adva vantages:

  • Elimin

Eliminat ates es the turn the turnof

  • ff t

to Ow Owen Beach (of en Beach (often en miss missed) ed)

  • Create

tes a a contro rolled i inte tersection t to i improve saf safety ty

  • Allo

Allows ws for saf r safe ped/bik ped/bike access t access to Ow Owen Beach en Beach Di Disadv sadvantages ges:

  • Minor v

Minor vegetati getation remo

  • n removal

5 mile Drive – 1 way – 1 vehicle lane and shared use path Possible new entrance

  • Ex. Entrance road converted

to Shared Use Path LEGEND: One‐way Traffic Two‐way Traffic Shared Use Path

slide-22
SLIDE 22

Two w

  • way access t

y access to F Fort Nisq Nisqually ually

Ev Evalu aluatio tion Crit Criter eria Advantages: ntages:

  • Im

Impr proved ed access t access to F Fort Nisq Nisquall lly

  • Im

Impr proved ed access t access to Cam Camp 6 fr 6 from

  • m

PDZA PDZA Disadv Disadvantages: antages:

  • Widening w

Widening would add im uld add imper pervious ious ar area ea and associ and associated im impact t ct to trees trees

slide-23
SLIDE 23

Ve Vehicle C Circulation

Final R Final Recommendations commendations

2‐way Road Conversion from Pearl

  • St. Entrance to Zoo
  • Anticipated

Construction 2020 Revise Owen Beach Intersection

  • Anticipated

Construction 2020 Remove 1‐way Owen Beach turnoff

  • Anticipated

Construction 2020 2‐way Road to Fort Nisqually impacts trees

  • Not recommended

now

slide-24
SLIDE 24

PARKING RKING

slide-25
SLIDE 25

20 2015 Mast Master er Plan Updat Plan Update Pa Parking rking Im Impr provements ements

slide-26
SLIDE 26

Parking Management Solutions Parking Management Solutions

  • Surface Parking Lots
  • Internal Shuttle Pilot
  • Public Transit Pilot
  • Improved Bicycle/Pedestrian Access

Interim Solutions

  • Parking Garage(s)
  • Permanent Shuttle System
  • Improved Transit Access
  • Pay-for-Parking
  • Integrated multi-modal hub

Long-Term Solutions

slide-27
SLIDE 27

Parking Garage Options - ing Garage Options - Zoo

  • Identified in the

2015 Master Plan

  • Built over existing

parking lot

  • Analyzed several
  • ptions
  • Sustainable design

Sustainable design

slide-28
SLIDE 28

PA PARKING

Final R Final Recommendations commendations

Parking Garage at existing Zoo lot

  • Construction TBD

Temporary parking at Triangle

  • Anticipated 2019

Temporary/improved parking at SAMI/ Camp 6

  • Anticipated 2020

Owen Beach parking improvements

  • Anticipated

Construction 2020

slide-29
SLIDE 29

MUL MULTIMOD IMODAL AL MOBILIT MOBILITY

slide-30
SLIDE 30

Bicycle Walking Shuttle Public Transportation Ferry Trolley Valet Off‐site parking Car Driverless Cars Rideshare Uber/Taxi

Tr Transportation M Modes

slide-31
SLIDE 31

Pier Pierce T ce Transit ansit Tr Trolley

Summer 20 Summer 2017 -

  • Do

Downt wntown t wn to

  • Pt. Def
  • Pt. Defiance

ance Visit Visitor Cent r Center er and Zoo and Zoo

slide-32
SLIDE 32

Zoo Fort Nisqually Viewpoints Owen Beach Waterfront/Peninsula Boat Trailer Parking Triangle Camp 6 SAMI Marina/Boathouse Gardens

Fu Future P Parkwide Shuttle Ser Shuttle Service? ice?

slide-33
SLIDE 33

MUL MULTI-MOBILIT TI-MOBILITY

Final R Final Recommendations commendations

Implement all‐inclusive Pt. Defiance Shuttle

  • Anticipated 2019

Continue to partner with Pierce Transit for bus service inside Pt. Defiance

  • To Be Determined

Pursue offsite

  • pportunities for

parking/shuttle

  • To Be Determined
slide-34
SLIDE 34

WHA WHAT’S NEXT? ’S NEXT?

slide-35
SLIDE 35

IDEAS

  • Programming/

Analysis

  • Funding
  • Bond/Grant
  • Public Support

CONCEPT

  • Research
  • Public

Involvement

  • Concept

Plans

  • Master Plan

SCHEMATIC DESIGN

  • 30% Design
  • Cost Estimating
  • Public

Involvement

FINAL DESIGN PERMITTING 2018‐2019

BIDDING CONSTRUCTION 2020