ATL WEST DECK COMPONENT
Holder-Austin-Moody-Bryson, a Joint Venture
October 10th, 2017
Project Information Session / Meet and Greet # 3 - - PowerPoint PPT Presentation
ATL WEST DECK COMPONENT Project Information Session / Meet and Greet # 3 Holder-Austin-Moody-Bryson, a Joint Venture October 10 th , 2017 Agenda 1. HAMB, a JV Company Overview 2. ATL West Deck Project Description / Update 3. Trade
October 10th, 2017
Design Team / Document Release Information
HKS, INC Fitzgerald Collaborative Group Walker Parking Consultants Thornton Tomasetti
HelixProject on 10/20/17
Steel H-Piles Roadway Utilities MSE Walls Bridge Extension Site Walls / Paving Signalization
Water Utilities Sanitary Utilities
PED Bridge Steel Framing Skin Steel Support Steel Railings Bollards
Office Windows Curtainwall (Elevator Core Wall) Glass Doors
Fabricoil Skin System Artwork Framing
ETFE Canopy Steel Framing Steel Wiring / Diagrid
Interior Deck Column Wraps PED Bridge Insulated Panels Architectural Louvers
Fluid Applied Below Grade Foundation Drains Expansion Joints PED Walkway Traffic Coatings
Office Walls IDF/Electrical Closet Walls Door Frame Install
Office Walls Office Ceilings Wall Insulation Wall Framing
Office Areas Edge Paint Conditions Interior Elevator Core Walls
Frames / Doors
Office Doors / Frames / Hardware IDF / Electrical Room D/F/H Hardware for Glass Sliding Doors Door Installation
Restroom Partitions Restroom Accessories Fire Extinguishers / AED Units
Cameras / License Plate Readers Access Control / Monitoring Entrance / Exit Lanes Space Availability (Red/Green) Hardware for Systems Entrance Security Booths
Perimeter Fire Lane Paving/Curbs Exterior Flatwork / Paving Adjustments Space Striping (5,700 spaces) Custom Striping Directional Striping
Site Walls Site Heavy Duty Paving Trees / Shrubs / Sod Site Amenities
Fiber / Security / Low Voltage
Signage
Code Required Signage West Deck Signage Wayfinding Signage
Fire Protection
Deck / PED Bridge Dry System Office Sprinkler System
Roofing
Roofing at Stair Enclosures Roofing at Elevator Cores
Loading Dock Equipment
Corner Guards / Edge Angles
Office Area Millwork
Permanent Fencing Access Gates
Carpet / Tile / Resilient / Base
*Based on size / scope, certain bid package due dates may extend past 3 weeks
Advertisements Outreach Prequalification Subs Notified of Status
RFP Issued to Subs
Pre-Proposal Meeting Proposal Submission Scope Meetings Final Bid Evaluation Owner Approval Subcontract Award Issue Subcontract
Request for Qualifications Information Sessions, Association Meetings, Industry Events Subs Complete Prequalification Statements and Return to HAMB Available Status: Prime Subcontractors, Sub-Prime Subcontractors HAMB Forms of Agreement Discuss Project Scope, Prime Subs and Sub-Prime Subs Network Sealed Envelope to HAMB Scope Review with Each Firm that Submits Final Bid Evaluation Presented to COA,DOA Owner Approval of Subcontract Award HAMB Awards the Work to Successful Proponent HAMB Issues Subcontract to Successful Proponent