ATL WEST DECK COMPONENT Project Information Session / Meet and Greet # 3 Holder-Austin-Moody-Bryson, a Joint Venture October 10 th , 2017 Agenda 1. HAMB, a JV Company Overview 2. ATL West Deck Project Description / Update 3. Trade


slide-1
SLIDE 1

ATL WEST DECK COMPONENT

Holder-Austin-Moody-Bryson, a Joint Venture

October 10th, 2017

Project Information Session / Meet and Greet # 3

slide-2
SLIDE 2

Agenda

1. HAMB, a JV Company Overview 2. ATL – West Deck Project Description / Update 3. Trade Package Information 4. HAMB Prequalification Process 5. HAMB Procurement Process 6. Meet & Greet

slide-3
SLIDE 3

» Holder Construction Company » Austin Commercial » C.D. Moody Construction » Bryson Constructors

HAMB, JV Company Overview

Our Joint Venture – Construction Manager at Risk

slide-4
SLIDE 4

» 7 Story, Cast-In-Place Parking Deck » +/- 2,000,000 Total Square Feet » Interior Courtyard at all levels » +/- 5,700 Parking Spaces » 3,000 SF interior office build-out » New Elevated Pedestrian Bridge connecting to existing rail » RCC Parkway – New Elevated Bridge / Intersection » Project EBO Goals – 17.5% MBE & 13% FBE, 30.5% Total » August 2017 – Start date » Fall 2019 – Project Completion

ATL – West Deck

Project Overview

slide-5
SLIDE 5

ATL – West Deck

Project Overview / Update – August 2017

slide-6
SLIDE 6

ATL – West Deck

Project Overview / Update – September 2017

slide-7
SLIDE 7

» INSERT IMAGE

ATL – West Deck

slide-8
SLIDE 8

» INSERT IMAGE

ATL – West Deck

slide-9
SLIDE 9

ATL – West Deck

slide-10
SLIDE 10

ATL – West Deck

slide-11
SLIDE 11

ATL – West Deck

slide-12
SLIDE 12

» INSERT IMAGE

ATL – West Deck

slide-13
SLIDE 13

Design Team / Document Release Information

  • HFWT, A Joint Venture

HKS, INC Fitzgerald Collaborative Group Walker Parking Consultants Thornton Tomasetti

  • Bidding Documents – 95% “Construction Documents”
  • Drawing Release Date – 10/19/2017
  • 100% IFC Drawing Release Date - 11/16/2017
  • Drawing Invites will be sent directly to each bidder via

HelixProject on 10/20/17

ATL – West Deck

Trade Package Information

slide-14
SLIDE 14

Roadway / Bridge Package (Turnkey)

Steel H-Piles Roadway Utilities MSE Walls Bridge Extension Site Walls / Paving Signalization

Site Utilities (Remaining)

Water Utilities Sanitary Utilities

ATL – West Deck

Trade Package Information

Structural / Misc. Steel

PED Bridge Steel Framing Skin Steel Support Steel Railings Bollards

  • Misc. Framing / Support

Glass / Glazing

Office Windows Curtainwall (Elevator Core Wall) Glass Doors

slide-15
SLIDE 15

Exterior Skin

Fabricoil Skin System Artwork Framing

Canopy

ETFE Canopy Steel Framing Steel Wiring / Diagrid

ATL – West Deck

Trade Package Information

Metal Panels

Interior Deck Column Wraps PED Bridge Insulated Panels Architectural Louvers

Waterproofing

Fluid Applied Below Grade Foundation Drains Expansion Joints PED Walkway Traffic Coatings

  • Misc. Sealants / Caulking
slide-16
SLIDE 16

Masonry

Office Walls IDF/Electrical Closet Walls Door Frame Install

Drywall

Office Walls Office Ceilings Wall Insulation Wall Framing

ATL – West Deck

Trade Package Information

Paint

Office Areas Edge Paint Conditions Interior Elevator Core Walls

  • Misc. Paint

Frames / Doors

Doors / Frames / Hardware

Office Doors / Frames / Hardware IDF / Electrical Room D/F/H Hardware for Glass Sliding Doors Door Installation

slide-17
SLIDE 17

Specialties

Restroom Partitions Restroom Accessories Fire Extinguishers / AED Units

Parking Controls

Cameras / License Plate Readers Access Control / Monitoring Entrance / Exit Lanes Space Availability (Red/Green) Hardware for Systems Entrance Security Booths

ATL – West Deck

Trade Package Information

Asphalt Paving / Striping / Curb

Perimeter Fire Lane Paving/Curbs Exterior Flatwork / Paving Adjustments Space Striping (5,700 spaces) Custom Striping Directional Striping

Hardscape / Landscape

Site Walls Site Heavy Duty Paving Trees / Shrubs / Sod Site Amenities

Special Systems

Fiber / Security / Low Voltage

slide-18
SLIDE 18

Signage

Code Required Signage West Deck Signage Wayfinding Signage

Fire Protection

Deck / PED Bridge Dry System Office Sprinkler System

Roofing

Roofing at Stair Enclosures Roofing at Elevator Cores

Loading Dock Equipment

Corner Guards / Edge Angles

ATL – West Deck

Trade Package Information

Millwork

Office Area Millwork

Site Security / Fencing

Permanent Fencing Access Gates

Flooring

Carpet / Tile / Resilient / Base

slide-19
SLIDE 19

» Visit www.hambjvteam.com » Click on Prequalification Tab » Download, Complete and Return the Prequalification Form to Doretha Smith (dsmith@hambjv.com) » HAMB will review Prequalification results for each package » All contracts over $5,000,000 must be a Joint Venture » Joint Venture must be with business owner of different race and/or gender » Prequalification letters will be issued by Package » Prime Subcontractor » Sub-Prime Subcontractor

ATL – West Deck

Prequalification Process

slide-20
SLIDE 20

Prequalification Process

slide-21
SLIDE 21

Prequalification Process

slide-22
SLIDE 22

Prequalification Process

slide-23
SLIDE 23

ATL – West Deck

Procurement Process

» Basis of Evaluation

» Pricing » Completion of “Scope Checklist” » Plan to Execute the Work » EBO Participation Plan » Workforce Development Plan » Project Team » Schedule » Unit Prices Bid Due Dates – 11/10/17, 3 weeks after drawings released

*Based on size / scope, certain bid package due dates may extend past 3 weeks

slide-24
SLIDE 24

Prequalification Process

slide-25
SLIDE 25

Advertisements Outreach Prequalification Subs Notified of Status

RFP Issued to Subs

Pre-Proposal Meeting Proposal Submission Scope Meetings Final Bid Evaluation Owner Approval Subcontract Award Issue Subcontract

Request for Qualifications Information Sessions, Association Meetings, Industry Events Subs Complete Prequalification Statements and Return to HAMB Available Status: Prime Subcontractors, Sub-Prime Subcontractors HAMB Forms of Agreement Discuss Project Scope, Prime Subs and Sub-Prime Subs Network Sealed Envelope to HAMB Scope Review with Each Firm that Submits Final Bid Evaluation Presented to COA,DOA Owner Approval of Subcontract Award HAMB Awards the Work to Successful Proponent HAMB Issues Subcontract to Successful Proponent

slide-26
SLIDE 26

ATL – West Deck

Scope Checklist Format

slide-27
SLIDE 27

THANK YOU FOR COMING! ATL – WEST DECK MEET AND GREET PRESENTATION IS POSTED TO WWW.HAMBJVTEAM.COM