portmetrovancouver.com 1 Projects Requiring PMV Review The 3 - - PowerPoint PPT Presentation

portmetrovancouver com
SMART_READER_LITE
LIVE PREVIEW

portmetrovancouver.com 1 Projects Requiring PMV Review The 3 - - PowerPoint PPT Presentation

portmetrovancouver.com 1 Projects Requiring PMV Review The 3 Criteria of a Project: 1. A physical activity consists of carrying out tasks or actions involved with construction, modification, operation, and decommissioning (i.e. involving a


slide-1
SLIDE 1

portmetrovancouver.com

1

slide-2
SLIDE 2

portmetrovancouver.com

Projects Requiring PMV Review

The 3 Criteria of a Project:

  • 1. A physical activity consists of carrying out tasks or actions involved

with construction, modification, operation, and decommissioning (i.e. involving a degree of physical effort).

  • 2. A physical work includes structures that have been built by humans and

that have a defined area and fixed locality (i.e. has a local permanence).

  • 3. Federal lands as defined by section 2(1) of CEAA 2012: this applies to

proposed Projects that are wholly or partially located on lands and waters managed by Port Metro Vancouver.

2

slide-3
SLIDE 3

portmetrovancouver.com

PER Review Categories Description

3

slide-4
SLIDE 4

portmetrovancouver.com

Process Steps Overview

4

Review Phases Steps W hat’s subm itted Phase 1 : Prelim inary Review

Step 1 : Prelim inary Project I nquiry

Preliminary Project Inquiry Submitted

Step 2 : Prelim inary Project I nquiry Review Step 3 : Application Subm ission

Application Form and Documents Submitted

Step 4 : Com pleteness Check APPLI CATI ON CONSI DERED COMPLETE. APPLI CANT NOTI FI ED. CLOCK STARTS.

Phase 2 : Application Review

Step 5 : Application Review Step 6 : Project Decision DECI SI ON MADE. APPLI CANT NOTI FI ED. CLOCK STOPS.

Phase 3 : Monitoring

Step 7 : Perm it Conditions Follow -up

slide-5
SLIDE 5

portmetrovancouver.com

Project Example – Category A

5

Requirem ents:

  • Category A/ B

application form Project Facts:

  • One for one pile

replacement project

  • Piles replaced in

close proximity to the location of the piles to be removed

  • Piles removed in

entirety

  • Supporting

documents included location drawings and installation methodologies

  • No consultation

required

slide-6
SLIDE 6

portmetrovancouver.com

Project Example – Category B

6

Requirem ents:

  • Construction

notification

Project Facts:

  • Shoreline protection

works

  • 1000 m 2 footprint –

no change from previous footprint

  • Placement of 1200

m 3 of rip rap

  • Removal of 3 piles
slide-7
SLIDE 7

portmetrovancouver.com

Project Facts:

  • 28,000 square

metre (300,000

  • sq. ft.)

warehouse

  • 218 parking stalls
  • 65 trailer stalls
  • Paving, fencing,

landscaping

  • New and existing

utilities

Project Example – Category C

7

Requirem ents:

  • Traffic Impact

Study

  • Landscaping Plan
  • Public notification
  • Municipal

consultation

  • Construction

notification

  • Building Permit
slide-8
SLIDE 8

portmetrovancouver.com

Project Example – Category D

8

Requirem ents:

  • Preliminary

Comment Period

  • Road, Rail and

Marine Studies

Project Facts:

  • New grain

terminal facility development

  • Demolition of

existing structures

  • 48 concrete silos
  • f 51.8 m (170

ft.) tall

  • Berth demolition

and upgrade

  • Environmental

Studies

  • Seismic and Flood

Impact considerations

  • View & Alternative

Siting Analysis

  • Public, Stakeholder &

Aboriginal Consultation